Mep Design In India - Conserve Solution

Slides:



Advertisements
Similar presentations
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Advertisements

Management of The Royal Parks
Case Study – LEED Platinum Building – May 2008 Al Habtoor Leighton Proposed Head Office Dubai, UAE LEED Platinum Building Presented by Mario Seneviratne.
Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
ADEQ Headquarters, North Little Rock, Arkansas Building Assessment for New Construction and Major Renovations for compliance with Federal Requirements.
Louisiana Pathways. Where are we now… We’ve launched our Louisiana brand of integrated career pathways across the state – Train to Attain We are providing.
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 24, 2008 – Phoenix, Arizona Roles and Responsibilities.
Contractor Safety Management
Green Offer Building Business Sustainability
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
Chapter 11: More about USGBC and LEED 1 © 2015 Green Building Academy. All rights reserved.
Boston, MA July 21-22, 2011 Tony Marino, Tom Gallagher, Larry Beck
ISO Environmental Management System JVC Registration Overview.
1 WELCOME to the GSA Proposal Preparation Workshop Webinar: Commercial Price Lists and Workshop Pre-work Presenter: Tracie Grant, Consultant, Logistic.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Company Confidential Registration Management Committee (RMC) The OP Assessor Process San Diego, CA January 19, 2012 Melvin L. Jeppson ATK Propulsion Systems.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
Life Cycle Assessment Overview of LCA and Methodology October 30, 2012.
The OP Assessor Process
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 16, 2009 – Orlando, Florida Roles and Responsibilities.
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Training: Prepare to meet the Buyers July 22, Small Business Resources Presented by: M. Clyde Stoltzfus Director, Southeast Pennsylvania PTAC The.
Evaluation in the GEF and Training Module on Terminal Evaluations
Company Confidential Registration Management Committee (RMC) What’s Next for Oversight? 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
CAPTURE PLANNING – Uncovering Contract Opportunities December 08, 2010 Collaboration Redefined.
10/20/ The ISMS Compliance in 2009 GRC-ISMS Module for ISO Certification.
Third Party Verification Services. Who are these people?  These are 3 rd party verification companies hired by large companies, often called Owner.
Client & Spouse Name 1234 Client Address City, State Zip Your Name with Company Name Office: Cell: Website:
Let Ascension take your business to new heights Tender Manager Scott Warnock Andrew Smillie.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
GROUP 3. Establishing a Uniform System of Accounts (USoA) for the NESI The USoA establishes the regulatory accounting reporting framework for all licensees.
Presented by Sally Bardossy ENVIRONMENTAL MANAGEMENT SYSTEM presented by Sally Bardossy.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
CIS Office Support Ltd. Background New CIS Scheme Sage 50 Accounts and CIS What you should do to prepare How we can help Questions & Answers Agenda.
Inception Report: 21st March, 2012
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Company Confidential Registration Management Committee (RMC) CB Report Cards – Auditor Influence July 2015 Charleston, SC R. Darrell Taylor RMC Chair 1.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Mezyad Engineering Consultants L.C.C is an Multidisciplinary engineering consultancy that was founded in It helps clients to optimize the performance.
The following training presentation is for all Advancia Corporation subcontract employees and is taken upon joining a contract or task order to which Advancia.
CHANGE MANAGEMENT - PART 2 MODULE 7
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
9 Stage Online Consultancy for ISO Certification ISO Auditor Training ISO Documentation.
GSAS Certification & Consultants in Qatar
GSAS Certification in Qatar
LEED AP BD+C Exam Preparation: Overview
Best LEED Training in Qatar
Professional MEP Training in Chennai
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
Jitasa Overview.
Presented by: AfDB Team Facilitator: Sophie DIMBUNGU
A New Quality Program for the Water Industry
Overview of ISO 9001:2015 –Quality Management SysteM
Global Connections Day Building Safety Service Provider
Marketing Profile.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Welcome To HOME. GSASUSGBCICAQGBC Excellence... We always work with enthusiasm, talent and quality in order to propose the best and most effective.
Why Need LEED AP BD+C Exam Preparation ?
AUDITORS & ACCOUNTANTS
LEED AP BD+C Made Easy Welcome to Green Building Academy’s LEED AP BD+C Examination preparation course LEED AP BD+C Made Easy © Conserve Green.
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Evaluation in the GEF and Training Module on Terminal Evaluations
EN/AS/SJAC 9101 Re-Write EN/AS/SJAC 9101 Audit Process Coordination Draft IAQG Working Group Prepared by: Tony Marino The Boeing Company Supplier Quality.
2010 Audit Summary Results YEAR 100% Verified Failed Reduced 2010
Aerodrome Certification Workshop
Presentation transcript:

PreQualification Presentation

 Our Services  Sustainability Services  Sustainability Projects  Company - Organization Chart  Project – Organization Chart Agenda

Conserve Green Building & MEP Solutions Sustainability MEP Design support Specialized Simulations Training

GSAS Projects

Civil Defense and Preventive Buildings

Doha College

Doha Metro Depot Project: Doha Metro Depot (DT.RSD & SY.RSD) Client: Q-Rail Consultant: SENER Contractor: Mitsubishi Heavy Industries Limited/FUJITA Corporation GSAS Typology: GSAS v2.1 Neighborhood Scheme Target Rating: 4-Stars Scope: Design Stage GSAS Facilitation

Qatar Foundation Stadium

Al Bayt Stadium Project: Al Bayt Stadium Depot Client: Aspire PMC: KEO Contractor: GSIC & L&P JV GSAS Typology: GSAS v2.1 Sports Typology Target Rating: 4-Stars Scope: Construction Stage GSAS Facilitation

Police College Complex

Katara Hills Phase III

Beema Office Building

GSAS Certification Approach

Targeting GSASv2.1 Design & Build 1* Certification [Aggregate score should not be less than 0] GSASv2.1 Neighborhood Development Scoring sheet was developed for the project Project Basics & GSAS Requirements

Approach for Certification- Design Receive LOC Address GORD Comments GSAS Gate Submission Quality Check Preparation of documentation Project Registration Develop Project score card and responsibility matrix Design workshop with Project team Review of Design for Compliance with GSAS Mandatory requirements

Final Certification GSAS Gate Submission Conformance to Design Audits Quality Check Prepare Construction stage documentation Track material submittals and ensure compliance with GSAS requirement Prepare Material compliance strategy and compliance forms Workshop with Construction team Approach for Certification- Construction

Thank You Website: