1 Construction of Water Bars and Turn-Outs 2005, Mid Star Timber Harvesting, Inc.

Slides:



Advertisements
Similar presentations
PLAY SCIENCE Earth Con-Seal From RegentsEarth.com.
Advertisements

Lecture 8: Design of Erodible Channels
Fundamentals of Engineering
Orthogonal Projection
Chapter 1 The Study of Body Function Image PowerPoint
Unit C: Forest Management
1 Unit C: Forest Management Lesson 3: Measuring Timber Stands.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Warning Signs.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Sources of Nonpoint Source Water Pollution in forestry and silviculture: - Timber harvesting - Roads - Wildfire - Recreation.
Year 6 mental test 5 second questions
D.T. unit 5C: Moving Toys How to make a moving toy.
SI23 Introduction to Computer Graphics
Module Floor Systems.
Woodwork Joints 2.
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Building Relationships
Loading and Unloading Students
Force & Motion review.
MICRO-BUMP ASSIGNMENT FOR 3D ICS USING ORDER RELATION TA-YU KUAN, YI-CHUN CHANG, TAI-CHEN CHEN DEPARTMENT OF ELECTRICAL ENGINEERING, NATIONAL CENTRAL UNIVERSITY,
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
EMS Checklist (ISO model)
Fact-finding Techniques Transparencies
1 Technical Element Recognition Article 7. 2 All Apparatus Body Position Requirements -Tucked < (less than) 90º hip and knee angle in salto and dance.
Lectures 6&7: Variance Reduction Techniques
Lifting Techniques.
Negotiating With Influence & Persuasion
Job-Specific Safety Training Room Attendant
ABC Technology Project
An Owatonna RC Modelers Presentation
Copyright © Cengage Learning. All rights reserved.
Male haircuts - Classic cut
Aurum’s Cristal® Veneers
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
© Duncan Cochrane Canoe Polo Level 1 Coaching Course By Duncan Cochrane Australian Canoeing Award Scheme.
School Bus Safety – Elementary school
25 seconds left…...
How to annotate simple drawings for use in constructing an object
Copyright © 2010 Pearson Education, Inc. All rights reserved Sec
Signs, Signals, and Pavement Markings
We will resume in: 25 Minutes.
Concrete Construction Part 1
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
Male haircuts - Parallel layers
Subsidy Types, their impacts on tariff and ways of treating them.
Chapter 9 Water Erosion and Deposition
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
The Energy of Waves Physical Science.
Profile Leveling.
RIVER FORMATION EARTH’S GRAVITATIONAL FORCE PULLS OBJECTS TOWARD IT’S CENTER OF MASS. WATER FALLING DOWN A SLOPE IS EVIDENCE OF GRAVITY. AS OBJECTS DROP.
Construction And Analysis of Hydrographs ©Microsoft Word clipart.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Setting up correctly Different types and their use
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
Profile Leveling.
HYDROSPHERE 2.
BEST MANAGEMENT PRACTICES (BMP’S)
Chapter 9 Water Erosion and Deposition
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
Weekly lesson objectives
Presentation transcript:

1 Construction of Water Bars and Turn-Outs 2005, Mid Star Timber Harvesting, Inc.

2 Purpose This course has been designed to ensure all equipment operators who work in forestry operations have the knowledge and skills necessary to properly and consistently construct, maintain, and repair water bars and turn-outs in accordance with Best Management Practices for Forestry. This course has been designed to ensure all equipment operators who work in forestry operations have the knowledge and skills necessary to properly and consistently construct, maintain, and repair water bars and turn-outs in accordance with Best Management Practices for Forestry.

3 Course Objectives Demonstrate correct size, distances between, and angle of construction for water bars Demonstrate correct size, distances between, and angle of construction for water bars Demonstrate correct size, distances between, angle of construction, and outfall design for turn-outs Demonstrate correct size, distances between, angle of construction, and outfall design for turn-outs Learn step-by-step procedures for constructing a water bar/turn-out system. Learn step-by-step procedures for constructing a water bar/turn-out system. Consider alternative construction techniques for water bars and turn-outs when faced with non- routine situations Consider alternative construction techniques for water bars and turn-outs when faced with non- routine situations

4 The Erosive Effects of Moving Water The purpose of water bars and turn-outs is to prevent erosion of the road surface and ditches by forcing water to leave the road bed and enter the forest floor. The purpose of water bars and turn-outs is to prevent erosion of the road surface and ditches by forcing water to leave the road bed and enter the forest floor. As water moves down-grade, it picks up soil and carries it away, resulting in erosion. The farther the water is allowed to travel down the road bed, the more velocity it will gain. As water moves down-grade, it picks up soil and carries it away, resulting in erosion. The farther the water is allowed to travel down the road bed, the more velocity it will gain. If the distance the water is allowed to travel is not somehow shortened, the increasing velocity of the water can result in increased erosion of the road bed and an undesirable amount of silt being carried to the forest floor when the water finally reaches a point of discharge from the road bed. If the distance the water is allowed to travel is not somehow shortened, the increasing velocity of the water can result in increased erosion of the road bed and an undesirable amount of silt being carried to the forest floor when the water finally reaches a point of discharge from the road bed.

5 Water Bar Design Considerations Water bars must be designed so that water is not allowed to travel great distances down the road bed before being discharged and should in most cases be constructed so that the road bed may still be used by light truck traffic. Water bars must be designed so that water is not allowed to travel great distances down the road bed before being discharged and should in most cases be constructed so that the road bed may still be used by light truck traffic. By constructing water bars of a sufficient height, width, angle from the road edge, and distance between them, erosion control objectives can be met while maintaining aesthetic qualities that are pleasing to forest road owners and users. By constructing water bars of a sufficient height, width, angle from the road edge, and distance between them, erosion control objectives can be met while maintaining aesthetic qualities that are pleasing to forest road owners and users.

6 Water Bar Construction Time To properly construct water bars takes time. To properly construct water bars takes time. A good rule of thumb to use when constructing water bars is to allow thirty minutes for each water bar constructed on an average road bed twenty-four feet wide. A good rule of thumb to use when constructing water bars is to allow thirty minutes for each water bar constructed on an average road bed twenty-four feet wide. Patience during construction will ensure the water bar will continue to function properly for years to come. Patience during construction will ensure the water bar will continue to function properly for years to come.

7 Water Bar Size Water bars should reach all the way across the road, be approximately 12 feet wide at the base, and 2 feet high from the uphill trough to the crest. Water bars should reach all the way across the road, be approximately 12 feet wide at the base, and 2 feet high from the uphill trough to the crest. 12 2

8 Distance Between Water Bars The table below shows recommended distances between adjacent water bars depending on the slope of the road. The table below shows recommended distances between adjacent water bars depending on the slope of the road. SlopeDistance 3%200 5%135 10%80 15%20 20%45 30%35

9 Distance Between Water Bars Instead of having to remember the slope to distance relationship shown in the previous table, a good rule of thumb is to use the method shown below. Instead of having to remember the slope to distance relationship shown in the previous table, a good rule of thumb is to use the method shown below. Standing at the crest (or trough)of the lower water bar, the crest (or trough) of the next water bar uphill should be at approximately eye level. Standing at the crest (or trough) of the lower water bar, the crest (or trough) of the next water bar uphill should be at approximately eye level.

10 Angle of Construction for Water Bars Water bars should be constructed at approximately 30 degrees to the direction of travel on the road. This angle will allow the water to flow off the surface of the road with little or no obstruction in flow. Water bars should be constructed at approximately 30 degrees to the direction of travel on the road. This angle will allow the water to flow off the surface of the road with little or no obstruction in flow. Although ideally there will be minimal silt carried in the water diverted by a properly constructed water bar, during heavy rainfall, as water reaches a water bar built directly across the road, it tends to resist an abrupt change in direction of flow and will either jump the water bar or deposit excess silt in the trough during the change in direction and velocity….. Although ideally there will be minimal silt carried in the water diverted by a properly constructed water bar, during heavy rainfall, as water reaches a water bar built directly across the road, it tends to resist an abrupt change in direction of flow and will either jump the water bar or deposit excess silt in the trough during the change in direction and velocity…..

11 Angle of Construction for Water Bars Over time, excess silt deposited in the trough can reduce the working height of the water bar and render it ineffective. Over time, excess silt deposited in the trough can reduce the working height of the water bar and render it ineffective. By building the water bar at an angle, the water retains enough of its initial velocity to keep the trough cleaned out and the water bar will remain effective over a longer period of time. By building the water bar at an angle, the water retains enough of its initial velocity to keep the trough cleaned out and the water bar will remain effective over a longer period of time.

12 Angle of Construction for Water Bars A rule of thumb for achieving the correct angle of a water bar is shown below. A rule of thumb for achieving the correct angle of a water bar is shown below. Step off the distance from the beginning of where you want the water bar on one side of the road straight across to the other side. Divide that distance by three and step the resulting distance downhill to find the ending point of the water bar.

13 Turn-Outs It goes without saying that water bars would be completely ineffective without a means for water to exit the road. Turn-outs are used at every water bar and as needed along the road to allow water an escape to the forest floor. It goes without saying that water bars would be completely ineffective without a means for water to exit the road. Turn-outs are used at every water bar and as needed along the road to allow water an escape to the forest floor. The proper construction of turn-outs is as important as water bars to prevent erosion and excessive siltation of the forest floor. The proper construction of turn-outs is as important as water bars to prevent erosion and excessive siltation of the forest floor.

14 Turn-Out Size The size of turn-outs should be at least as wide at the entrance to the turn-out as the width of the water bar or ditch that feeds water into it. This prevents any bottleneck in the flow of water from the water bar or ditch to the turn- out. The turn-out should then broaden and flatten out as it continues onto the forest floor. The size of turn-outs should be at least as wide at the entrance to the turn-out as the width of the water bar or ditch that feeds water into it. This prevents any bottleneck in the flow of water from the water bar or ditch to the turn- out. The turn-out should then broaden and flatten out as it continues onto the forest floor.

15 Distance Between Turn-Outs Turn-outs should be placed at the exit side of every water bar and at every opportunity along the road. Turn-outs should be placed at the exit side of every water bar and at every opportunity along the road. The bottom line is this: The bottom line is this: You really cant have too much road drainage. Install turn-outs as often as possible along the road on each side to carry water off the traveling surface of the road. You really cant have too much road drainage. Install turn-outs as often as possible along the road on each side to carry water off the traveling surface of the road.

16 Distance Between Turn-Outs The following table shows some guidelines for distances between turn-out installations based on the slope of the road. The following table shows some guidelines for distances between turn-out installations based on the slope of the road. SlopeDistance 3%235 5%180 10%140 15%125 Remember, in most cases, you cant have too much drainage! Remember, in most cases, you cant have too much drainage!

17 Angle of Construction for Turn-Outs Turn-outs should be built at the same angle as the water bar that feeds it. In the case of a stand-alone turn-out, it should gradually curve away from the road toward the forest floor, but in no case should the outfall be greater than 90 degrees from the direction of travel on the road.

18 Angle of Construction for Turn-Outs Right Wrong

19 Outfall Design for Turn-Outs The outfall section of a turn-out should be flat andabout a dozer blade wide, if possible. The outfall section of a turn-out should be flat and about a dozer blade wide, if possible. There should be no obstruction to prevent water from flowing freely out of the outfall. Standing water in a turn-out after a rain is an indication of an improperly constructed one.

20 Water Bar/Turn-Out Construction Step 1 Determine the landowner/customers objectives. Some want a more thorough job than others based on financial or time constraints. Some may want water bars built not only to prevent erosion, but also to prevent access. In this case, the water bars should be built higher and steeper than normal. A clear understanding beforehand can prevent most dissatisfaction with jobs after completion.

21 Water Bar/Turn-Out Construction Step 2 Assess the terrain and soil type and develop a plan. Based on terrain and soil type observations, decisions can be made on water bar and turn-out placement and frequency. Sandy soils need more frequent water bars and turn-outs than rocky ones. Make a note of any stream crossings or streamside management zones in your planned work zone. These require special treatment in order to avoid water quality violations.

22 Water Bar/Turn-Out Construction Step 3 Remove any organic debris (leaves, straw, grass, sticks) from the surface of the road in the areas around where water bars are to be constructed. This debris, if mixed in with the soil used to construct a water bar, will not allow the soil to become cohesive and stabilize. Also, remove any organic debris from the area where the turn-out leading out of a water bar is to be constructed. If at all possible, soil from the turn-out area should be brought back into the road and used in the construction of the water bar.

23 Water Bar/Turn-Out Construction Step 4 Step off or visualize the correct angle and size of construction. Gather the soil into a pile shaped slightly larger than you think you will need for the finished water bar. The lowest part of the trough should be cut out of natural ground, if possible. Pack the entire pile by walking back and forth over it with your machine (dozer, skidder, etc.).

24 Water Bar/Turn-Out Construction Step 5 Finish shaping the pile with the blade of your machine. If the road is to be used while the water bars are in place, this step is crucial to the aesthetic quality of the job. Any excess material bladed off the uphill side of the water bar should be placed on the downhill side. Using a dozer, you should be able to blade all the way over the water bar, keeping the blade in contact with the ground. If not, the crest of the water bar is probably too sharp.

25 Water Bar/Turn-Out Construction Step 6 If you were able to use dirt for the water bar from the turn-out area, complete construction of the system by finish grading the turn-out at the exit side of the water bar. The turn-out should slope downhill from the water bar at about the same rate of slope as the water bar that feeds it.

26 Non-Routine Situations Inevitably situations will arise where these guidelines for water bars and turn-outs will not be practicable. When faced with those situations, you should study carefully any possibilities and options available. The most important thing to remember is the reason you are building water bars and turn-outs on the road to begin with: Inevitably situations will arise where these guidelines for water bars and turn-outs will not be practicable. When faced with those situations, you should study carefully any possibilities and options available. The most important thing to remember is the reason you are building water bars and turn-outs on the road to begin with: ELIMINATE OR REDUCE THE POSSIBILTY OF EROSION! ELIMINATE OR REDUCE THE POSSIBILTY OF EROSION!