Unit 12 Construction Surveying

Slides:



Advertisements
Similar presentations
Construction Surveys
Advertisements

Land Rights and the Slums
Legal Descriptions and Site Plan Requirements
Applying Profiling Leveling Techniques
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Florida Real Estate Principles, Practices & Law 38th Edition
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
EDT 51-Floor Plan Design1 CHAPTER 12 Legal Descriptions and Site Plan Requirements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
MODULE THREE SCALES AND DIMENSIONS
PowerPoint Presentation
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Dr. Dan Trent Mississippi Valley State University January 28, 2013.
Chapter 8 Plot Plans.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Standard Grade Graphic Communications
Chapter #1: Basics of Surveying
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Principles of Surveying
Chapter 14 Legal Descriptions and Site Plan Requirements.
Pyramid Construction Pyramids Square Rectangle Hex Cone.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Understanding maps Geographical Data Skills (Part 1)
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Chapter 12 Legal Descriptions and Site Plan Requirements.
Harry Williams, Earth Science1 EARTH SCIENCE: LOCATION, GRID SYSTEMS, MAPS, GIS. GRID SYSTEMS: Since geography deals with the position of features on the.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Legal Descriptions LEARNING OBJECTIVES: Explain the importance of an accurate legal description. Discuss the three methods of describing real estate. Apply.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Competency: Draw exterior elevations
Topographic Maps Topographic maps show the shape of Earth’s surface and other surface features, such as roads, buildings, streams, cemetaries, mines, etc.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Unit: Introduction to Land Surveying Lesson: Methods of Surveying
Mapping Chapter 16. Uses of Topographic Maps To determine the topography or relief of a tract of land. To determine hydrologic features such as drainage.
Lesson Applying Differential Leveling Techniques.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 4: Legal Descriptions.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Chapter 2 Reading Site Plans. Chapter Overview Introduction to Reading Site Plans Understanding Legal Descriptions Site Plan Fundamentals Topography Reading.
PowerPoint Presentation
ARCHITECTURAL DRAWINGS
Florida Real Estate Principles, Practices & Law 39th Edition
Investigation of Road Project
Building Planning and Drawing
Common Surveys Used For Commercial Real Estate Transactions
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Building Planning And Drawing
Competency: Draw exterior elevations
The Fundamentals of Mapping
Chapter 15 Site Plan Layout.
Architectural Drafting Unit 2
Site Plan Requirements
INTRODUCTION TO GEOMATIC ENGINEERING
INTRODUCTION OF GEOMATIC
Site Plan A plan that shows the contours of a site, as well as any existing topographical features and structures. The site plan may also show proposed.
Competency: Create site plan drawings
Competency: Create site plan drawings
Presentation transcript:

Unit 12 Construction Surveying Part ⅠIllustrated Words and Concepts Figure 12-1 Elevations Determined by Transit and Leveling Rod Figure 12-2 A Plot Plan of Elevations and Location of a House Part Ⅱ Passages Passage A Construction Surveying Passage B The Survey of a Plot Plan

Unit 12 Construction Surveying Part Ⅰ Illustrated Words and Concepts Figure 12-1 Elevations Determined by Transit and Leveling Rod

Unit 12 Construction Surveying Part Ⅰ Illustrated Words and Concepts Figure 12-2 A Plot Plan of Elevations and Location of a House

Unit 12 Construction Surveying Part Ⅱ Passages Passage A Construction Surveying The construction industry is the largest in the United States and surveying is an essential part of that industry. A boundary survey and the preparation of the necessary topographic maps is the first step in the construction process. From these maps the positions of the structures are established and when the final plans for the project are available,

Unit 12 Construction Surveying Part Ⅱ Passages Passage A it is the duty of the surveyor to set the required horizontal and vertical positions for the structures. In other words, construction surveying involves the transfer of the dimensions on the drawing to the ground so that the work is done in its correct position. This type of surveying is sometimes called “setting lines and grades”. The work of the surveyor for construction projects is often referred to as layout work and the term “layout engineer” may be used in place of the term “surveyor”.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A Of necessity, construction surveying begins before actual construction and continues until the project is completed. Surveying is an essential part of the construction process and must be carried out in coordination with other operations in order to have an economical job and to prevent serious mistakes.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A The reader can readily understand the expense and inconvenience caused if one reinforced concrete footing for a building is placed in the wrong position. As another example, just imagine the problems involved if a few thousand feet of a sewer line are set on the wrong grade.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A Construction drawings show the sizes and positions of structures that are to be erected, such as buildings, bridges, roads, parking lots, storage tanks, pipelines, and so on. The job of the construction surveyor is to locate these planned features in their desired positions on the ground.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A He does this by placing reference marks ( such as construction stakes) sufficiently close to the planned work so as to permit the masons, carpenters, and other tradesmen to properly position the work with their own equipment (folding rules, mason’s levels, string lines, and so on).

Unit 12 Construction Surveying Part Ⅱ Passages Passage A he construction surveyor will find that his work is quite varied. One day he may be doing topographic work for a proposed building, while on another he may be setting stakes for pipeline excavation. It is often necessary for him to make measurements before and after some types of work, e. g., computing quantities of earthwork moved by a contractor. At other times, he will set stakes to guide the construction of foundations; he may be aligning the columns of a steel frame building, or checking a completed structure to see that it is correctly positioned, and so on.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A A construction project requires four kinds of surveys for its completion: (1) A property or boundary survey by a registered land surveyor to establish the location and dimensions of the property.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A (2) A survey to determine the existing conditions such as contours, man-made and natural features, streams, sewers, power lines, roads, nearby structures, and so on. This work may also be done by the land surveyor along with the boundary survey. (3) The construction surveys which determine the position and elevation of the features of the construction work. These surveys include the placing of grade stakes, alignment stakes and other layout control points.

Unit 12 Construction Surveying Part Ⅱ Passages Passage A (4) Finally there are the surveys which determine the positions of the finished structures.These are the “as-built” surveys and they are used to check the contractor’s work and show locations of structures and their components (water lines, sewers, etc.) which will be needed for future maintenance, changes, and new construction.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B The Survey of a Plot Plan The Survey Plat The basic information for the plot plan is found on a survey plat which is drawn by licensed surveyors. They obtain the legal descriptions of the piece of ground from the deed to the property which they receive from the owner.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Using surveying instruments and a tape or chain they locate a corner of the property in reference to a local datum which has been established by the town, city or village. This is usually a marker made of concrete and embedded in the ground, or it may be any other point which is designated by ordinance to serve the purpose.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B In a city, the marker may be placed on a street or a walk. It could even be a notch on the corner of a building. A surveyor’s plat is usually required by banks and other lending institutions before mortgages for building can be arranged.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B When a new subdivision is opened the surveyor may have to establish accurate direction lines, measure precise distances, and work out differences in elevation (level) from a datum point which is far away. After the surveyor locates a corner of the property or some central point, a stake is driven firmly in place or a concrete benchmark is set. This in turn becomes the point of reference for the location of streets and lots in the new community.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B When surveyors make a survey of a lot, the first thing they do is to establish a point of beginning which may be a mark on a walk or a corner stake. This point serves to help them locate the other corners of the piece of ground and also to relate elevations (levels) to the city requirements for that particular lot.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Surveyors show much other information on their plat besides the location of the lot corners. They also indicate the location of utilities, and water and sewer mains. Unless the lot is almost flat they show the contour of the lot by using a series of contour lines taken at a uniform interval of levels or grades. They show trees, walks, drive ways, and streets on their drawings. See the Unit Cover Figure.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Scales Used by the Surveyor Surveyors use a tape (graduated in metres and centimetres) or a chain (graduated in metres and decimetres) when making measurements. They make their drawings using a scale of 1200 or 1500 for plot plans (also referred to as site plans) and 11000 or 12000 for block plans or subdivisions.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Elevations The height of any point on the lot is called its elevation and is measured above or below some point of reference. (The use of the word elevation in this sense must not be confused with the elevation of a house which is a view of the outside of the structure.) In the Unit Cover Figure the elevation of the point of beginning is 8.900m.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B This means that the elevation of this corner of the lot is 1.100m below the benchmark (top of fire hydrant,in this case) which has an elevation of 10.000 m. Elevations are usually given in metres. The elevations of all other points on the lot are determined by using a transit and a levelling rod in reference to the benchmark. See Figure 12-1.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Contour Lines Contour lines are drawn on a surveyor’s plat or on an architect’s plot plan to show the slope of the ground. A contour line may be explained by thinking of the lowest contour line as the shore of a lake. If the water were to rise 0.5 m the shore line (contour line) would take on a new shape as the water covered more of the earth.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B Contour intervals are usually based on multiples of 100 mm (0.1 m), with small lots normally contoured in 500 mm (0.5 m) intervals. If the tracts are large or very hilly, contour lines may be at 1 m intervals. If the tracts are relatively level, intervals may be given at 300 mm (0.3 m) or less.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B The Plot Plan Architects use the information supplied by the surveyor’s plat in drawing the plot (site) plan. They draw the lot, accurately, using millimetres or metres. They indicate the north point, the lot and block number and the benchmark taken from a local city datum point. They also locate utilities, sewers, streets and public walks.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B They then locate the house, making sure that they have observed all of the area restrictions, front and side limitations, etc., established by local ordinances. They draw the contour lines showing the natural grade elevations. They then draw a second set of contour lines to show how the lot is to be sloped after the project is completed. These lines will determine the finished grade.

Unit 12 Construction Surveying Part Ⅱ Passages Passage B The finished grade elevations are shown in the small rectangles in Figure 122.The level of the benchmark given by the surveyor is designated, and the first floor is indicated so the excavator may know how deep to dig the hole for the foundation. In the plot plan, Figure 122, the architect established the first floor at 9.500 m in direct relation to the benchmark.