1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Module N° 7 – Introduction to SMS
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Houston ISD Board Workshop March 29, 2012 Performance Audit Report- Contract Recommendation Awards Process Presented by:
1 RIC 2009 Enforcement Discretion Policies in Fire Protection Doug Starkey Senior Enforcement Specialist Office of Enforcement March 12, 2009.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Cumulative Impacts James Slider November 7, 2013.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
1 Going From Good to Great: Cooperation, Collaboration, and Continual Learning Mark A. Satorius, Director Office of Federal and State Materials and Environmental.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
1 RIC 2009 Construction Inspection Program Loren R. Plisco Region II March 11, 2009.
New Reactor Construction Inspection
Enhancements to the NRC Allegation Program Technical Session: NRC/Industry Response to Security Inattentiveness Concerns Lisamarie L. Jarriel Agency Allegation.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
Safety Culture Activities for Materials Licensees, Decommissioning, and Uranium Recovery Josephine Piccone, Director Division of Intergovernmental Liaison.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
1 RIC 2009 NUCLEAR SECURITY Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
RIC 2009 Human Factors DAC/ITAAC Reviews Michael Junge USNRC/NRO/DCIP March 11, 2009.
Standard Design Process Overview
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
CM-101 Configuration Management Fundamentals
NRC’s Category 3 Source Security and Accountability Initiatives
Industry Guidance on Part 21 Evaluation and Reporting
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
Update on Category 3 Source Security and Accountability Initiatives
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
NRC Cyber Security Regulatory Overview
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Research and Test Reactor Safety: The Regulatory Perspective
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Decommissioning Rulemaking
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Anna Bradford, Deputy Director Division of New Reactor Licensing
RESOLUTION OF GENERIC SAFETY ISSUE 191
DOE Review of the LCLS Project October 2006
Presentation transcript:

1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009

2 Topics of Interest ITAAC Construction Problem Identification and Resolution Construction Assessment Program Engineering Design Verification Vendor Inspection Construction Experience

3 ITAAC ITAAC closure –DG 1204 (NEI 08-01) –SECYs , , –RIS ITAAC preservation –Maintenance or modifications to equipment or systems that impact closed ITAAC ITAAC notifications –Issues relating to closed ITAAC –Ultimate completion of ITAAC –Possible rulemaking or license conditions

4

5

6 Definition of Construction 10 CFR 50.10, License Required; Limited Work Authorization Final staff guidance ISG-4 issued February 18, 2009 –Provides guidance regarding delineation of pre-construction activities and those requiring NRC approval –Emphasizes the importance of ITAAC recognition

7 Construction Problem Identification and Resolution (PI&R) Lessons learned from NUREG 1055 PI&R inspections integral to NRCs overall inspection approach NRC assessment of PI&R effectiveness prior to issuance of NCVs Ensuring consistency throughout industry (licensee/EPC/vendors) via NEI 08-02

8 Construction Assessment Program Manual Chapter 2505 / SECY Commission guidance to reconsider elements and propose policy options –Significance Determination Process –Performance Indicators Ensure appropriate implementation of safety culture concepts Seeking continued stakeholder input

9 Engineering Design Verification Inspections Aim to verify accurate translation of requirements in certified designs into applicable design, procurement, and construction documents by Engineer- Procurement-Constructor entity Inspection Procedure (Draft) Pilot conducted in October 2008 Insights and future plans

10 Vendor Inspection Program SECY / Manual Chapter 2507 Key insights from inspections Workshop on Vendor Oversight for New Reactor Construction, December 2008 Continued focus and enhancement –International cooperation and MDEP VICWG –Oversight of offsite module fabrication –Pre-COL activities to support ITAAC

11 Construction Experience (ConE) Systematic review of international and domestic ConE Integrated with NRC OpE Program Development of NRO Office Instruction 86 events evaluated / INs , , / 4 Generic Communications in development International exchange of vendor and construction information Coordination with INPO

12