Special Construction.

Slides:



Advertisements
Similar presentations
Strong - Reliable - Affordable Currently these shelters can be Delivered and installed in 2 – 4 weeks Space Bar for Next Slide.
Advertisements

Construction Method, Material Selection & Building Services
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Lesson 9 Design & Construction of Food Premises & Equipment
Contents: Cover
And. WHY INFLATABLE SHELTERS? EFFICIENCY VERSATILITY SECURITY SAFETY DEPENDABILITY PORTABILITY DEPLOYABILITY.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
1 Utility Systems Process Systems – ‘Direct Impact Systems’ Contact the Product Contact Materials that will Ultimately Become Part of the Product Could.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Safety & Security Contractor Induction Property Management.
Franklin County Technical School Performance Contract Project.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Gas Transmission Pipelines
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Construction Methods and Materials Equipment Equipment.
Reinforced Concrete VS Steel
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
What is the autoclave thing again. Sanitization: fancy word for Cleaning Removing of foreign material Dirt, body fluids, lubricants Using detergents,
Commercial Project Heat Pump Pool Heater - Sun City Center.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
WE 640 Welding Production Plant Location. Arc Welding Processes Lesson Objectives When you finish this lesson you will understand: The importance of building.
Business Equipment Property Tax Relief Programs BETR / BETE Maine Revenue Services Property Tax Division August 2, 2007.
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
Sound.
Construction Specifications Foreman’s Development Series
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Section C Nonstructural Protective Measures
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Types of Buildings for Explosives Storage MA02 Slide 1.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Hot Work Permit Osan AB Fire Emergency Services.
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Hot Tub Covers: The Most Essential Hot Tub Accessory Hot tub covers plays an important role in maintaining well your hot tub and can truly be considered.
Day 1 Part 1 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
IT 244 Week 5 Assignment Physical Security Policy To purchase this material link 244-Week-5-Assignment-Physical-Security-
Best HVAC Training in Chennai
Using Shade and Shelter in Zoo Environments
Ryan Thurston | Duncan McLennan
Installation Procurement Package
Foundations of Technology Construction
Cryomodule test stand at ESS site
Environmental Assessment
Elmaco  Modular Spaces.
ROCKET TESTING TYPES OF TESTS
(Refer to Chapter 2 of the textbook)
Costing and Project Evaluation
Pre-Contract Cost Control
Carleton College Facilities Management
Foundations of Technology Construction
DBIA Manual of Practice
Recent Bond Accomplishments
DOE Review of the LCLS Project October 2006
Bunker Project Schedule/Budget
Presentation transcript:

Special Construction

Special Construction Some aspects of a building are complex and fall outside of the normal definitions of brick and mortar. Special Construction covers many of these important construction methods and details.

Special Construction Special Construction will need to be coordinated by the designer, contractor and owner to assure goals are met. Specific attention will need to be paid to: Installation Structural support Utilities Processes

Special Construction Installation Connectors or brackets to be installed in structure prior to installation of equipment? Sequence of installation requirement for access and staging? Delivery to site? Storage of equipment prior to installation?

Special Construction Structural support Foundation support of equipment load Lateral bracing of large equipment Structural isolation of equipment to reduce vibration or noise

Special Construction Utilities to operate equipment Electric Gas (natural or liquid propane) Water Waste Other (refer to equipment manufacturer’s literature)

Special Construction Processes Access for using equipment Access for maintenance and service Storage, access and removal of raw materials or finished products

Special Construction Designers, contractors and owners must work closely to select, design, specify, procure, install and maintain unique equipment and facilities. Building owners may play the primary role in selecting and procuring equipment, as the success of their business depends on the performance of the equipment.

Special Construction Businesses may come to designers and contractors with a prescribed list of functional requirements for their facility, which may lead to Special Construction.

Special Facility Components Security Protection Swimming Pools Fountains Waterfalls Aquariums Amusement Structures and Equipment Water Slides Wave Generators Tubs and Pools Whirlpools Ice Rinks Kennels and Animal Shelters

Special Facility Components Clean Rooms Hyperbaric Rooms Insulated Rooms Cold Storage Rooms Constant Temperature Rooms Sound Conditioned Rooms Office Shelters Planetariums Saunas Steam Baths Athletic Rooms Fabricated Rooms Vaults

Special Structures Fabric Structures Air Supported Fabric Structures Tensioned Fabric Structures Space Frames Geodesic Structures Fabricated Engineered Structures Glazed Structures Greenhouses Solariums Grandstands and Bleachers Metal Building Systems Portable and Mobile Buildings Observatories

Integrated Construction Building Modules Modular Mezzanines Ballistic Resistant Protection Ballistic Resistant Components Ballistic Resistant Rooms Ballistic Resistant Storefront Blast Resistant Components Sound, Vibration and Seismic Control Manufactured Sound and Vibration Control Components Radiation Protection Lead Lined Lath Radar Frequency Shielding