Dam Construction Alternatives Site Specific Matrix

Slides:



Advertisements
Similar presentations
Construction Below the Water Table
Advertisements

Cofferdam.
Construction Documents and Details
Url: www. shahbuilwell.com Phone: ,
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
By Victoria Howland and Scott Turgeon.  Major Qualifying Project  Stantec Project Center ◦ Center Director: Fred Hart ◦ Faculty Co-Advisor: Suzanne.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Kentucky River Lock and Dam No. 8 A Major Qualifying Project for Stantec Consulting Services Inc. Michael Kendall Karyn Sutter.
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3-Dimensional Views Existing spillway construction.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
Abstract The goal of this project was to develop a Renewable Energy Best Practices Manual for Stantec Consulting Ltd. The manual will be used by Stantec.
Sustainable Landscape Architecture Best Practices Manual Peter Cacciatore James Hogan Rebecca Mattern Angel Munoz March 4, 2010.
Project Scope Management
YALE UNIVERSITY SOCIAL SCIENCES BUILDING GPHB & ASSOCIATES Brad Otto, Client Liaison/Editor-in Chief Jake Wagle, Project Engineer Jimmy Murray, Project.
Education on RAC and Other CE Applications of Waste Tires Prepared for the CIWMB Meeting October 4, 2007.
Abstract We evaluated various construction methods including: Cast in Place Concrete, CMU, ICF, Precast Concrete, and Structural Steel for an Electrical.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Chief Operating Officer Greg Johnson. 7 Million Sheets of Paper.
ZAPDOR
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Academic Advising Day Group Pre-Advising Session (Junior Class) Prof. George Pins February 12, 2008.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Economic Analysis of Alternative Energy Sources Problem Statement Design for rural Iowa client Evaluate alternative energy sources - Wind - Solar - Petroleum.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Senior Design Laboratory Design Dec 05-01
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle Constructed Wetland Design at Sipaulovi Village.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Cost Estimate The cost of the conveyor system was broken down into multiple sub categories and adjusted for inflation over the conveyor’s lifetime. Expense.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 10 TOPIC : 3
UTILIZING LARGE SCALE ADDITIVE MANUFACTURING MACHINES WITH BIO-FRIENDLY MEDIUMS TO MORE EFFECTIVELY FABRICATE STRUCTURES Robert Goldshear & Edward Skorpinski.
Equipment Planning and Project Consulting Technology Management.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Graphical Detailing in Construction and the Built Environment
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Systems Development Life Cycle
Rapid Deployment Project Management Business Perspective
COFFERDAMS.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
S.T.B.S. College of Diploma Engineering
14th Crisp user meeting at UCL1 Some observations on the use of swap elements in staged construction Anthony Swain Professor of Transport Infrastructure.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
SELECTION CRITERIA FOR DAM CONSTRUCTION METHODS
Kings Bluff Raw Water System Parallel Raw Water Main Project
Architecture, Civil Engineer, and Interior Designer
Winchester Lift Station Odor Control Project
Infrastructure, Innovation and Standardization
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
B.V.Patel Institute of Technology-Diploma studies
Service reference ABU DHABI, United arab emirates IND 36 months
CT Reinforced Earth Structures
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 10 TOPIC : 3
Building Coordinators
ديبــــاجــــــة: صادق الكنيست الإسرائيلي في تاريخ على اقتراح قانون دائرة أراضي إسرائيل (تعديل رقم7) – 2009 الذي يشكّل، عمليًا، خطة إصلاح شاملة.
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle
Illinois Waterway 2020 Consolidated Closure
Project Scope Management
Presentation transcript:

Dam Construction Alternatives Site Specific Matrix Jason Butler 3/4/2011

Worcester Polytechnic Institute Civil & Environmental Engineering Major Qualifying Project (MQP) Stantec Project Center Project Advisors: Professor Frederick Hart Professor Suzanne Lepage Stantec Consulting Service Inc. mentors Daniel Gilbert Greg Yankey Brad Smiley

Project Scope Develop an understanding of dam construction alternatives: Concrete-Filled Cellular Sheet Pile Cells Float-In Roller Compacted Concrete Develop a user friendly site specific matrix for selection of appropriate dam construction alternative

Project Deliverables Overview of three dam construction alternatives Capstone Design Project Design a site specific dam construction matrix Calibrate matrix at previous dams built Apply matrix to future dam projects

Concrete-Filled Cellular Sheet Pile Cell Construction In-the-wet construction Permanent cofferdam structure Tremie concrete pour Cost and schedule saver Accommodates to irregular rocklines Suitable for volatile rivers

Float-In Construction In-the-wet construction Prefabrication of dam segments created at offsite location Casting basin or launch facility Large construction equipment Extensive underwater diver work

Roller Compacted Concrete Construction In-the-dry construction Temporary cofferdams Dewatering required Rapid placed concrete Construction completed in stages Optimize dams geometry

Matrix

Calibration of Matrix Kentucky River Lock and Dam No. 9 (Cell) Braddock Dam (Float-In) McAlpine Dam (RCC)

Application to Future Projects Kentucky River Lock and Dam No. 8 Currently under design process approval Matrix Results: Concrete-Filled Cellular Sheet Pile Cells

Application of Matrix Gain basic knowledge about dam construction Useful for clients to choose appropriate dam construction technique to use at specific location Entry-level engineers can use as a reference to get on board with the project quicker Serves as useful information on dam construction topics to allow clients and engineers to be on the same page

Questions?