Chattanooga CCTV Early Deployment

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
ITS Application of advanced sensor, computer, electronics, and communications technologies and management strategies in an integrated manner providing.
Clarus Initiative: Overview and Progress James Pol, PE, PMP USDOT ITS Joint Program Office MDSS Stakeholder Meeting #7 October 2005.
Alternative Project Delivery
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Los Angeles Interoperable Regional Communications System © Copyright 2015, LA-RICS Authority. All Rights Reserved. CPRA Update January 15, 2015.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Anaheim Regional Transportation Intermodal Center Project Update.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
PROGRESS REPORT JULY 2012 Published August 20, 2012.
Columbus Computerized Traffic Signal System Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department Where have we been? Where.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
 Agency must be an IBG intermediary contracted and appointed with at least one of the IBG companies.  Agency must link to the site by utilizing one of.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
CSUN Engineering Management Systems Engineering Management MSE607B Chapter 2, Part II The System Engineering Process.
Hospital Facility Managers Association of Delaware Valley.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
1.  Offshore Siting Process / Guidelines – Macro View  Offshore Siting Example – VA  Offshore Development Example – VA Virginia Offshore Wind Technology.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Overview Based on Indiana’s first A+B+C Contract. Why Warranty? What is in it for the Contractor? Lessons Learned?
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
“SIComP” Broward County Communications Upgrade Florida Department of Transportation District 4 November 21, 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
C2C COORDINATION LOCATION: FDOT DISTRICT 4 August 17, 2004 LOCATION: FDOT DISTRICT 4 August 17, 2004.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
I-75 Freeway Management System Financial Project Numbers: Contract No September 23, 2011.
Panther Media for Large Scale Development Network Architecture.
Cobb County Department of Transportation
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
Internet of Everything Prabhas Chongstitvatana Chulalongkorn University.
Work Zone Operational Enhancements Jennifer Livingston, P.E. ADOT – Senior Project Manager.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
FHWA Sponsored Webinar August 18, 2009 Denise Markow, PE TMC/ITS & Program Manager NH Department of Transportation Gail Hambleton IT Leader Transportation.
What is “Constructability”?
ADOT RCN DCR MAGTAG Update Meeting WELCOME. - Background - Stage I (Draft Initial DCR) - Stage II (Initial DCR) - Project Focus Area - Stage III (Final.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 27, 2009 I n.
Construction Oversight
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Pre-Construction Services
IA 122 RECONSTRUCTION PRE-BID MEETING
9/18/2018 Bids CONTRACTING Khamis…..
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Objectives To gain a basic understanding of the Web and Digital Communications Pathway. To discover career options available within the Web and Digital.
A Paradigm for Utility Coordination
Psychological Stages of Recovery
Presentation transcript:

Chattanooga CCTV Early Deployment Jim Floyd, Volkert & Associates Steve Meyer, P.E. Volkert & Associates Purpose: to examine necessary considerations during the process of constructing a CCTV system, and how TDOT solved problems along the way.

Hamilton County CCTV (There is one picture with numbers and one without, which do you want?)

Overview of Design Concept 63 Camera System First System in Tennessee to Utilize Ethernet Protocols to Each Field Device Field Hardened Routers Leased T1 Lines Dome Cameras Demarcation Points Layout of Temporary TMC

Design Concept 63 Camera System Ethernet Protocol Dome Cameras Ultimate system designed to include 148 cameras Included in Regional ITS Architecture. Chattanooga’s system is the first to use Ethernet protocols down to the camera. Allows for interoperability. Field hardened equipment, no HUTS.

Design Concept At each Demarcation Point Field-hardened routers Single and dual-camera demarcations Routers could be configured to serve 2 cameras Camera has 360 degree pan visibility and 184 degree tilt visibility, compare to GA Navigator at 160 degrees. Each camera is IP addressable. Reduction in number of Routers needed. Possibility of router to serve more than two cameras, only two currently proven to work. Demarcation point allows termination of camera inputs and outputs to interface with the power and communication utilities.

Design Concept BellSouth provides leased T1 lines TDOT Plans Future Fiber Backbone TDOT’s future fiber backbone will allow for a system which includes Dynamic Message Signs and Roadway Traffic Sensors, and Camera Video Surveillance (info taken from TDOT web site)

Design Concept Layout of Temporary TMC System Fully Equipped to Assist Incident Management System has all components to assist Incident Management. (?Keep in notes or in slide?)

Design Plans Contract Let, Bid Awarded for $3.8 Million Construction Began March 2006 Due to the complexity of the project, TDOT decided to select a firm to oversee construction, and selected Volkert and Associates Inc. to provide CE&I services.

Considerations in Construction Site Selection Factors View from Camera Constructability Utility Service Future Maintenance Field changes may impact ideals of design. Example: South side of Chickamauga Dam Consider the seasons when selecting a site, if the site is chosen in the winter when there is no foliage, keep in mind that when Spring comes around you will encounter increased vegetation. Utilities: limited power and communication service in remote areas. Advantage of using BellSouth. Maintenance example: Signal Mtn.

Considerations in Construction Coordination with Other Agencies City of Chattanooga TVA Avoid Conflicts Wherever Possible City: Electric permits and inspections TVA: Chickamauga Dam, Special provisions due to overhead power lines and archeological permit. Design avoided railroad conflicts.

Considerations in Construction Equipment Technological Advances Discontinued Equipment Flexibility in Pole and Camera Configuration Some equipment may be obsolete by the time the construction phase begins. Some equipment may be hard to obtain because it is so new: field hardened equipment practically coming right off of the assembly line. Pole and Camera Configuration: Visibility- take into consideration obstacles in the line of sight of the cameras.

Considerations in Construction Equipment (cont.) Compatibility of Communication Protocols Tech Involvement with Specified Equipment Communication and coordination with techs involved in use of final product/spec’d equipment. Bring them into planning AS EARLY AS POSSIBLE

Considerations in Construction Utility Coordination Schedules for Placement & activation Provisions for Future Costs/Financial Projections Current costs for communications alone are $20,000 per month. Electric costs are minimal. Each site has a meter.

Considerations in Construction Adjacent Project Impact Environmental EPSC QA/QC Stabilization of work site after poles and cameras have been installed, trenching.

Considerations in Construction TMC Coordination Architectural Coordination TMC Construction Contractor Coordination Design of TMC building was not included in scope of work for Prime Contractor, and was build by TDOT.

FINAL STAGES OF PROJECT Conditional Acceptance: End of September 6 month Burn In Period Camera images will be available to public through TDOT’s website www.tdot.state.tn.us/tdotsmartway

TDOT WEB PAGE

QUESTIONS?