Precast Bent System for Bridges in Seismic Regions

Slides:



Advertisements
Similar presentations
Ground failures: Vibration of soil Fault rupture Liquefaction Ground lurching Differential settlement Lateral spreading.
Advertisements

Concrete Structures Introduction to design methods in reinforced concrete Sustainable construction – is concrete “green”? Possibilities in concrete structure.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Connection Details for Prefabricated Bridge Elements and Systems
Seismology and Earthquake Engineering :Introduction Lecture 3
2013 Northcentral Region Construction Conference
Performance of buildings in the February 2011 Christchurch Earthquake Associate Prof Rajesh Dhakal University of Canterbury Christchurch, NZ Sixth International.
Experimental Testing of Drift- Sensitive Nonstructural Systems – Year 4 The Pathways Project San Jose State University Equip Site:
Concrete Fooring & Roofing System
Concrete Construction Part 1
8621 Georgia Avenue Silver Spring, MD
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
1 Class #25.1 Civil Engineering Materials – CIVE 2110 Definitions Material Properties Concrete Compressive Strength, f’ c Fall 2010 Dr. Gupta Dr. Pickett.
Structural System Overview
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
Portland Cement and Concrete
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
PBES Seismic Research at the University of Washington John Stanton, Marc Eberhard, Kyle Steuck, Jason Pang, Todd Janes, Olafur Haraldsson, Hung Viet Tran,
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Connection Details for Prefabricated Bridge Elements and Systems
UNBONDED PRE- STRESSED CONNECTIONS Prof. John F. Stanton University of Washington, Seattle, Washington, USA The ROSE School, Pavia. June 2009.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
 Project Delivery  Design Considerations  Lessons Learned.
Shake Table Testing of a Large Scale Two Span R-C Bridge Univ. of Washington *PI: Marc Eberhard Co-PI: Pedro Arduino Co-PI: Steven Kramer RA: Tyler Ranf.
POTENTIAL ISSUE TEAM STUDIES CONCRETE CODIFICATION OPPORTUNITIES 1. CONCRETE SHEAR WALLS Current Codes provide detailed provisions for the seismic design.
Final Report Terminal X McCarran International Airport.
Reinforced Concrete VS Steel
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
FRP Reinforcement of Concrete
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
Fiber-Reinforced Polymer (FRP)
WS Atkins Bridge Engineering Research Activities Mike Chubb.
Chapter 2b Foundations Shallow & Deep Foundations.
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
HFL Testing Briefing - WSDOT ABC Meeting University of Washington Marc O. Eberhard, John F. Stanton, Olafur S. Haraldsson, Todd Janes, Hung.
Reading Structural Drawings
Jennifer Soderstrom University of Washington
TOPICS COVERED Building Configuration Response of Concrete Buildings
1 HVACR116 – Trade Skills Structural Drawings. 2.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Chapter 43 Common Commercial Construction Materials.
IN MODULAR CONSTRUCTIONS
Structural Systems Design for a Laramie Office Building
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
CIVI 6061-Strengthening of bridges using FRP
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
Offsite manufactured Bridges
Sardar Patel Institute Of Technology
Posting Bridges for Specialized Single-Unit Trucks
Visit for more Learning Resources
Micro Pile to Concrete Connection
Prepared by John R. Henry, P.E. Senior Staff Engineer
ANALYSIS AND DESIGN OF FLAT SLAB
Residential Wall Systems
Arch205 Materials and building construction 1 foundation
Outline Introduction Structural Redesign Gravity System
Arch205 building construction foundation
Residential Wall Systems
TOLMAN HALL RETROFIT POSSIBILITIES
Concrete A structural material made by combining cement, sand, aggregate, and water.
Structural Stability and Strength
Masonry Bearing Walls.
Micro Pile to Concrete Connection
Presentation transcript:

Precast Bent System for Bridges in Seismic Regions Marc Eberhard, John Stanton Olafur Haraldsson, Todd Janes, Hung Viet Tran University of Washington NEES & PEER Annual Meeting San Francisco, 8 -9 October 2010

Acknowledgments WSDOT TRANSNOW Valle Foundation FHWA, Highways for Life Program PEER

Background Accelerate on-site bridge construction. Use precast concrete components. Connection details: seismic-resistant construct

Construction Procedure 1) Excavate footing.

Construction Procedure 2) Position and brace precast column.

Construction Procedure 3) Place footing reinforcement and cast.

Construction Procedure Set cap-beam, grout bars into ducts.

Construction Procedure 5) Place girders, diaphragms and deck.

Connections CIP RC (ref) Precast RC Precast Prestressed Cap-Beam to Column Column to Spread Footing Column to Drilled Shaft

Column-to-Cap-Beam Connection Thank you for your time. We’d like to thank Vince Chaijaroen, Wayne Brown, Amanda Jellin, Jon Padavorac, and the help in the structures lab. We’d especially like to thank WSDOT for their support and generous funding of this research effort. Questions???

Cap Beam Connection: Many small bars and ducts Courtesy: BERGER/ABAM Engineers Tight tolerances.

Cap-Beam Connection: Large bars Precast column Precast cap beam 6 # 18 rebar 8.5” corrugated steel ducts High strength grout The proposed precast bridge bent connection features: 12

Cap-Beam Connection: Conclusions Failure occurs in the column. Large-bar precast connection behaves the same as a cast-in-place connection. All 4 specimens were subjected to the same lateral displacement history. The tests revealed all 4 specimens to have the same hysteretic performance, despite debonding of the bars or having distributed reinforcement. Specimen REF did exhibit a delay of bar fracture, but loss of lateral capacity was similar. 13

Column-to-Footing Connection Thank you for your time. We’d like to thank Vince Chaijaroen, Wayne Brown, Amanda Jellin, Jon Padavorac, and the help in the structures lab. We’d especially like to thank WSDOT for their support and generous funding of this research effort. Questions???

Footing Connection: Construction Headed bars

Footing Connection: Headed Bars Strut and Tie Model.

Footing Connection Hooked bars facing out (Conventional cip) Load transfer is tangential to hook. Ineffective!

Footing Connection: Construction

Spread Footing Connection Vertical (gravity) load. Lateral (seismic) load.

Spread Footing Connection: Test After seismic testing. Foundation undamaged.

Spread Footing Connection – Gravity Load Test Column crushed at: 3.5 * (1.25DL + 1.75LL). No damage to footing. No sign of punching failure.

Spread Footing Connection Constructability: Column has no projecting bars. No “form-savers”. Easy to fabricate and transport. From constructability point of view we have good connection. No bars going between precast column and cast in place footing. We are able to produce linear element that is easy to transport. If we look at the seismic performance. Using terminators we get better anchorage than hooked bars facing outwards. Today's code require fair amount stirrups to prevent shear failure. AASHTO also implies the need for shear friction steel. But the biggest question is can we reduce it or eliminate them to make the construction easier and faster.

Spread Footing Connection Structural Performance: Terminators provide better anchorage than hooked bars facing outwards. Failure in column. Footing undamaged in lateral load and vertical load tests. Seismic performance as good as, or better than, conventional c.i.p. construction. From constructability point of view we have good connection. No bars going between precast column and cast in place footing. We are able to produce linear element that is easy to transport. If we look at the seismic performance. Using terminators we get better anchorage than hooked bars facing outwards. Today's code require fair amount stirrups to prevent shear failure. AASHTO also implies the need for shear friction steel. But the biggest question is can we reduce it or eliminate them to make the construction easier and faster.

Implementation Bid Opening: October 14th

Pre-Tensioned System Thank you for your time. We’d like to thank Vince Chaijaroen, Wayne Brown, Amanda Jellin, Jon Padavorac, and the help in the structures lab. We’d especially like to thank WSDOT for their support and generous funding of this research effort. Questions???

Pre-Tensioned System PC cap-beam Sleeved strand Bonded rebar Cracking plane Bonded strand c.i.p. footing

Pre-Tensioned System Pre-tensioning solves corrosion problems perceived to exist in post-tensioning. Pre-tension in a plant. Good QC. Special equipment and extra site time for post-tensioning are not needed. Can add rebars for energy dissipation.

Thank You Thank you for your time. We’d like to thank Vince Chaijaroen, Wayne Brown, Amanda Jellin, Jon Padavorac, and the help in the structures lab. We’d especially like to thank WSDOT for their support and generous funding of this research effort. Questions???