Markus Wernli, PhD, P.E. BergerABAM Inc. 1301 Fifth Avenue, Suite 1200

Slides:



Advertisements
Similar presentations
Precast Bent System for Bridges in Seismic Regions
Advertisements

Marine Dock Facilities William F. Goldston, P.E. President – Goldston Engineering, Inc. October 17 th, 2007 William F. Goldston, P.E. President – Goldston.
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
By Lt. Cmdr. John Woods & Colton Oceanography. What inspired Lieut. Cmdr. Woods career? Lieut. Cmdr. Woods career was stared in New Jersey. He grew up.
Antoine Lecroart Alcatel-Lucent
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
Waterfront Recreation (photo of big boat going by) Module 6:1.
“Energy from the Sea – BioFuels, Currents, Tides & Wind” Panel Contribution by Dr Tony Raven Director, Research & Innovation Services University of Southampton.
NNMREC National Marine Renewable Energy Centers Hawaii National Marine Renewable Energy Center (HINMREC) University of Hawaii Wave, OTEC Southeast National.
OCEN 201 Introduction to Ocean & Coastal Engineering Coastal Processes & Structures Jun Zhang

CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
4903 Morena Blvd., Suite 1213 San Diego, California Voice: or Fax: Don Innis, President;
NNMREC Summary for Congressman Dave Reichart April 22, 2011 Northwest National Marine Renewable Energy Center University of Washington
Chapter I. Introduction. Naval Architecture: the science and engineering of designing ships and other kinds of waterborne crafts. Kinds of ships Sub systems.
Unit 4: Primary Resources Energy from the Oceans.
Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.
EVALUATION OF LIQUEFIED NATURAL GAS RECEIVING TERMINALS FOR SOUTHERN CALIFORNIA April Chan Jana Hartline Rob Hurley Leanna Struzziery Faculty Advisors:
Liquid Natural Gas (LNG) Facilities. LNG: What is it? Natural gas converted to liquid at -260 F Natural gas converted to liquid at -260 F 1/600 of original.
A Career in Civil Engineering Presented By: Georgia Section of American Society of Civil Engineers (ASCE)
Solutions for Flaring & Venting CNG Marine Transportation
Opportunities to Innovate in Aquaculture with Composite Materials Presentation at 1 st Annual Maine Aquaculture R&D Forum January 14, 2015 Stephen Von.
About Us We are a natural gas EPC company specializing in a wide variety of aspects of natural gas installations Providing full service package.
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
NAVAL FACILITIES ENGINEERING COMMAND 13 July 2015.
Applications and Challenges for Very Large Floating Structures (VLFSs) Markus Wernli, PhD, P.E. BergerABAM Inc Fifth Avenue, Suite 1200 Seattle,
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES,
Power Plant Construction and QA/QC Section 1.3– Oil and Natural Gas Engineering Technology Division.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Chilmark Menemsha Harbor Phase 3. Menemsha Boathouse Fire July 2010.
“What would happen if we ran out of Crude Oil?” By: Cynthia Santillanez(:
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Washington Built Green Homes Measure Update May 13th,
Economics and Forecasting Let the Dice Fly High March 11, 2015.
The Deepwater Horizon Explosion and Oil Spill The Deepwater Horizon was a drilling rig owned by Transocean, Inc. British Petroleum (BP) leased this rig.
WWC CONSTRUCTION MEREDITH AVENUE & SPENCER STREET RICHARD MARTUCCI OWNER BUILDERS & DEVELOPERS CIRCLE MEMBER A Marquee Green Zone Property
New Orleans:City at Risk
Dr. Jimmy E. Fowler Dr. Jimmy E. Fowler Coastal and Hydraulics Laboratory Army Engineer Research and Development Center (601)
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Offshore Wind Energy in the region – EMDEN (Germany)
Nonrenewable Energy FOSSIL FUELS: OIL, NATURAL GAS & COAL.
Approximate House Floor Plan - Not Completely to Scale Located at: th Avenue NE, Seattle, WA View of Lake Washington.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
PORT OF TACOMA. Request authorization to expand the scope and increase the authorized amount of Contract No , for work associated with the WUT.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Transferred from the State of California to the City and County of San Francisco in 1968 via Burton Act AB miles of waterfront from Hyde Street.
The Chesapeake Bay Estuary
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
HYUNDAI HEAVY INDUSTRY
Marine Technologies Overview
INSTRUCTOR © 2017, John R. Fanchi
Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer
Fire Fire drill.
The Deepwater Horizon Explosion and Oil Spill
Harbors and Ports Engineering Geology – CE31FB2.
NYC landmarks quiz.
Prepared for - tusharhsonawane.wordpress.com
Innovation, Study & Application
MARINE CONSTRUCTION & EQUIPMENT
Breaches.
Engineers - Turning ideas into reality!
Fire Commission May 22, 2019.
INTRODUCTION TO PORT DESIGN
Presentation transcript:

Design and Construction Considerations for Very Large Floating Structures (VLFSs) Markus Wernli, PhD, P.E. BergerABAM Inc. 1301 Fifth Avenue, Suite 1200 Seattle, WA 98101-2677 (206)357-5600 wernli@abam.com www.abam.com

Floating Piers, Bridges, Wharfs, and Breakwaters Floating Navy Pier Hood Canal Floating Bridge, Washington Floating Container Terminal, Valdez, Alaska

Floating Offshore Drilling Platforms, FPSOs, and Ocean Energy Convertors Glomar Beaufort Sea Concrete Island Drilling Structure (SIDS) Floating LNG Processing and Storage Platform (Courtesy Mustang Engineering) Arco Floating LPG Terminal, Java Sea

Floating Offshore Ports, Bases, and Stabilized Live Fire Platforms Floating Open Ocean Stabilized Live Fire Platform (Courtesy PCCI)

Design and Construction Considerations for VLFSs Modular Design Standard Modules Specialized Modules Modular Construction

Design and Construction Considerations for VLFSs Construction Location: Construction Onshore at Waterfront/Drydock Construction Afloat at Outfitting Dock Construction Afloat in Protected Deep Water Site Construction Offshore at Deployment Site

Cost per Square Foot Area New York City Land Prices VLFSs Cost Factors Design Sea State Platform Size Payload/Freeboard Source: Federal Reserve Bank of New York, based on an analysis of CoStar Group data, April 2008.

Thank you! Markus Wernli, PhD, P.E. BergerABAM Inc. 1301 Fifth Avenue, Suite 1200 Seattle, WA 98101-2677 (206)357-5600 wernli@abam.com www.abam.com