SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

ODOT Structure Project Manager Training
Mansoura University. Faculty Of Engineering. Civil Eng . Dept.
Introduction to composite construction of buildings
Chapter-2 Parts of Steel Bridge.
Actions and Retrofit of Post Earthquake-Damaged Bridges
TED 316 – Structural Design
Concrete Fooring & Roofing System
Bridges.
Concrete Construction Part 1
Chp12- Footings.
Bridge Engineering (6) Superstructure – Concrete Bridges
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
TEQIP-II Institutions
ENG-1010 Lecture 16 Bridge Design.
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
Chapter 34 Bridge Construction.
POWERPOINT PRESENTATION
Bridges unit 101.
Totally Precast Concrete Bridges
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
 Project Delivery  Design Considerations  Lessons Learned.
Trestle Rebuilds The Continuing Quest to Fill the Gap
Chapter 19 Floors.
Basic Civil Engineering-Foundation
Construction Innovation: The Millau Viaduct Deck Launch Paul Eliasson Brian Follweiler.
Chapter 18 Foundations.
Foundation Engineering CE 483
The Structure Behind Bridges
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
By George C. Lee University at Buffalo
INSPECTION OF PRESTRESSED CONCRETE ROAD BRIDGES BY ULTRASOUND 3D TOMOGRAPHER SYSTEM Eng. Guy Rapaport Infrastructure & Transport, Finland.
Bridge Engineering (9-1) Suspension Bridges I. *Components: Anchorage (blocks or tunnel type), towers, main cables, hangers, stiffened (box) girder and.
1 9 th Oct Design and Construction of Main & Crescent Bridges.
BANDRA-WORLI SEA LINK BY : PRAJAPATI NIHAR V..
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
DIFFERENT TYPE OF BRIDGES
WELCOME ALL FACULTY MEMBERS & ALL PARTICIPANTS OF
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Green Concrete 1 1.
Condition of Prestressing of the Ft. Lauderdale- Hollywood Airport Deconstructed Segmental Bridges Luis M. Vargas Beiswenger Hoch and Associates.
STRESS RIBBON BRIDGE   1 1.
Selection Criteria For Short-Span Bridges Construction Methods
Bridges and Loads Modified by Matthew Silbernagel.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
Construction Methodology for Suramadu Main Bridge.
All kinds of cranes have the advantage. Longfellow Bridge: “Salt and Pepper” Towers Work More than 100 years after the last stone was set on the “salt.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Totally Precast Concrete Bridges
Seminar On Green Concrete Submitted To: Submitted By:
Introduction to composite construction of buildings
Offsite manufactured Bridges
Engineering Terms Bridge Unit.
Introduction to Bridge INspection
Visit for more Learning Resources
Danube Bridge Vidin – Calafat
New Bridge Construction
A New Precast, Pre-stressed Bridge Deck System
Suspension Bridge Seminar On Submitted To: Submitted By:
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Materials and building construction 1 foundation
CONSTRUCTION METHODS & TECHNOLOGY
Arch205 building construction foundation
Arch205 building construction floor & Roof systems
Totally Precast Concrete Bridges
BUILDING CONSTRUCTION Foundation
Presentation transcript:

SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE Guided by: Submitted by: Dr. M.K SHRIMALI Gaurav Jhalani Dr. S.D. BHARTI 2010PST111 Structural Engineering M.Tech III Department MNIT, Jaipur Semester

Contents: Components of a Bridge Construction methods for bridges Introduction of Bridge Components of a Bridge Construction methods for bridges Introduction of Segmental bridge construction Classification of segmental bridges Construction of segmental bridges A Case Study of Sutong Bridge china Some other examples of segmental bridges Conclusion. References

BRIDGE A bridge is a structure built to across a obstacles such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. Designs of bridges depending on the function of the bridge, length of the bridge, span of the bridge, the nature of the terrain, and the material used to make it.

Components of a bridge Superstructure or Bridge deck – the horizontal part of a bridge that support pedestrian or traffic activities. Bearings - transmit the load received from the decking on to the substructure. Substructure – Piers or Abutments- Vertical member support the deck or bearing. Foundation – Transmits the load of Superstructure, Piers or Abutments evenly distribute the load on to the strata

Construction Methods for Bridge 1. Cast-in-Situ Method : This Method Prefer for Short Bridges. Time consuming is large in cast-in-situ construction as it involves following steps. Erection on ground supported staging Casting of concrete Dismantling of staging

2. Precast Segmental Method: This method is used for the long bridges. It is economical when there is large no of span. This method involves the following steps. Casting of Precast segments in casting yard. Transporting the precast segments at the site. Erection of the precast segment using launcher or crane. External Prestressing. Grouting.

SEGMENTAL BRIDGE CONSTRUCION A Segmental Bridge is a bridge built in short sections (called segments), that is one piece at a time. And then segments are erected to make the bridge. The bridge is either cast-in-place or precast. Advantage of segmental bridge construction Very economical for long spans. Prefabricated segments provides more quality control.

Contd. The structure can be fully loaded immediately after being prestressed. The pre-stressed cables can be inspected and replaced at all times. Low weight due to thin bridge sections. Industrialization of the construction process. Innovations in construction equipment. Low maintenance costs. Speed of construction, time taken less

Disadvantage of Segmental bridge construction High construction loading or high technology is used. Need high safety precautions during construction Extra cost (due to more prestressing required) History of Segmental bridge construction Segmental bridge construction first appeared in the early 1950s. The first cast-in-place segmental concrete bridge, built in 1950, across the Lahn River in Germany. The first precast segmental concrete bridge, built in 1962, across the Seine River in France.

Classification of segmental bridges Segmental bridges is classified under the following Categories. Balance Cantilever Bridges Progressive Placement Bridges Span-by-Span Constructed Bridges Incrementally Launched Bridges

Segmental Construction Method Balanced Cantilever

Segmental Construction Method Progressive placement

Segmental Construction Method Span-by-span

Segmental Construction Method Incrementally launched

Construction of Segmental Bridges The following steps are used for the construction of Segmental bridges. Casting of Segments Two method used for casting of segments Short Line Method In this rate of segment production is slow. Three or four segments cast at a time. Long Line Method In this rate of segment production is fast. Segments equal to one span cast at a time.

Construction of Segmental Bridges Contd. After casting the segments are stored at staking yard and curing of segments will be done. Transfer the segment at erection site: After casting or curing of segments are transferred at erection site with the help of traveler or crane.

Casting of Segments

Casting of Segments

Storage of Segments

Typical Features of Precast Segments

Lifting of Segments

Lifting of Segments

Construction of Segmental Bridges Contd. 3. Erection of the segments: The precast segments are erected on the sites by following erection methods. Balanced Cantilever erection Progressive Placement erection Span by Span erection Incremental Launching erection

Construction of Segmental Bridges Contd. High Machineries are used for the erection of segments some of the following. Launching Truss & accessories Launching girder & accessories Gantry crane or other cranes Hydraulic jacks Travelers

Erection of Segments

Erection of Segments

Erection of Segments

Erection of Segments

Progressive placement erection Erection of Segments Progressive placement erection

Incremental launching erection Erection of Segments Incremental launching erection

Construction of Segmental Bridges Contd. 4. Epoxy Glueing In between the two segments epoxy Glueing is used to prevent the leakage of grout during grouting. 5. External perstressing Used for giving the final strength to bridge. Pre-tension method post tension method

Construction of Segmental Bridges Contd. 6. Grouting The main purpose of grouting is to protect the all strands against corrosion and develop the bond between prestressing steel and surrounding concrete.

Segmental bridges-A Case Study of Sutong Bridge china Project Description 1.1 Location across the Yangtze River China

Segmental bridges-A Case Study of Sutong Bridge china 1.2 Sutong Bridge is the first precast segmental bridge built using short-line match-casting method in China. 1.3 It was constructed using balanced cantilever method. Prestressed concrete continuous single-cell box girder structure was constructed precast segmental method. The construction of the precast segmental approach structures commenced in April 2004 and completed in early 2007.

Segmental bridges-A Case Study of Sutong Bridge china 1.4 It consist of 30m, 50m or 75m long span. The total length of the box girder measured along its centerline was approximate 3.7km. 1.5 The reinforced concrete columns with 4.5m x 6.5m rectangular hollow section were adopted for the maximum height of 60m and supported on pile caps with bored pile foundation.

Segmental bridges-A Case Study of Sutong Bridge china 2. Segment Casting: Segment were casted in casting yard The casting yard was about 40,000m2 and equipped with 2 numbers of 160 ton gantry cranes for segment handling and 2 numbers of 16 ton gantry cranes for light duty tasks, such as, manipulating the reinforcement cage. The casting yard had a storage capacity of 354 segments based on two-layer stacking.

Segmental bridges-A Case Study of Sutong Bridge china Casting yard Layout Plan

Segmental bridges-A Case Study of Sutong Bridge china 3. Segment Erection: The total erection period was about 15 months. Two overhead launching girders were used. Each girder had two winches with lifting capacities of 180 ton and 150 ton respectively. The lifting height of the winches was allowed for 70m.

Segmental bridges-A Case Study of Sutong Bridge china Launching girder assembling Partially Erected Bridges

Other Examples of Segmental bridges

Other Examples of Segmental bridges

Other Examples of Segmental bridges

Other Examples of Segmental bridges

Conclusions: This method is ideal for bridge construction bridge give Aesthetical view or good quality. Longer span bridge now possible. Longer bridge over water now possible. Construction of long bridges now easy. Construction time is less. Environment friendly construction. Construction line is highly mechanized by this method.

References: Segmental Concrete Bridge Construction - NBM Media www.nbmcw.com Bridge construction method www.ttfijnmechanica.nl Segmental bridge technology Rohleder_presentation mceer.buffalo.edu/education/bridge.../ Seminar on Segmental Construction www.faeto.org/pdf/segmental_bridge_construction.pdf Construction of the Precast Segmental Approach Structures for Sutong Bridge a paper by Xian Peng LIU, Zong Ping QIN, Y.W. LEUNG, YWL and Dr. Lingling YUE, www.ywlgroup.com/a02.pdf

THANKS