Cleco Transmission Planning Summit 2013

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Sierra Subregional Planning Group 10-year Transmission Plan
The Midwest ISO from a Transmission Owner Perspective.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2012
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
OPERATING IN THE EAGLE FORD SHALE
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Freeport Area Master Plan Project -
Local Area Planning Update to TRANSAC – September 15, 2016
RMR Exit for Spencer 5 – Remedial Action Plans
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Local Area Planning Update to TRANSAC – September 26, 2018
Transmission Planning Summit 2009
Acadiana Load Pocket Project
Strategic Plan and Economic Upgrade Process
Presentation transcript:

Cleco Transmission Planning Summit 2013 Coughlin Transmission Operations Center May 9, 2013 10:00 – 11:00am

Introduction Welcome Terry Whitmore, Mgr- Trans Strategy & Support James Simms, Lead Engineer- Transmission Strategy Chris Thibodeaux, Lead Engineer- Transmission Strategy Linh Tran, Associate Engineer- Transmission Strategy Cindy Guillot, Director Trans Policy and Contracts A brief introduction of the meeting participants is made here.

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda.

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 4

Economic Planning Studies None were requested for 2013

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 6

Acadiana Load Pocket This slide shows the location of the Acadiana Load Pocket as defined by the concerned members. Roughly Extends south of I-10 limited by the Atchafalaya Basin to the east, Greenwood substation to the south (near Houma), And Richard, Jennings, Meaux substations to the west. 7

Acadiana Load Pocket Project Year 2013 Progress Report Cleco Upgrades New 230 kV transmission line from Wells to Labbe (Complete) Add a Second 500/230 kV Transformer at Wells (Complete) Reconductor Segura – Hopkins 138KV transmission line (Complete) Entergy Upgrades New 230 kV transmission line from Sellers Rd to Labbe (Complete) Lafayette Upgrades New 230 kV transmission line from Labbe to Bonin (Complete) 2nd 230/138 kV Autotransformer at Bonin (Complete) Segura’s completion date hinges on the delivery of the 230/138KV autotransformer. Although the line is expected to be finished on time, the auto’s delivery and installation may delay its full commissioning.

Acadia PB2 Purchase Affected System Upgrades Cleco Upgrades New 230/138 kV Autotransformer at Rork (Complete) Reconductor Acadia to Richard Ckt 2 (Complete) Redirect Line 1 to connect to the Rork 230/138 kV autotransformer (Complete) Entergy Upgrades Reconductor Acadia to Richard Ckt 3 and 4 (Complete) Reconductor Hopkins to Moril 138 kV line (Complete) Tap the existing Scanlin to Scott 138 kV line and add a new substation Bosco with a 5 ohm Reactor at Bosco (Complete) Build a new 138 kV line from Bosco to Bloomfield (Tapped between East Opelousas and Vatican)(Complete) Change Normally Open breakers at Richard and Scott(Complete) Segura’s completion date hinges on the delivery of the 230/138KV autotransformer. Although the line is expected to be finished on time, the auto’s delivery and installation may delay its full commissioning.

ALP Project & Affected System Upgrades Complete

Acadiana Load Pocket Update Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 12

Cleco 2013 Transmission Construction Plan

2013 Transmission Construction Plan

Cleco 2013 Transmission Construction Plan Budgeted Projects 2nd Cocodrie Autotransformer Cooper Capacitor Banks Strung Bus replacement at Plaisance Many Capacitor Banks 2013 2014 2nd Pineville Autotransformer

2013 Transmission Construction Plan 2nd Cocodrie 230/138 kV Autotransformer

2013 Transmission Construction Plan Project: Second 230/138KV Autotransformer at Cocodrie Substation In-service Date: April 2013 Transmission Project Justification: This project relieves the potential overload on the existing Cocodrie Autotransformer FTLO Cocodrie to Ville Platte 230 kV line. This project also eliminates the contingency of the existing Auto-transformer causing overloads on Coughlin to Shady Oaks 138 kV line.

2013 Transmission Construction Plan Cooper Capacitor Banks

2013 Transmission Construction Plan Project: Cooper capacitor 2- 36 MVAR bank addition In-service Date: March 2013 Transmission Project Justification: This project was approved to allow for maintenance on the Cooper to Leesville and Cooper to Derrider double circuit 138 kV lines and improve the voltage in the Leesville/ Derrider areas. Operationally there is no way to get an outage on these lines with out risking low voltage for the loss of the Cooper to Penton 230 kV line.

2013 Transmission Construction Plan Many Capacitor Bank

2013 Transmission Construction Plan Project: Many capacitor 23.4 MVAR bank addition In-service Date: June 2013 Transmission Project Justification: This project was approved to mitigate potential low voltages seen in the powerflow models during summer peak conditions at Many 138 kV Substation for the loss of the Many to Fisher 138 kV line.

2013 Transmission Construction Plan Coughlin to Plaisance 138 kV line Rating upgrade

2013 Transmission Construction Plan Project: Transmission element replacements on Plaisance – Coughlin 138KV transmission line (Replace Strung bus at Plaisance) In-service Date: March 2013 Transmission Project Justification: This project increases the Plaisance to Coughlin 138 kV line rating to prevent overloads FTLO Cocodrie to Ville Platte 230 kV line. Increase the rating to 360 MVA

2013 Transmission Construction Plan Pineville 230/138 kV Auto #2

2013 Transmission Construction Plan Project: Pineville 230/138 kV Auto #2 In-service Date: June 2014 Transmission Project Justification: This project prevents pre-contingent load shed as a result of a extended outage of either the Pineville or Twin Bridges 230/138 kV Autotransformers. Operationally with one of these transformers out of service loss of the other autotransformer would lead to low voltage in the Pineville/Alexandria areas and thermal overloads on lines in that region.

2013 Transmission Construction Plan Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 27

Model Review Remove zero Impedance ties Valley Load Change Demco Transaction Removed the Wells Reactor Messick 500 kV Tap

Model Review Removed Zero Impedance Ties Valley Load Change SPP wants to remove the zero impedance ties from the Powerflow models. Changed the way we model load connected to external systems which traditionally modeled with a Cleco load on a Cleco bus. Now the load ID is Cleco however it is connected to an external bus Valley Load Change Changed the Valley load to be AEP load instead of Cleco load. Set up a transaction in the powerflow models for the remainder of the time Cleco is serving the load.

Model Review Demco Transaction Removed Wells Reactor Set up a transaction from Cleco to Lagn to serve the Demco load starting in 2014. Removed Wells Reactor With the completion of the ALP project and the addition of the second Wells 500/230 kV Autotransformer the Wells reactor was no longer needed to restrict flow into the ALP. Cleco went through the approval processes within SPP to remove the Wells SPS and removed the reactor from the models. Reactors remain at wells however are not connected.

Model Review Messick 500 kV Tap The final SPP models have the Mount Olive to Hartsburg 500 kV line tapped near Messick substation in the 2019 and 2024 models. However the models do not include a 500/230 kV Auto. This project is currently being jointly studied by AEP, Cleco, Entergy, SPP and MISO? No firm commitment to build has been established at this point.

Model Review

Model Review Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 34

2013 SPP Model ACCC Results SPP 2013 Models 2013 (Spring, Summer Shoulder, Summer, Fall, Winter) 2014(Spring, Low load, Summer Shoulder, Summer, Fall, Winter) 2015 (Spring, Summer, Winter) 2019 (Low load, Summer, Winter) 2024 (Summer, Winter)

2013 SPP Model ACCC Results International Paper to Mansfield 138kV transmission line thermal overload Powerflow models: 2013, 2014 and 2015 Summer and 2014 Winter peak models Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.

2013 SPP Model ACCC Results International Paper to Wallace Lake 138kV transmission tie line thermal overload Powerflow models: 2013, 2014 and 2015 Summer peak models Contingency: Dolet Hills to S.W.Shreveport 345 kV transmission tie line Resolution: The Dolet Hills Operating Guide addresses this outage and resulting overload. The Dolet Hills Plant would be reduced to a level such that the flow on the IP to Mansfield 138 kV transmission line is within limits.

2013 SPP Model ACCC Results IP Mansfield to Wallace Lake 138 kV line 110% Mansfield to IP Mansfield 138 kV line 105% Contingent Element: Dolet Hills to S.W. Shreveport 345 kV line Mitigation: Implement the Dolet Hills operating guide

2013 SPP Model ACCC Results Champagne to Plaisance 138 kV transmission line thermal overload Powerflow models: 2014 (Fall, Spring, Summer, Summer Shoulder, Winter), 2015 Winter, 2019 Winter, 2024 (Summer and Winter) models Contingency: Cocodrie to Ville Platte 230 kV transmission line Resolution: The terminal equipment at Champagne was upgraded to 287 MVA which eliminates this overload condition.

2013 SPP Model ACCC Results Champagne to Plaisance 138 kV line 121% (231 MVA) Contingent Element: Cocodrie to Ville Platte 230 kV line Mitigation: Line rating already upgraded to 287 MVA

2013 SPP Model ACCC Results Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 42

MISO Discussion June 1st MISO becomes Cleco’s RC. Cleco begins participating in MTEP 14 June 1st Cleco has filed with FERC for Order 1000 Regional requirements under MISO tariff.  Ferc has approved this filing.              

MISO Discussion Cleco plans to file with FERC to meet Order 1000 Inter-regional planning under MISO. Cleco will administer its tariff until Dec 19, 2012  including:               -  Transmission Service Request               - Generator Interconnection Queue (Small & Large)

MISO Discussion Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2012 Transmission Construction Plan Model Review 2012 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 46

Stakeholder Business Chance for Stakeholders to bring issues up for discussion

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2013 Transmission Construction Plan Model Review 2013 SPP Model ACCC Results MISO Discussion Stakeholder Business Final Questions Adjourn Go over the meeting agenda. 48

Final Questions?

2013 Cleco Transmission Planning Summit Oasis http://www.oatioasis.com/clec/index.html Trueshare http://www.trueshare.com/ Contact info: Cindy Guillot Director of Transmission Policy & Contracts 318 838 3166 cindy.guillot@cleco.com