SR 0222-027 Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Moline Bridge Closure Unclassified ZDec09 US Army Garrison – Rock Island Arsenal Moline Bridge Closure.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Titusville to Edgewater Bike Loop PD&E Study
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
Current Construction Projects Major Projects Pinellas County.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Fang Yuan, PhD. PE. SEPTEMBER PAPAL VISIT July 1, 2015 Potential Traffic Impacts.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Mike Wendt & Cara Abts WisDOT Regional Traffic March 10, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
Maintenance and Temporary Traffic Control
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
MD 30 (Hanover Pike) at Mt. Gilead Road
Closure of S. Lazona Dr. at Main St.
Project Headlands, Phases 1 and 2
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Center City Connector 101.
DICKINSON AVENUE RECONSTRUCTION
Work Zone Safety Review – District 1 - Duluth
Clinton Street Bridge over the Maumee River
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Harbour Island Force Main Replacement
Commissioners Presentation
Metropolitan District | mndot.gov
Utility Relocation: 11th/Mill
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does not account for possible utility relocation delays or unforeseen field conditions. Closures shown do not reflect the actual durations which will be limited to the shortest time possible.

Stage 1 Construction Activities: March, 2013 – May, 2013: – No Road Closures or Detours. If temporary lane restrictions are needed they can only occur between the hours of 9 PM and 6 AM. – Work Begins on the New Bridge and Alignment. This work will occur outside current traffic patterns. – Work Starts on Widening Duke and Liberty Streets. Traffic will be maintained on both streets during construction. – Temporary Signals will be installed at: Duke and Liberty Sts. Lititz Ave and Liberty St. Lititz Pike and Marshall Ave.

Stage 1 Construction: New Bridge/N. Duke St. Work Areas

Stage 2 Construction Activities: May, 2013 – May, 2014: – Close McGovern Ave from Lititz Ave to Queen St. This will also include closure of the Eastern entrance/exit to the Lancaster Train Station. – Close Christian St access to McGovern Ave. Christian St will remain open ( 2 ways) from Liberty St to the businesses below McGovern Ave. – Implement Keller Ave detour. Keller Ave. closure duration will be for the shortest time possible. – Implement 222 SB detour via Liberty St. – Implement detour to/from AMTRAK station to/from US 222 North and US 222 South.

Stage 2 Construction Area: McGovern, Duke and Christian Impacts

Stage 2 Construction Detour: 222 SB Detour via Liberty St McGovern Ave. Train Station Queen St. Duke St. Note: Drawing taken from project plans. Circled numbers indicate signs placed for the detour.

Stage 2 Construction Detour: To Amtrak From 222 SB Detour McGovern Ave. Train Station Duke St. Note: Drawing taken from project plans. Circled numbers indicate signs placed for the detour.

Stage 2 Construction Detour: From Amtrak to 222 NB Detour McGovern Ave. Train Station Duke St. (CLOSED) Note: Drawing taken from project plans. Circled numbers indicate signs placed for the detour.

Stage 2 Construction Area: Keller Avenue Impact

Stage 2 Construction Detour: Keller Ave Detour McGovern Ave. Train Station Keller Ave. (CLOSED AREA) Note: Drawing taken from project plans. Circled numbers indicate signs placed for the detour.

Stage 3 Construction Activities: May, 2014 – September, 2014: – Open New Duke Street Bridge May, 2014 – Open McGovern Ave: Duke to Queen May, 2014 – Open Duke Street to Liberty May, 2014 – Open Christian Street to McGovern May, 2014 – Close Lititz Ave. (existing bridge) May, 2014 – Close Marshall and Implement Detour May, 2014

Stage 3 Traffic Configuration Around Train Station

Stage 3 Construction Area: Lititz Pike Closed to Build Cul-De-Sac

Stage 3 Construction Area: Lititz Pike and Marshall Ave. Marshall Ave. (CLOSED) Lititz Pike (CLOSED FOR BRIDGE DEMOLITION)

Stage 3 Construction Detour: Marshal Ave Detour Train Station SR 0222 SB TO MARSHALL/SR 0222 NB DETOUR ROUTE:

Stage 4 Construction Activities: September, 2014 – October, 2014: – Mill and Pave activities throughout the entire project. Paving operations and traffic control will be limited to the hours of 9 PM to 6 AM and should be completed no later than October 15, – Milling will be limited to: McGovern Ave from Queen to Prince Sts. Liberty St from Queen to Lime Sts. Old Lititz Ave.