Construction Contracting

Slides:



Advertisements
Similar presentations
Managing Construction Risks
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
VENDED PROGRAMS SFSP FY 05. What is a Food Service Management Company? Any organization (including commercial for profit companies, schools, or private.
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
CIVL202 Construction Engineering I
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Drawings and Specifications.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Construction Contract Documents
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Construction Contracts and Project Delivery Methods
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
United Nations Procurement Division
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CONSTRUCTION CONTRACTS DOCUEMENTS
Preparing the Bid Package (A Developers Perspective)
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CHANGES AND WHAT THEY MEAN FOR YOU 2013 EJCDC CONSTRUCTION DOCUMENT SERIES Matthew Skidmore, P.E. NC AWWA-WEA 95 TH ANNUAL CONFERENCE.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
1 Today’s pegboard Drawings & Specd due 11/21. 2 Today’s pegboard Cirrious Tightpinch.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
CONTRACT ADMINISTRATION
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Bidding Requirements Review Questions.
Pre-Construction Services
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
Request for Proposal & Proposal
Chapter#09 Management of engineering contracts
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
PROJECT DELIVERY METHODS
Manajemen Konstruksi Bidding & Award
Directed Change Constructive Change
Construction Management Services April 16, 2018
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Construction Contracting 2013 Providers Conference Presented By Todd Macalady Assistant Professor UAF AK TTAP

The Next Step Construction Project Development Phases of a construction project Preliminary planning and feasibility studies Preliminary engineering and design Final Design Completion Procurement Construction Closeout

Construction Bid Proposals Contains the cost estimate Includes all of the bid forms Required to bid competitively if government projects Private owners could require bidders to prequalify before bidding on a project

Instructions to Bidders Provides procedures to follow in order to bid on a project Provides detailed instructions on the requirements for the bid documents, bid submission, project information, and information on how to prepare the bid documents

The Bid Submission Process Owner issues bid documents (usually done by the owner’s representative) Contractors prepare their bid documents The bids are submitted at the location indicated in the bid instructions Public or private bid openings Contractors have to sign noncollusion statement that they did not work with other contractors during the bid process

Bid Advertisements Include Information on: The project Who is building it The A/E The date of issue A description of the work The basis of the bids The time of completion Bid opening information Where to locate the bid documents Prequalification requirements Statement on the right to reject any and all bids References to any government laws and regulations that pertain to the project

Bid Shopping Occurs when the prime contractor asks the subcontractors to lower their bids after a contract has been awarded or uses different subcontractors than the ones that submitted bids Results in additional profit to the prime contractor Illegal Could be prevented by requiring the prime contractor to provide a list of the subcontractors with the bid

Proposal Evaluation Evaluation and selection of contractor Bids are either responsive or non-responsive Issue Intent to Award Prepare contract documents

Contracts Set Forth The Terms And Conditions Of Agreements Protect Parties To A Contract Protect Parties When There Is A Default Help Parties To Determine Who Is In Breach Of Contract

The Need to understand Contracts The Legal Terminology The Basics Of Contact Law Whether A Contract Addresses The Requirements Of The Engineering And Construction Project Whether The Contract Favors An Engineer Or The Constructor To The Detriment Of The Owner

The Main Components of Construction Contracts General conditions Supplementary conditions Specifications Contract drawings (plans) Critical path method schedules

Components of Engineering Contracts Articles in contracts include: Services to be provided Owner’s responsibilities Schedule for rendering services Invoices and payment information General considerations

Components of Engineering Contracts Articles in engineering contracts include: Definitions Exhibits and special provisions Engineer’s services Additional services Construction cost limit Dispute resolution Allocation of risks

The American Institute Of Architects (AIA) Commercially Available Construction and Engineering Contracts Are Available Through The American Institute Of Architects (AIA) The Joint Engineering Contract Documents Committee (EJCDC) The Associated General Contractors (AGC) Other Professional And Trade Organizations Owner Developed Contracts

Difficulties in Contracts Arise Due to Interpretation which is Caused by: Vague Terms Unclear Contract Clauses Lack Of Familiarity With Contracts

Contract Administration Act Of Determining Whether The Contractor Is Meeting The Construction Contract Requirements Determining Whether The Contract Is Being Built According To The Contract, Plans, And Specifications

Changes to Contracts Definition of Changes Owner requested changes Inadequate design Material unavailability Budget changes Natural disasters

Five Types of Potential Alterations to Construction Contracts Changes Extras Deletions Modifications Waivers

Change Orders Document in writing the terms agreed to by both the Owner and the contractor for altering the scope of work Provide written instructions for contractors and they are signed by owners, the A/E, and the contractor For projects with bonds they are signed by the surety

Types of Items that Require Change Orders: Change orders are also used to correct construction documents if there are errors, omissions, or discrepancies Types of Items that Require Change Orders: Additions or deletions of work Unforeseen site conditions Changes in market conditions