Essex County Transportation Services Department Essex County Highways 2014 Construction Program Peter Bziuk P. Eng. Manager Construction Services.

Slides:



Advertisements
Similar presentations
AP STUDY SESSION 2.
Advertisements

Advanced Piloting Cruise Plot.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
ALGEBRA Number Walls
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
An Impact Analysis of Electrifying Florida’s Public Buses
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
LESNER BRIDGE REPLACEMENT PROJECT
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Status Update – February 18, CWATS - Vision Statement Adopted in 2012 “The County of Essex and its seven local area municipalities support active.
Transportation Services Department
Presentation transcript:

Essex County Transportation Services Department Essex County Highways 2014 Construction Program Peter Bziuk P. Eng. Manager Construction Services

Essex County Highways 2014 Construction Program Highlights –$25,018,00 expenditure level –Includes approx. $2,100,000 from 2013 –Rehabilitation Program –Capacity Improvement Program –CWATS Implementation

Rehabilitation Program 28 Planned Projects –5 Bridges ( 2 Construction, 3 Engineering) –6 Culverts ( 3 Construction, 3 Engineering ) –12 Roads –5 Maintenance

Capacity Improvement Program County is continuing a multi year capacity improvement program for the network County funding is being utilized, Senior level funding is being pursued 12 Planned Projects for 2014 –6 Construction, 6 Engineering

Essex County Highways Bridge Projects ($880,000) –2 - Structure Rehabilitations: CR Belle River CR Big Creek –3 - Engineering for 2015 construction: CR Big Creek CR Silver Creek CR Sucker Creek

Essex County Highways Culvert / Drainage ( $1,274,000 ) –CR Orton Drain culvert replacement –CR Ruscom River culvert replacement –CR Sullivan Creek culvert replacement –3 - Culvert Engineering projects for 2015 CR Lebo Creek CR 6-7 Sideroad Drain CR Gzowski Drain

Essex County Highways Road Projects ($4,147,000) –Recycling/Resurfacing: CR 8/ CR 11 - Tecumseh/Essex/Amherstburg CR 8/9 – LaSalle/Tecumseh/Amherstburg CR 9 - Amherstburg – 0.8 km CR 2 - Lakeshore – 2.9 km CR 7 - LaSalle – 3.5 km CR 13 - Essex – 2.2 km CR 14 - Leamington – 3.6 km CR 20 - Leamington – 0.9 km CR 23 - Essex – 1.4 km CR 25 - Lakeshore – 2.5 km CR 27 - Lakeshore – 2.3 km CR 34 – Kingsville/Leamington – 5.3 km

Essex County Highways Pavement Preservation ( $571,000 ) –Route and Seal – various locations –Surface Treatment – CR km –Micro Surfacing – CR50 – 6.8 km Bridge / Culvert Preservation ($405,000) –Various deck and expansion joint repairs –Various guiderail repairs / upgrades Estimated Quantities –26,790 tonnes of Hot Mix Asphalt –110,120 sm. of Pavement Recycling –18,400 tonnes of Granular A

Essex County Highways Capacity Projects ( $6,000,000) –CR 23/46 – Intersection Improvements – LS –CR 22 Phase 5 - Contract B – LS –CR 19/22 Improvements - Engineering –Various Connecting Link projects with Towns CR 22 – Lakeshore CR 6 – LaSalle CR 20 – Leamington

Essex County Highways EAs / Engineering in Process: –CR 19 / CR 22 Prelim. Design –CR 42 EA, City limit to CR 25 –Lauzon Parkway Extension – MTO/CoW /CoE –Active Transportation System ($52M) Annual $1,300,000

Essex County Highways Thank you for your interest, Thank you for your support in delivering our annual programs, Looking forward to working safely through the 2014 construction season.