11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 17, 2013 ANC 5E Briefing for: Northeast Boundary Neighborhood.

Slides:



Advertisements
Similar presentations
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in Slide Show view. Changes to the National Flood.
Advertisements

Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
Capital Program Oversight Committee (CPOC) May 23, 2011 Alok Saha, P.E., Program Manager, CPM Infrastructure and Facilities – Line Equipment, Shops & Yard.
Reorganization of Procurement Services for Public Works Construction
U-M Construction Forecast; June 22, 2011 U-M Construction Forecast Summer– Fall 2011 North Campus Neighborhood Meeting June 22, 2011 Prepared by AEC Preliminary.
1 M-150 / Botts Rd Interchange MoDOT Project No. J4P2251 Pre-Bid Meeting June 24 th, 2010.
Rock Creek Sewer Separation & Water Main Replacement – CSO 031, 037, 053 and 058 Presented to CWEA / WWOA / CSAWWA 2011 Tri-Association Conference Collections.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing On: Anacostia River Tunnel Briefing For: ANC 6B October 26,
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Project Background and Objectives
Capital Improvement Program City of Snoqualmie Public Works Department.
An Overview of the GWK Retention Treatment Facility and
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 7, 2014 Rainwater Harvesting: Update on Bioretention at Wangari.
New Elementary School Project Overview of Dept. of Ed Role  Project Review/Approval Cycle Project applications submitted to DOE – June 2004 DOE construction.
Newsletter January 2015 Contacts During sessions: Out of hours : Newsletter
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Onondaga County CSO Abatement Gray Project Update.
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Presentation to Maxwell Place Homeowners Association 1.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
Basement Flooding Improvement Program Town Hall Meeting, Ward 33 May 21, 2009.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Elevating the Quality of Life in the District LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION PROJECT UPDATE DECEMBER 15, 2015.
Smoke Testing Information
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
Comprehensive Sewer Planning Update Meeting M. Chris Swartz, Village Manager Mustafa Emir, Village Engineer March 23, 2015.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Stormwater Management
Welcome to the Libertyville Stormwater Master Plan Open House
Sewer System Presentation
Comprehensive Sewer Planning Update Meeting
City of Johnston East of Merle Hay Road Infrastructure Improvements
Natural Environment: 0% Impervious Surface Built Environment:
Colchester Interceptor System Improvements Project
Our city’s plumbing problem
OUR CITY’S PLUMBING PROBLEM
JLEIC Accelerator R&D Meeting
Presentation transcript:

11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 17, 2013 ANC 5E Briefing for: Northeast Boundary Neighborhood Protection Project Status Update Briefing on:

22 Northeast Boundary Neighborhood Protection Project Status Overview Northeast Boundary Tunnel Over $600 million Preliminary Design (on schedule; 2022 completion) First Street Tunnel Design-Build $150-$160 million Contract award October, 2013 (on schedule) DC Water and Design-Build Contractor public meetings November Construction anticipated to begin January, 2014 McMillan Stormwater Storage $12 million Under construction

33 McMillan Stormwater Storage Project North Capitol Street Diversion Intersection of North Capitol Street NW and Michigan Avenue NW Temporary storage tank (up to 3 million gallons) Scheduled completion (end of November 2013

44 McMillan Stormwater Storage Project Construction Schedule: North Capitol St NW Jun 2013 – Nov 2013 Construction Work Hours: Monday – Friday work in street, if required 9:30AM – 3:30PM Monday – Saturday Work in Street 7:30PM – 4:30AM

55 McMillan Stormwater Storage: Original Plan Use 2 existing sand filters at McMillan site Divert stormwater into storage during major rain events Up to 6 million gallons storage Irving St Michigan Ave First St. N. Capitol St. North Capitol Tank & Diversion Structure (under construction) First St Tank & Diversion Structure

66 Upstream Areas Tributary to First St. Tank Served by Combined Sewers DC Water performed due diligence investigations upstream as part of detailed design and found : Upstream area was not completely separated Low basements at Washington Hospital Center would require special project to protect from flooding Private campuses with private sewers DC Waters maps do not show the private sewers in these areas Maps available at the time of the Mayors Task Force showed the upstream public sewers to be separated 6 6 Rhode Island Ave Natl Rehabilitation Hospital Ken yon St First St Tank Portion of Wash. Hospital Center Portion of Soldiers Home Portion of Childrens Hospital

77 Irving Street Green Infrastructure Irving St Michigan Ave Construct Bioretention (Green Infrastructure) along Irving St Bioretention will be installed in the public right of way (traffic medians and road sides) Construction from November 2013 through spring 2014 N. Capitol St

88 Summary of Revised Plan Moved First St diversion structure south near Channing St Connects to First Street Tunnel McMillan storage tank (Cell 15) on First Street side will not be used Bioretention (rain gardens) on Irving Street Benefits Facility Original Plan (Million Gals) Revised Plan (Million Gals) North Cap Tank First St Tank First St In-line Storage--0.5 First St Tunnel-6.08 Bioretention--0.4 Total Keeps combined sewage in the sewage system where it belongs Directs stormwater to bioretention for treatment Allows hospitals and Soldiers Home to remain in service uninterrupted Bioretention improves District as a whole and serves as a model for green infrastructure

99 McMillan Stormwater Storage Project Construction Schedule: First St NW Start Dec 2013 Construction Work Hours: In coordination with DDOT and DCRA

10 First Street Tunnel Pre-Construction Surveys Residents are asked to complete the Pre-construction Survey and Neighborhood Mitigation Questionnaire that has been mailed. Pre-construction Surveys benefit the property owner by documenting the condition of the property before the start of construction. By taking advantage of the survey, you will make the process easier, in the unlikely event that a construction related damage claim needs to be filed. Without a pre-construction survey, DC Water will have no rational basis by which to confirm if your damage claim was related to the First Street Tunnel Project..

11 First Street Tunnel Utility Relocation Gas and electric utilities in specified locations throughout the Bloomingdale neighborhood will be relocated in advance of tunnel construction. Informational sheets with map will be hand delivered to residents within the affected area by DC Water. Work will begin in late September / early October. Having local gas and electric services relocated before construction keeps project on schedule.

12 Programs Available to Property Owners DC Water Backwater Valve Rebate program Purpose: Prevent sewage from backing up through the sewer lateral into lower level plumbing fixtures in a home Eligibility includes properties with reported sewer backups from the 2012 storms and also those hydraulically at risk from the design storm Program details:

13 Programs Available to Property Owners DC Water Engineering Consultations Purpose: Identify home improvements to protect against overland flooding Eligibility includes Bloomingdale and LeDroit Park residents with reported flooding in 2012 storms Program details:

14 Programs Available to Property Owners DDOE Rain Barrel/Cistern program Purpose: Detains stormwater to reduce sewer system overload Property owners in the Northeast Boundary drainage area upstream of N. Capitol Street are eligible to receive a free rain barrel or cistern Program details: program program DDOE Rain Barrel demonstration September 22, 2013 at the Bloomingdale Farmers Market (Big Bear Café)

15 Northeast Boundary Neighborhood Protection Project: Contact McMillan Stormwater Storage project information Tijuana Haynes First Street Tunnel project information Andrea Williams DCCR DCCR Website: dcwater.com/cleanrivers