Strategy 1 – Infrastructure QB.1 Utilize internal construction management services for 75% of projects falling under the formal State/County monetary thresholds.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Welcome to Who Wants to be a Millionaire
Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
EuroCondens SGB E.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter 8 Markups and Markdowns: Perishables and Breakeven Analysis.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
1 1  1 =.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
ZMQS ZMQS
1 Copyright Copyright 2012.
Richmond House, Liverpool (1) 26 th January 2004.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
ABC Technology Project
Capacity and Constraint Management
VOORBLAD.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
A Closer Look at Food Cost
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A SMALL TRUTH TO MAKE LIFE 100%
A small truth to make life 100%
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
How Cells Obtain Energy from Food
Presentation transcript:

Strategy 1 – Infrastructure QB.1 Utilize internal construction management services for 75% of projects falling under the formal State/County monetary thresholds of $300,000; with use of the Direct Material Purchases (DMP) process for 75% of projects that cost over $1 million. Saving dollars by eliminating construction management fees while reducing the costs of general conditions. Save 6% sales tax on significant material purchases by ordering directly from suppliers through the DMP process on 75% of projects over $1 million. GOAL : Construct high quality/energy efficient public facilities in the most cost effective and efficient manner possible while completing projects within budget and schedule.

Strategy 2 – Sustainability QB.3 Landfill diversion of all new construction and remodel projects. Divert 50% of construction waste from landfill. GOAL: Construct high quality/energy efficient public facilities in the most cost effective and efficient manner possible while completing projects within budget and schedule.

Performance Measurement IndicatorYr End 9/30/12 1 st QTR 11/12 2 nd QTR 11/12 3 rd QTR 11/12 4 th QTR 11/12 QB.1Total # of projects in process under $300,000: # of Projects Internally Managed: Goal=75% 20 total projects. 20 managed internally. 100% 15 total projects. 15 managed internally. 100%. 14 total projects. 14 managed internally. 100%. 19 total projects. 19 managed internally. 100% 20 total projects. 20 managed internally. 100% Total estimated savings by self –performing and eliminating CM fees: Goal=20% of Construction Cost $684,857 23% of total project costs $511,743 22% of total project costs. $515,089 23% of total project costs. $603,580 26% of total project costs. $684,857 23% of total project costs Percent of projects over $1 million utilizing Direct Material Purchasing process: Goal=75% 18 total projects. 16 managed w/DMP. 89% 18 total projects. 15 managed w/DMP. 83%. 18 total projects. 15 managed w/DMP. 83%. 18 total projects. 14 managed w/DMP. 78% 18 total projects. 16 managed w/DMP. 89% QB.2Percent of debris diverted from landfill: Goal=50% 72% of all project debris was diverted from the landfill. 1,888 tons were diverted 84% of all project debris was diverted from the landfill. More than 1,287 tons diverted 84% of all project debris was diverted from the landfill. 1,586 tons were diverted 70% of all project debris was diverted from the landfill. 1,665 tons were diverted 72% of all project debris was diverted from the landfill. 1,888 tons were diverted