WP-conveners 3rd phone meeting

Slides:



Advertisements
Similar presentations
Study of the Central Tracker for Huge Detector at the Linear Collider Takashi Watanabe Kogakuin University The 7th ACFA Workshop on Physics & Detector.
Advertisements

Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
D. Peterson, “Gaseous Tracking”, Review of US Program for Detector R&D for the ILC, Argonne Nat. Lab., Gaseous Tracking Daniel Peterson, Cornell.
Tracking Group Overview Bruce Schumm Cornell Linear Collider Workshop July
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
Linear Collider TPC R&D in Canada Madhu Dixit Carleton University.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
Marseille – January 17 th, TPCs for High Energy Physics David Attié Max Chefdeville,Paul Colas, Arnaud Giganon, Marco Zito,
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
23/08/2005 Ron Settles MPI-Munich/DESY Snowmass2005 TPC Large Prototype1 TPC R&D, Tasks towards the Design of the ILC TPC LC TPC R&D Groups OUTLINE of.
17 October 2003TPC ALEPH TPC Ron Settles, MPI-Munich/DESY1 The Aleph Time Projection Chamber Ron Settles, MPI-Munich/DESY TPC
ILC TPC resolution studies with charge dispersion in MPGDs with a resistive anode Madhu Dixit Carleton University & TRIUMF IPNS KEK 14/05/2005.
25/10/2006Ron Settles MPI-Munich/DESY 12th WP phonemeeting 25 October LCTPC/LPWP-12th phonemeeting –Date 25 October 2006 –Time 7:00 west coast 10:00.
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
Tracking Group Summary Bruce `Lefty’ Schumm UC Santa Cruz Arlington Linear Collider Workshop January 9-11, 2003.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
LCTPC “Advanced Endplate” (Discussion) LC TPC Meeting at ALCGP07 T. Matsuda.
Result of MWPC-TPC beam test ILC Detector Workshop 3-5 March 2005, KEK Osamu Nitoh, TUAT.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Ron Settles MPI-Munich LCTPC integration model
P. Colas for the LC TPC collaboration
EUDET Detector R&D towards the International Linear Collider
ILC Detector R&D in Japan
Micromegas module for ILC-TPC
Toward the final design of a TPC for the ILD detector
Ron Settles MPI-Munich/DESY 7th ACFA WS Taipei 9-12 Nov. 2004
OUTLINE of TALK Overview of the question Framework, TPC R&D status
Progress at Snowmass on some ILC physics, machine and detector issues
Carleton/Montreal/Victoria
OUTLINE of TALK Overview Motivation, LC-TPC R&D Status
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
LCTPC remarks for closed session
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

WP-conveners 3rd phone meeting Date 20 June 2006 Time 07:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan Phone +494089981390 code 52872# 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Agenda for 3rd phonemeeting -1.News -2.Report on the electronics (Leif and Luciano) -3.More ideas on the endplates (Dan) -4.Future meetings -5.AOB 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 AGENDA -1.News The PRC recommendations are were released last week: "7.2.2. TPC The PRC congratulates the LC-TPC collaboration for the successful operation of many small prototypes, both with GEM and Micromegas detectors, and for the interesting developments with silicon pixel readout. The PRC recommends that the organization be strengthened to coordinate the worldwide R&D effort towards a TPC detector for the ILC. The PRC encourages efforts on simulation studies, in particular as they may provide a crucial input for the eventual choice between detector options. The PRC supports the large prototype detector as the next major focus of R&D that is expected to be ready for operation by the end of 2007. The project will therefore be reviewed at the PRC 65 meeting." 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 Agenda -2.Report on electronics ideas Reminder: milestone for the Eudet facility 1000 altro channels available ------------12/2007 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 Agenda -3.Ideas for the endplate (Dan) Reminder: most urgent point for LP is to Design layout of endplate --- finalize ~12/2006 See Dan’s page http://www.lns.cornell.edu/~dpp/linear_collider/LargePrototype.html 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 AGENDA -4.Future meetings Since the ideas are very diverse at the moment we need rather frequent 1-hour phonemeetings to work through the options. For now: Bi-weekly meetings: next 05July,18July(Vancouver) -05July will include ----continued discussion about the endplates, ----a more detailed LP electronics proposal by Luciano and Leif, ----a discussion about R&D plans for the LP by Takeshi (he sent around the preliminary version). -At Vancouver, in addition to the above we can also decide frequency of next phonemeetings. After Vancouver there are (in addition to phonemeetings): -Paris, WP1 workshop? (between 4 and 15 September) -Eudet annual meeting MPI-Munich (18-20 October) -Valencia LC workshop (6-10 November) 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 AGENDA -5.AOB 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 Back up slides, for reference 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Akira Sugiyama – GLD DOD 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

RS study - LDC DOD - together with Joel Pouthas Philippe Rosier (IPN Orsay) 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 Aleph Endplate 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 Some features Zigzag structure prevented loss of tracks > θ~22° Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. Alu sandwich structure stiff, lightweight to - contain 7mb overpressure - provide forced-air thermal insulation between electronics and TPC volume Water cooling of 1kW electronics/side in addition - 22K channels per side Combination water/air cooling blocked all heat to TPC Overall thickness ~ 25%Xo (average) w/o cables Bending of endplate 20 micrometers due to 7mb overpressure 5 micrometers due to wire tension 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

TPC R&D Groups (7 June 06) America Europe Asia Other RWTH Aachen Bucharest CERN DESY U Hamburg U Freiburg U Karlsruhe UMM Krakow Lund MPI-Munich NIKHEF BINP Novosibirsk LAL Orsay IPN Orsay U Rostock CEA Saclay PNPI StPetersburg U Siegen America Carleton U U Cornell Purdue U Indiana U LBNL MIT U Montreal U Victoria Yale Asia Tsinghua U CDC: Hiroshima U Minadamo SU-IIT Kinki U U Osaka Saga U Tokyo UAT U Tokyo Kogakuin U Tokyo KEK Tsukuba U Tsukuba Other MIT (LCRD) Temple/Wayne State (UCLC) …Other groups interested? 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006

Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006 R&D Planning 1) Demonstration phase Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. 3) Design phase After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started. 12/10/2018 Ron Settles MPI-Munich/DESY 3rd WP phonemeeting 20 June 2006