Well Construction TCEQ’S Environmental Trade Fair - Austin, Texas

Slides:



Advertisements
Similar presentations
LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
WASTEWATER MANAGEMENT. TABLE OF CONTENTS Wastewater Management Reuse Recycle Discharge and Treatment Publically Owned Treatment Works On-Site and Decentralized.
HAULED WATER Gary Carlson Municipal Systems EPA Region 8.
WDEQ Sanitary Sewer Overflow Reporting Kevin M. Wells Natural Resource Program Manager WDEQ/WQD Herschler Building, 4 West 122 West 25 th Street Cheyenne,
This is a manual presentation. Click NEXT for the next slide, BACK for the previous slide.
Common Permit by Rule Authorizations in Texas
Public Health - Always Working for a Safer and Healthier Washington Washington State Department of Health Division of Environmental HealthOffice of Drinking.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
Drilling Gas Wells: Beginning to End. Seismic Exploration.
2012 Plumbing Codes International Plumbing Code Uniform Plumbing Code David McCarthy, P.E. City of Phoenix.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Connecticut Department of Energy and Environmental Protection.
Gary Carlson Drinking Water Program EPA Region 8
HOW DOES PLATTING AFFECT MY WASTEWATER PERMIT APPROVAL? A PRESENTATION BY EMIL HADDAD, R.P.L.S. E.I.C. SURVEYING COMPANY.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
10 NYCRR5 Eric W. Wohlers, P.E. Environmental Health Director Christopher G. Crawford, Ph.D. Water Resources Specialist Cattaraugus County Environmental.
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Society depends on clean and safe water.
Protecting Household Drinking Water Developed by: Susan Donaldson University of Nevada Cooperative Extension UNCE, Reno, Nev.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Lancaster County Property Transfer Code John Chess REHS, MPA, Water Quality Supervisor Lincoln Lancaster County Health Department Doug Smith REHS, Environmental.
Storm Water Strategic Initiative Greg Gearheart, Storm Water CA State Water Board.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Portion of the OSSF Rules regulating the minimum distance of OSSF components from various features.
Massachusetts Department of Environmental Protection Drinking Water Program.
After the Sanitary Survey
Septic Systems and New Homeowners GET PUMPED !. Overview Properly functioning septic systems are highly effective in treating wastewater 25% of the U.S.
Developing Green Stormwater Design Solutions For UIC Compliance Presented by: Adam Zucker PE, CWRE 819 SE Morrison Street ● Suite 310 ● Portland, Oregon.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
TCEQ Trade Fair Austin, Texas Overview of Source Water Protection Projects Mason T. Miller.
Developing the 2013 Israeli Guidelines for UV Disinfection Facilities for Drinking Water: Submitting a plan, operating and monitoring Dganit Eichen National.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
Not all changes will be discussed please view all regulations at
Picture this… You turn on your faucet to get a drink of water, but it is brown and stinks! You keep it running in hopes of “flushing” it out, but it doesn’t.
Bellringer. Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. – They include: solids,
Environmental Pollution -any addition of undesirable substances to the soil and air, and both surface and groundwater by human activities -can spread far.
 Oregon OSHA – 2016 Pesticide Symposium  Mike McCord  NW Region Manager 
Desalination for Drinking Water Purposes TCEQ Trade Fair David A. Williams, P.E Robert W. Sims, P.E. Austin, Texas May, 2016.
 Co-mixing: is the direct piping of human sewage into a manure storage basin.  Human Sewage: is defined as any waste from toilets, bathing, laundry,
WELLHEAD PROTECTION AND LAND USE “It’s Cheaper to Prevent Contamination”
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Oil & Gas Waste Stream Management and Permitting Options
New Licensing and Renewal Requirements
2017 Environmental Trade Fair Shannon Gibson
Your Public Water System’s Cross-Connection Control Program
Class I Injection Well Application Issues
Protecting Domestic Users of Nonpublic Water Wells
Sample Site Plans.
Classroom Catalyst.
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Van Wert, OH Water and Wastewater Element Training
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
How Well is Your Well? UIC Class I Well Construction Standards
2018 Environmental Trade Fair Shannon Gibson
Alexander Hinz & Kasy Stinson Water Supply Division
10 Feet Cistern, clear water drain
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Kasy Stinson Water Supply Division
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Presentation transcript:

Well Construction TCEQ’S Environmental Trade Fair - Austin, Texas May 6-7, 2014 Craig A. Stowell, P.E. Utilities Technical Review Team (UTRT)

Protection Strategy Multi-Barrier Approach Site restrictions Well construction Disinfection - Treatment Monitoring Well Protection Domestic Water Wells Less stringent siting and construction No required treatment or monitoring

TCEQ Rules Public Water System (PWS) definition PWS well 15 or more connections 25 or more individuals at least 60 days [30 TAC §290.38(66)] PWS well 30 TAC §290.41(c) Groundwater sources and development 30 TAC §290.42(b) Groundwater Treatment http://www.tceq.texas.gov/publications/rg/rg-195.html When is a PWS well required? – See definition: A system that provides to the public water for human consumption through pipes or other constructed conveyances, which includes all uses described under the definition for drinking water. Such a system must have at least 15 service connections, or serve at least 25 individuals at least 60 days out of the year.

Other Rules Domestic Wells Both PWS and Domestic Wells 16 TAC §76 Texas Department of Licensing and Regulation Both PWS and Domestic Wells Local Groundwater Conservation Districts Texas Water Development Board http://www.twdb.state.tx.us/groundwater/conservation_districts/index.asp TDLR regulates domestic wells TWDB has map of all GCDs

Public Drinking vs. Domestic Water Wells Poorly Constructed and Operated Wells can result in Bacteriological and/or Chemical Contamination of Wells Domestic Water Wells Less stringent siting and construction No required treatment or monitoring

Process Flow Diagram for Proposed Wells Depicts the plan approval process including plans approval, interim well approval and final sampling and approval.

Proposed Well Submittal Documents Cover letter Form TCEQ-10233 Engineering report Pollution hazard survey Draft sanitary control easement Scalable map Engineering plans & specifications Proposed Well Construction Checklist Engineering Report; System capacity requirements Well size and components Engineering plans & specifications by a Texas registered professional engineer; [§290.39(d)(1)] Pollution hazard survey; [§290.41(c)(1)(E)] Draft sanitary control easement; [§290.41(c)(1)(F)] Well location map.

Proposed New Systems Additional Documents Business plan Core Data Form TCEQ-10400 Water systems within ½ mile and evidence of attempt to connect Business plan; [§290.39(f)] Engineering Report; [§290.39(e)(1)] Capacity requirements; [§290.45] Present and Future conditions Normal and Emergency operation Water systems within ½ mile and evidence of attempt to connect; [§290.39(c)] Core Data Form

Engineering Report Area Served PWS classification Capacity Requirements Proposed Facilities Disinfection system Pressure tank Storage tank Pumps Survey of Pollution Hazards within ¼ mile Abandoned or inoperative wells Landfill and dump sites Animal feedlots Military, industrial or wood treatment facilities Liquid petroleum and petrochemical production, storage and transmission facilities Class 1, 2, 3 and 4 injection wells Pesticide storage and mixing facilities [§290.41(c)(1)(E)]

Pollution Hazards Survey Abandoned or inoperative wells Landfill and dump sites Animal feedlots Military, industrial or wood treatment facilities Liquid petroleum and petrochemical production, storage and transmission facilities Class 1, 2, 3 and 4 injection wells Pesticide storage and mixing facilities [§290.41(c)(1)(E)] Survey of Pollution Hazards within ¼ mile Abandoned or inoperative wells Landfill and dump sites Animal feedlots Military, industrial or wood treatment facilities Liquid petroleum and petrochemical production, storage and transmission facilities Class 1, 2, 3 and 4 injection wells Pesticide storage and mixing facilities [§290.41(c)(1)(E)]

Set Back Distances 50 feet 150 feet Sanitary sewer, septic tank, storm sewer Livestock in pasture 150 feet Septic tank drain-field, low dosage irrigation, low angle OSSF UG petroleum or chemical storage tank Improperly constructed well [§290.41(c)(1)(A)-(D)] 50 feet Sanitary sewer, septic tank, storm sewer Livestock in pasture 150 feet Septic tank drain-field, low dosage irrigation, low angle OSSF UG petroleum or chemical storage tank Improperly constructed well [§290.41(c)(1)(A)-(D)]

Set Back Distances cont. 300 feet Sewage wet well, lift station, drainage ditch 500 feet Sewage treatment plant, animal feed lots, solid waste disposal sites Properties treated with sewage [§290.41(c)(1)(A)-(D)] 300 feet Sewage wet well, lift station, drainage ditch 500 feet Sewage treatment plant, animal feed lots, solid waste disposal sites Properties treated with sewage [§290.41(c)(1)(A)-(D)]

Set Backs Depicts graphically the set back distances in prior two slides.

Map of Well Location Depicts an original or legible copy of a United States Geological Survey 7.5-minute topographic quadrangle showing the accurate well location to the executive director; and a map demonstrating the well location in relation to surrounding property boundaries. All map of well location.

Draft Sanitary Control Easement Use restrictions within 150 feet of well Landowners must record easement Improperly constructed wells Substitute deed if PWS owns all property Draft Sanitary control easement Use restrictions within 150 feet of well- All setbacks and pollutions hazards. §290.41(c)(1)(F)(i) The sanitary control easement(s) secured shall provide that none of the pollution hazards covered in subparagraphs (A) - (E) of this paragraph, or any facilities that might create a danger of pollution to the water to be produced from the well, will be located thereon. §290.41(c)(1)(F)(ii) For the purpose of a sanitary control easement, an improperly constructed water well is one which fails to meet the surface and subsurface construction standards for public water supply wells. Residential type wells within a sanitary control easement must be constructed to public water well standards. [§290.41(c)]

Proposed Well Construction Site Requirements: Premises, materials, tools and drilling equipment minimize contamination Water used for operations safe sanitary quality Drilling mud shall contain a chlorine residual of at least 0.5 milligrams per liter (mg/L) Slush pit - minimize contamination Temporary toilet facilities within 150 feet Safeguards from trespassers §290.41(c)(2) The premises, materials, tools, and drilling equipment shall be maintained so as to minimize contamination of the groundwater during drilling operation. §290.41(c)(2)(A)Water used in any drilling operation shall be of safe sanitary quality. Water used in the mixing of drilling fluids or mud shall contain a chlorine residual of at least 0.5 milligrams per liter (mg/L). §290.41(c)(2)(B) The slush pit shall be constructed and maintained so as to minimize contamination of the drilling mud. §290.41(c)(2)(C) No temporary toilet facilities shall be maintained within 150 feet of the well being constructed unless they are of a sealed, leakproof type.

Proposed Well Construction (continue 1) Well Casing Requirements; AWWA Casing extends 18 inches above floor Pressure cemented per AWWA Appendix C Pressure cemented extends to developed formation Contains no more than 0.25% lead

Proposed Well Construction (continue 2) Well Head Requirements; Two feet above 100-year flood elevation Slab edge three feet from the well casing in all directions with slope Sealed by a gasket or sealing compound Blow-off line points downward Sampling cock Flow measuring devices

Proposed Well Construction (continue 3) Other Requirements; Well gravel pack disinfected Well disinfected per AWWA for six hours All weather access road Intruder resistance fence

Disinfection Disinfection facilities shall be provided for all groundwater supplies Chlorine Gas Sodium Hypochlorite [§290.42(b)(1)] §290.42(b)(1) Disinfection facilities shall be provided for all groundwater supplies for the purpose of microbiological control and distribution protection and shall be in conformity with applicable disinfection requirements in subsection (e) of this section.

Treatment Treatment facilities required if water does not meet drinking water standards. Arsenic Iron and manganese TDS 4-log removal or inactivation of viruses based on raw water sampling results [§290.42(b)(2)] §290.42(b)(1) Disinfection facilities shall be provided for all groundwater supplies for the purpose of microbiological control and distribution protection and shall be in conformity with applicable disinfection requirements in subsection (e) of this section. §290.42(b)(8) The executive director may require 4-log removal or inactivation of viruses based on raw water sampling results required by §290.116 of this title (relating to Groundwater Corrective Actions and Treatment Techniques). §290.116(a) Applicability. All groundwater public water systems must comply with the treatment techniques and corrective actions of this section if a raw groundwater source sample was positive for fecal indicators or if the system is not required to conduct raw groundwater source monitoring because it provides at least 4-log treatment of viruses.

Ground Water Under the Direct Influence of Surface Water Depicts a ground water under the influence of surface water. Induced recharge of the well. Increased Monitoring

Rule Exceptions Must proceed the submission of plans Submit to Technical Review & Oversight Team (TROT) Written request with documentation Cite regulations for exception Cannot compromise public health [§290.39(l)(1-4) Must proceed the submission of plans Written Request with documentation Cite the regulations for exception Submit to TROT Cannot Compromise Public Health or Degrade service or water quality

Exception Flow Chart Well proposal submittal exceptions submitted to Technical and Review Team (TROT) §290.39(c)(1) or §290.39(l)(1) TROT Approves Well plans and specifications submitted to UTRT Upon Approval, well data used for source water assessments, sampling, and monitoring TROT Disapproves Revise and resubmit if applicable The flow chart describes the exceptions process. An exception must be approved before the plans and specifications can be approved . The well data is used by source water assessments, sampling and monitoring §290.39(c)(1) (c) Required actions and approvals prior to construction. A person may not begin construction of a public drinking water supply system unless the executive director determines the following requirements have been satisfied and approves construction of the proposed system.   (1) A person proposing to install a public drinking water system within the extraterritorial jurisdiction of a municipality; or within 1/2-mile of the corporate boundaries of a district, or other political subdivision providing the same service; or within 1/2-mile of a certificated service area boundary of any other water service provider shall provide to the executive director evidence that: §290.39(l)(1) The exception must be requested in writing and must be substantiated by carefully documented data. The request for an exception shall precede the submission of engineering plans and specifications for a proposed project for which an exception is being requested.

Common Exceptions Setbacks Sanitary control easement Improper pressure cementation Treatment technologies Common Exceptions Setbacks – USTs, abandoned wells, livestock, pipelines, sewage, septic tanks, etc. can infringe on setback distance to well Sanitary Control Easement Unapproved Existing Wells – Risky due to common problems such as collapsed casing, inadequate cement, etc. and can result in increased sampling costs * Arsenic, TDS, Iron

Potential Approval Conditions Steel casing required if petroleum tanks are in the vicinity of a well Increased raw water sampling Granted exceptions subject to revocation Design Changes – e.g. The requirement of steel casing if petroleum tanks are in the vicinity of a well Increased raw water sampling Any exception granted by the commission is subject to revocation

Construct Well TCEQ Approval Letter Construct in Accordance with the approved plans and specifications 48 hours notice to TCEQ before cementing Unforeseen circumstances, call TCEQ UTRT at (512) 239-4691 TCEQ Approval Letter Construct in Accordance with the approved plans and specifications 48 hours notice to TCEQ before cementing Unforeseen circumstances, call TCEQ

Well Completion Submittal State of Texas well report Recorded sanitary control easement Well location – USGS 7.5 Min topographic map 36 - hour pump test Raw water chemical analysis Bacteriological tests State of Texas well report Recorded sanitary control easement Well location – USGS 7.5 Min topographic map 36- hour pump test Raw water chemical analysis Bacteriological tests [§290.41(c)(3)(A)]

Final Steps Receive interim approval Call TCEQ to arrange for the official samples to be taken by TCEQ contractor Receive final approval Continuous monitoring as PWS Call TCEQ to arrange for the official samples to be taken by TCEQ contractor

TCEQ Website – www.tceq.texas.gov PLAN REVIEW STAFF Vera Poe, P.E. (Team Leader) Vera.Poe@tceq.texas.gov Kamal Adhikari, E.I.T. Kamal.Adhikari@tceq.texas.gov Brian Dickey Brian.Dickey@tceq.texas.gov Heidi Graham, E.I.T. Heidi.Graham @tceq.texas.gov John Lock, P.E. John.Lock @tceq.texas.gov Craig A. Stowell, P.E. Craig.Stowell@tceq.texas.gov Johnathan Pi, P.E. Johnathan.PI@tceq.texas.gov Pritesh Tripathi Pritesh.Tripathi@tceq.texas.gov Jose Castillo, P.E. Jose.Castillo@tceq.texas.gov Telephone (512) 239-4691 TCEQ Website – www.tceq.texas.gov Plan Review Website: http://www.tceq.texas.gov/utilities/planrev.html Vera Poe, P.E. (Team Leader) Vera.Poe@tceq.texas.gov Kamal Adhikari, E.I.T. Kamal.Adhikari@tceq.texas.gov Brian Dickey Brian.Dickey@tceq.texas.gov Heidi Graham, E.I.T. Heidi.Graham @tceq.texas.gov John Lock, P.E. John.Lock @tceq.texas.gov Craig A. Stowell, P.E. Craig.Stowell@tceq.texas.gov Johnathan Pi, P.E. Johnathan.PI@tceq.texas.gov Pritesh Tripathi Pritesh.Tripathi@tceq.texas.gov Jose Castillo, P.E. Jose.Castillo@tceq.texas.gov Telephone (512) 239-4691 TCEQ Website – www.tceq.texas.gov Plan Review Website – www. tceq.texas.gov/permitting/water_supply/ud/planrev.htm

Forms and Checklists Plan Review Website: Check Plan Review Status http://www.tceq.texas.gov/utilities/planrev.html Check Plan Review Status Download Well Construction and Well Completion for Interim Approval Checklists TCEQ Well Standard Construction Notes Links to Public Drinking Water Staff Guidance Documents Plan Review Website - http://www.tceq.texas.gov/utilities/planrev.html Check Plan Review Status Download Well Construction and Well Completion for Interim Approval Checklists Get updates on rules and new information Links to Public Drinking Water Staff Guidance Documents

Craig.Stowell@tceq.texas.gov (512) 239-4633 Questions? TCEQ Utilities Technical Review Team Craig.Stowell@tceq.texas.gov (512) 239-4633 TCEQ Utilities Technical Review Team Craig.Stowell@tceq.texas.gov 512/239-4633