Upscaling Basic Sanitation for the Urban Poor (UBSUP)

Slides:



Advertisements
Similar presentations
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Advertisements

Sanitation is Business
Water Services Trust Fund Sanitation Service Levels in Nairobi …and Beyond Presentation for the Nairobi Urban Sanitation Workshop 2 nd – 4 th July 2013.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Water Services Trust Fund Sanitation and the law 5/9/20151.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Water Services Trust Fund UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot & household.
UBSUP : Area Assessment and Site Selection Prepared by the UBSUP Team July 2014 WATER SERVICES TRUST FUND (WSTF) 1 ‘’Good area assessment and selection.
Water Services Trust Fund SafiSan Projects: The Project Task Team
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition and main Roles and Responsibilities 1 Project Task Team: Multi-stakeholder,
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
1 UBSUP Sensitisation Workshop Prepared by the UBSUP Technical Team TECHNICAL OPTIONS UBSUP Toilets & Treatment Options.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
The Sanitation Team Business Model Water Services Trust Fund.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Incentives for Stakeholders The UPC Team 17 th July 2014 (Embu)
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition, Roles and Responsibilities 1 Project Task Team: Multi-stakeholder; composed.
SafiSan Projects: Payments and Incentives for Toilet Emptying, Sludge transport and Treatment A step-by-step approach for WSPs Prepared by the UBSUP Team.
® Rainer Abendt Dr.- Ing. Rainer-Werner Abendt Nürnberg Contact: First WASPA Annual International Conference & Exhibition 8-9th September.
WATER SERVICES TRUST FUND The UBSUP/SafiSan Programme.
WATER SERVICES TRUST FUND The UBSUP/SafiSan Programme Simon Okoth Programme Officer - Sanitation Water Services Trust Fund Simon Okoth Programme Officer.
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
Water Services Trust Fund (WSTF) UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot &
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
1 Checklists of Swiss Solidarity Shelter Meeting Geneva May 2008 Presented by Tom Schacher, Swiss Solidarity (Technical checklists developed by Heiner.
Environmental Toolbox. Technical Module Introduction.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Finance & Business Models Prepared by the UBSUP Team.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) UBSUP Finance & Business Models The UPC Team 26 th June 2014.
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
Your Septic System Designing and its Maintenance.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
THE DTF CONCEPT.
Water Services Trust Fund Field Monitors Training Workshop
Sewerage and Sanitation Policies in Indonesia
Sanitation is Business
Farid Safi, Portfolio Manager, BORDA Afghanistan 23rd November 2016
The Sanitation Team Business Model
What is an on-lot sewage system?
Up-scaling Basic Sanitation for the Urban Poor (UBSUP) in Kenya
«Water Sector Reform in Kenya »
Module 1 Assemble the WSP team
Getting The Help Of A Professional Window Cleaner Gives You The Peace Of Mind
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Private Septic Systems
Quality Management Systems – Requirements
UBSUP Technical Options
Decentralised Treatment Facility (DTF)
LIVESTOCK PRODUCTION AND PRODUCTIVITY
Water Services Trust Fund
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Private Septic Systems
DTF implementation Roles and responsibilities
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
The UBSUP/SafiSan Programme
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Water Sector Trust Fund
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
What to Expect When You’re Inspected
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Role of the Internal Verifier
Presentation transcript:

Upscaling Basic Sanitation for the Urban Poor (UBSUP) Background information needed for the Site Selection for a DTF 10/12/2018

Objective: You are able to identify the correct site for your DTF 10/12/2018

Content Questions you might to ask yourself: What is the context of this session? Why is it a big deal to select a site? Who selects the site? What needs to be considered? Is there any support in selecting a site? 10/12/2018

What is the context of this session? The SafiSan Toolkit all info can be found in your manual 10/12/2018

Why is it a big deal to select a site? WSTF only approves a site for a DTF if 7 criteria a met: Overall criteria: Enhances public health conditions in the project area Closes the sanitation value chain by treating human excreta to allow its reuse in a safe manner Treats human excreta generated in urban LIAs where it is located or areas in its vicinity Technical criteria are mentioned on the next slide 10/12/2018

Why is it a big deal to select a site? Technical criteria: The DTF treats matter generated in UDDTs in order to ensure complete stabilisation and safe reuse The DTF treats FS that is exhausted from latrines and septic tanks that exist within the catchment area of the DTF The DTF ensures small per capita investment; hence sewer- based treatment of WW is not foreseen The standardised DTF treats approx. 22m3 of FS per day and/or matter generated from approximately 250 UDDTs 10/12/2018

Who selects the site? The site is selected by your DTF Technical Team In collaboration with relevant stakeholders: County Official County Resident Monitor (CRM) NEMA and WRMA PHO Chiefs, elders and residents Supported by staff and “Flying Squad” of the WSTF 10/12/2018

Who selects the site? Composition of the DTF Technical Team: Team should be set up within the WSP “Project Task Team (PTT)“ Core team should have 3-4 participants, incl. Technical Manager The composition of the DTF Technical Team should not change (staff for supervision and O&M should participate from beginning) If required, external consultants should be hired by the WSP 10/12/2018

Who selects the site? Required skills within the DTF Technical Team: Taking levels with a levelling device (surveying skills) Preparing technical drawings (architectural and structural) Preparing BoQs Construction supervision at site Basic knowledge on WW/FS treatment mechanisms is obligatory 10/12/2018

What needs to be considered? A holistic view on a potential site for a DTF is required Even small details can make a DTF project fail A potential site needs to be analysed thoroughly with certain considerations in mind.... ? 10/12/2018

What needs to be considered? Group Exercise “Site selection criteria”: Please arrange 5 company-internal working groups Kindly brainstorm within your group (15 minutes) which factors might be relevant for the selection of an appropriate DTF site, and why these factors are important Please present your findings (5 minutes) to the plenary 10/12/2018

Will the DTF serve the target group? DTFs primarily serve inhabitants of LIA Higher income area can benefit as long as focus is on urban poor Build DTF close to LIA where FS / UDDT matter is generated Short transport distances Avoid resistance from other areas that do not benefit 10/12/2018

Is the DTF required to treat excreta? Investment and O&M costs only pay off if a minimum quantity of FS and/or UDDT matter is treated WSP exhausters must really discharge into the DTF If no WSP exhausters: private exhausters will use it, otherwise FS treatment is not required (illegal dumping to be stopped with NEMA) Future demand needs to be assessed together with the County to ensure that demand does not decrease (e.g. construction of a sewer system) Autonomous developments to be considered, e.g. whether a LIA converts into a higher income area in close future 10/12/2018

Will the DTF “products” being used? Clarify where the treated effluent, dried sludge and compost is deposited and/or reused More beneficial if the end products are used : effluent for irrigation, dried sludge as soil conditioner, compost as fertilizer (► close the sanitation value chain) If reuse is not feasible, a more beneficial site should be considered Even without reuse, site might be okay as main objective is to improve public health 10/12/2018

Is land available? Land availability and evidence of official documents need to be proven to ensure that all the legal steps have been carried out 10/12/2018

Is land available? 1. Assure proper land is available for construction and operations Public land is preferred; if the land is provided by the County, an official and written permission should be obtained If bought from a private person, a title deed must be obtained in the name of your company 2. Assure that ... Required stakeholder are involved during site selection and verification Required approvals are obtained in time 10/12/2018

Is space available? Total surface area: Do all required DTF modules fit on the grounds? Layout and characteristics of the area: Is it possible to arrange the different modules in a logical / operational manner? DTF module Length [m] Width [m] Footprint [m2] Receiving Bay / Balancing Tank (RB/BT) 6 9 54 Settler (ST) 8 4 32 Anaerobic Baffled Reactor (ABR) / BT 11 44 Vertical Flow Constructed Wetland (VFCW) 30 330 Sludge Drying Reed Bed (SDRB) 19 209 Co-composting Area (CA) 10 80 + Space for an operator/storage building, between the modules, (bypass) piping, inspection boxes, manoeuvring exhauster ► Total footprint is about 1,000-1,500 m2. If only a CA is required, space requirement is 160 m2. 10/12/2018

How can the DTF being reached? Access to your DTF is of utmost importance, otherwise it is uneconomic and DTF will not be approached: Distance for exhausters max. ~10km (septic tanks, latrines) Distance SaniGo or other transport means max. ~ 5km (UDDT) Accessible by road Slope to and within the DTF appropriate for exhausters and manual means of transport 10/12/2018

Which role play slope and levels? Level differences within the DTF modules: DTF module Difference [m] Remark ST 0.10 Between inlet and outlet pipe ABR 0.15 Siphon/BT 0.85 Between ABR outlet and outlet of BT attached to ABR (for intermittent loading of VFCW) VFCW 0.70 Between feeding and drainage pipe Slope within the pipe network: Between BT outlet and ST inlet: 1% Between ST outlet and ABR inlet: 1% Between ABR outlet and VFCW inlet: 1% Between VFCW outlet and final discharge point: 0.5-1.0% 10/12/2018

Which role play slope and levels? Total level difference within DTF: Within treatment modules: 1.80m Within network: 0.7m (based on 6m between modules, 50m to river) Total level difference: ~ 2.5m (equivalent ~ 2% slope) ► If distance between modules reduce, required slope of terrain reduces ► Level of all treatment modules depends on level of final effluent discharge (e.g. flooding level of river) Δh Receiving Bay River 10/12/2018

What is the final effluent discharge point? Discharge points refers to effluent of VFCW (treated FS/WW) ► Nearby River (flooding level) - preferred ► Existing drainage channel / trench Point should be max. 100m from VFCW outlet Inspection chambers to be placed every 20-25m for cleaning of clogging 10/12/2018

Which role plays solid waste? Well sorted organic waste is required for co-composting: Bio-waste to be mixed 3:1 with UDDT matter in the CA Collected from LIA or markets Transported by SaniGo or existing solid waste collectors 10/12/2018

Which role play soil conditions? Soil conditions play a role during construction and related costing Type of soil: hard rock / soft soil → excavation cost; black cotton → deeper excavation until hard bed; clay → used for lining of VFCW Groundwater level: → pumping during excavation/construction; → special waterproofing might become necessary Soil moisture: wetland or flooding area → relocate pipes / modules 10/12/2018

Who will build the DTF? Your WSP needs to outsource construction to a contractor Construction quality is crucial to guarantee proper operations Reliable and capable contractor required Trained artisans, technically qualified staff Required equipment (e.g. concrete mixer, form works, dumpy level) Proven experience in comparable projects References and reputation Rigorous/permanent supervision by WSP is required 10/12/2018

Affordable: Revenues > Expenses: Is the DTF affordable? Affordable: Revenues > Expenses: Expenses: O&M cost: incl. operator, energy, preventative and corrective maintenance, repairs Incentive for Sanitation Teams to dispose of UDDT matter Revenues: Cost saving for unloading WSP exhausters into DTF Fee charged from private exhauster services (► law enforcement to avoid illegal dumping) Tariff increase approved by WASREB for improved service delivery Sales of compost and soil conditioner 10/12/2018

Is there any support in selecting a site? Decision matrix to check... Whether a site is generally feasible for a DTF Which treatment trains are required Tool for baseline data collection and field survey, incl. various templates Stakeholder analysis to explain roles and responsibilities of relevant actors Workflow chart to showcase which steps need to be taken and which stakeholder are to be involved at what point All tools are explained and tested within the course of this training 10/12/2018

Do you have any questions, remarks or suggestions? 10/12/2018