Energy Audit Process For Data Centers Len Kientz
Advertisements

Combines best global evidence into one definitive resource Targets the decision-makers: developers, investors and owners, and major tenants Looks specifically.
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Combines best global evidence into one definitive resource Targets the decision-makers: developers, investors and owners, and major tenants Looks specifically.
AIA Honolulu, LEED-CI Gold Intergen, LEED-CI Certified
The Committee and Research – Where are we and where might we be going?
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
The Washington Consensus Revisited A New Structural Economics Perspective Justin Yifu Lin National School of Development Peking University.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
February 4, 2015 National 8(a) Association Winter Conference Orlando, FL Sustainability for Small Business.
SEAP best practices on the Black Sea Coast Round table “Covenant of Mayors” Varna, Graffit Gallery Hotel.
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
LEED Leadership in Energy & Environmental Design.
2012 Business Plan CORPORATE SERVICES Successes – Legislative Services From the 2011 Business Plan Actions: Reviewed 300+ old bylaws (Risk Management)
Sustainable Design & Construction at Yale University July 2009.
What makes a building "green"? Referred to as being sustainable, or environmentally friendly Use of sustainable materials Materials must be used in such.
Sustainable Buildings Going Green. Green Building Building the Future with Intention Building to ensure that waste is minimized at every stage during.
Green Building – Green Business Devin Saylor, LEED ® AP Cost and benefits of green building in Bulgaria.
‘Asset Management – It’s not just Renewal’ Clare Gibson Manager Assets City of Port Phillip May 2013.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
A Business Case for Multi-Tenanted Office Buildings Creating a Win for Owners, Managers and Tenants BOMA: Achieving High Performance Through Innovation.
Green Building Design and LEED Certification ACMA 2008 Summer Conference 2008.
Learning by Design Using LEED to enhance teaching and learning.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
BALTIMORE CITY PUBLIC SCHOOLS GREEN SCHOOL WORKGROUP: MEETING 1 Green Ambassador INSERT NAME INSERT CONTACT INFO1 INSERT CONTACT INFO2 For additional information:
Hotel Monaco September 18-21, 2011 Washington, DC Green Program & Power saving emergency measures MLIT/BMMC Japan.
NEW YORK BANKERS ASSOCIATION Pennsylvania Credit Union Association Kevin W. Poirot Vice President May 23, 2008 Building Green: What You Should Know.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
LEED Mechanical Economic Analysis, Cost Reduction Strategies and Sustainability Support Services Reducing = Metal + Carbon + Energy + Water + Chemicals.
GLA ENVIRONMENT TEAM Working with BIDs London BIDs meeting Stephen Tate Assistant Director, Environment
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
ERES 2010 Arch. Simone Spreafico Engagement Director, Investment, Engagement Director, Investment, Advisory & Valuation Division Advisory & Valuation Division.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
© copyright 2012 CloudForest Software LLC CONSULTING & SOFTWARE Building performance simplified.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Fundamentals of LEED v4 for
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
Sustainable Laboratory Design: Challenges and Solutions
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
University of Central Florida David Norvell PE, LEED AP December 15,
Green Materials for building construction  Materials or products that Minimize resource use  Materials or products with Low environmental impact  Materials.
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
Civic Center/City Hall Public Information Meeting March 20, 2007.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
Green Building and Sustainable Architecture © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture A Responsible Approach to Environmental.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Cary, NC Oct March 2017.
LEED BD+C – Integrative Process
Green Building and Sustainable Architecture
Energy Efficiency investments European Investment Bank
By Jeff Burklo, Director
Sustainability-based Analytics
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
DBIA Manual of Practice
Need to Know these terms:
Leadership in Energy and Environmental Design (LEED)
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Project Management Sustainable Buildings and LEED July 29, 2011

Slide 2 AtSite Approach A holistic approach to Building Performance throughout their lifecycle AtSite provides decision support and ongoing Building Performance Management AtSite guides building improvement strategies and capital upgrades or modernizations AtSite manages construction/delivery of buildings, spaces, retro- fits and specialty projects (solar, etc.) AtSite ensures performance objectives are incorporated into design and it supports specialized design needs Plan/ Design Plan/ Design Construct/ Retrofit Operate Optimize

Slide 3 AtSite Selected Experience Choice Hotels International Rockville, MD LEED CI Silver Target IDEA Public Charter School Washington, DC LEED NC Schools Gold Target American Society of Hematology Washington, DC LEED NC Platinum Washington Adventist University Takoma Park, MD LEED NC Gold Target Reznick Group Bethesda, MD LEED CI Silver Target Am. Speech-Language-Hearing Rockville, MD LEED NC - Gold

Slide 4 Why Sustainable Buildings? Attract and retain tenants Decrease operating costs Improve overall return on investment (ROI) Establish competitive advantage Enhance public image and corporate responsibility Reallocate energy savings Increase market value of assets

Slide 5 Typical Design/Construction Work Flow DesignBiddingCloseoutConstructionStart Schedule Budget Assemble the Team Write Contracts Schedule Budget Assemble the Team Write Contracts Select Layouts Select Materials Select Systems Select Layouts Select Materials Select Systems Price Set Performance Expectations Price Set Performance Expectations Construct Coordinate Construct Coordinate Move In Close Contracts Move In Close Contracts

Slide 6 Start Build in additional time for coordination Build in additional soft (and potentially hard) costs Assemble the team with LEED experience Add LEED design and documentation requirements in contracts Schedule Budget Assemble the Team Write Contracts Schedule Budget Assemble the Team Write Contracts LEED kick off Establish project scorecard

Slide 7 Design Build in additional time for coordination Consider views, natural light, building orientation Consider reused, recycled, regional or renewable materials Consider high performance systems (LED lighting, water use reduction, geothermal, solar) Select Layouts Select Materials Select Systems Select Layouts Select Materials Select Systems Enhanced Commissioning (review of drawings) LEED Design Review

Slide 8 Bidding Obtain competitive market price Recycle or salvage waste material Reduce packaging Improve air quality during construction Price Set Performance Expectations Price Set Performance Expectations

Slide 9 Construction Track materials Track practices Document! Construct Coordinate Construct Coordinate Fundamental Commissioning (Review of construction process and review of installed systems)

Slide 10 Closeout Air Quality testing Rent-a-crate Post move surveys Document! Move in Close Contracts Move in Close Contracts LEED Construction Review

Slide 11 Strategies for Success Select experienced team Have designated LEED manager Write requirements into contracts Follow up; follow up; follow up

Slide 12 Challenges LEED not a priority Goals not followed through Need to educate non design/construction team members Follow up; follow up; follow up