PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.

Slides:



Advertisements
Similar presentations
Roles & Responsibilities in Construction Management
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
HEAT TRACING SPECIALIST
Commissioning Approach Integrated Service Solutions
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
INDUSTRIAL & SYSTEMS ENGINEERING
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Managing the Information Technology Resource Jerry N. Luftman
Software Project Transition Planning
Project Close Out CTC-470.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
The art of Engineering
XII- COST CONTROL, MONITORING & ACCOUNTING
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
Industrial Engineering Roles In Industry
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
CVE 4070 Construction Engineering Shop Drawings Quality Control
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Roles and responsibilities PM
Pre-Bid/Proposal Meeting
Installation Procurement Package
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Technical Scope of Work
Clinical Engineering Lecture (3).
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Traceability of Gas Pipeline Materials Research & Materials Manager
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Designers’ Manual Overview and Chapter Contents
Leo Associates Services
Technical Scope of Work
ARCH 435 PROJECT MANAGEMENT
Lecture 10 PROCUREMENT Ferdinand FASSA.
Piping and Instrumentation for Process Industries
PSS verification and validation
Construction Management Services April 16, 2018
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER

PROJECT MANAGEMENT ORGANIZATION BASED ON THE NEEDS OF THE PROJECT AT VARIOUS POINTS IN THE DEVELOPMENT MAJOR FUNCTIONS –ENGINEERING –PLANNING AND SCHEDULING –PROCUREMENT –CONSTRUCTION

ENGINEERNG FUNCTION INITIALLY IS CONDUCTED IN THE OFFICE ENVIRONMENT UNTIL THE PROJECT IS FUNDED EXTENDS TO THE JOB SITE AS DESIGN PROCEEDS MOVES TO THE JOB SITE WITH CONSTRUCTION TYPICALLY HAS PROJECT AND DESIGN DIVISIONS

PLANNING AND SCHEDULING FUNCTION RESPONSIBLE TO DEVELOP THE PLAN FOR THE PROJECT TO COORDINATE ALL ACTIVITIES TOWARDS SPECIFIC GOALS MONITOR PROGRESS TOWARDS GOALS OVERALL PROJECT RESPONSIBILITY –NORMALLY MADE UP OF SUBSETS –INVOLVES ALL PROJECT PARTICIPANTS

PROCUREMENT FUNCTION RESPONSIBLE FOR PURCHASING AND DELIVERY OF ALL MATERIALS AND EQUIPMENT USED FOR THE PLANT CONSTRUCTION PREPARE SPECIFICATION LOCATE VENDORS/CONTRACTORS SOLICIT BIDS MAKE AWARDS SUPERVISE SUPPLIERS

CONSTRUCTION FUNCTION RESPONSIBLE FOR ALL ACTIVITIES AT THE JOB SITE MANAGE ALL CONSTRUCTION OPERATIONS TEST THE FACILITIES PRIOR TO OPERATION BY THE CLIENT

OFFICE ACTIVITIES PRIMARY ACTIVITIES INCLUDE –DEVELOP THE CONCEPTUAL DESIGN –DEVELOP PLANNING AND SCHEDULING FOR THE PROJECT –DEVELOP THE DETAILED DESIGN –CREATE SPECIFICATIONS FOR EQUIPMENT PURCHASE AND SUBCONTRACT –DEFINE VENDORS AND CONTRACTORS.

OFFICE ACTIVITY DELIVERABLES ENGINEERING PROVIDES ALL PROJECT DOCUMENTATION INCLUDING: BFDs PFDs UFDs P&IDs DETAILED DESIGN DRAWINGS FOR CONSTRUCTION TECHNICAL SPECIFICATIONS PLANNING & SCHEDULING PROVIDES ALL PROJECT SCHEDULES –ENGINEERING –PROCUREMENT –OVERALL CONSTRUCTION, WITH DETAILS AS CONTRACTS ARE AWARDED –EXPENDITURES

EXAMPLE OF PROCUREMENT ACTIVITY CAN APPLY TO EQUIPMENT, MATERIALS OR SUB-CONTRACT SPECIFICATION PREPARATION ENGINEERING ACTIVITYPURCHASING ACTIVITY 1.0 Develop design, detailed or outline, fabrication or performance specification data. 2.0 Review Vendor Technical qualifications. 3.0 Develop final technical portion of bid specification 1.0 Define vendor list. 2.0 Develop Commercial specification and assemble for submission. 3.0 Submit RFQ to vendors and receive quotes.

EXAMPLE OF PROCUREMENT ACTIVITY AWARD CONTRACT ENGINEERING ACTIVITYPURCHASING ACTIVITY 1.0 Provide Technical clarification during bidding period 2. Technical Bid Clarification at Award 1.0 Monitor bid preparation and provide pre-award commercial clarification. 2. Prepare commercial bid tabulation. COMBINED ACTIVITIES 3.0 Make Recommendation for Purchase 4.0 CLIENT Select Vendor 5.0 Make Formal Award

EXAMPLE OF PROCUREMENT ACTIVITY EQUIPMENT FABRICATION PROCESS ENGINEERING ACTIVITYPURCHASING ACTIVITY 1.0 Provide Fabrication Technical Clarification 2.0 Review Vendor Drawings 3.0 Provide technical preparation for any changes 4.0 Witness shop tests 5.0 Receiving review 1.0 Obtain vendor schedules 2.0 Expedite and make progress payments 3.0 Review and confirm quality programs 4.0 Obtain all manuals, spare parts lists and Certified drawings

CONSTRUCTION FIELD ACTIVITIES OVERALL ADMINISTRATION OF JOB CONTROLS (PLANNING, SCHEDULING MONITORING) ACCOUNTING (BUDGET, PAYROLLS, INVOICES, ETC.) MATERIALS AND EQUIPMENT MANAGEMENT AND PROCUREMENT RECEIVING, WAREHOUSING, ORDERING AND ALLOCATION ERECTION EQUIPMENT UTILIZATION SUBCONTRACTS ADMINISTRATION - INTEGRATION OF S/C ACTIVITIES INTO THE OVERALL PROJECT PERSONNEL OPERATIONS FOR LOCAL DIRECT HIRE ACTIVITIES

CONSTRUCTION CRAFTS ADMINISTRATION CRAFT MANAGERS FOR DISCIPLINES - PIPING, ELECTRICAL, INSTRUMENT, WELDERS, ETC., USED IN EACH AREA CRAFT PERSONNEL - PIPEFITTERS, IRONWORKERS, BOILERMAKERS, WELDERS, ETC. QUALITY CONTROL - MONITOR ALL WORK TO ASSURE COMPLIANCE WITH FEDERAL, STATE AND PROJECT CODES. CONFIRM DIMENSIONAL INSTALLATION. CONFIRM PRE-COMMISSIONING TESTING.

FIELD ENGINEERING FUNCTIONS DEVELOP AND IMPLEMENT PROCEDURES FOR PRE-COMMISSIONING, COMMISSIONING, START-UP AND PERFORMANCE TESTING REVISE AND COMPLETE OFFICE DESIGNS MONITOR SUBCONTRACTORS FOR: –ADHERENCE TO CONTRACT PROVISIONS –CHANGE ORDER REVIEW

CONSTRUCTION PHASE SCHEDULING - TIME = MONEY OPTIMIZATION OF THE COST REQUIRED TO CONSTRUCT IS DEPENDENT ON TYPE OF JOB GRASS ROOTS - OPEN AREA FOR CONSTRUCTION –EVERYTHING MUST BE DELIVERED TO THE SITE, PEOPLE, EQUIPMENT, MATERIALS, ETC. –NORMALLY FEW MAJOR PHYSICAL LIMITATIONS, BUT LIMITED LOCAL SUPPORT SERVICES –SITE PREPARATION - OCCURS ON THE ENTIRE FACILITY

GRASS ROOTS CONSTRUCTION PLANT AREA ALLOCATION - ADMINISTRATIVE BUILDINGS, LAY-DOWN AREAS, CENTRAL SHOPS, STORAGE AREAS, MAY BE RELOCATED DURING THE PROJECT AND SOME PERMANENT FACILITIES MAY ACTUALLY BE USED FOR CONSTRUCTION. CONSTRUCTION SEQUENCE - CAN BE OPTIMIZED TO MEET CPM AND USE VARIOUS LEVELING TECHNIQUES TO EFFECTIVELY UTILIZE TRADES PERSONNEL, WHO MAY BE AVAILABLE IN LIMITED NUMBERS.

CONSTRUCTION IN EXISTING FACILITY REMOVAL OF EXISTING FACILITIES REQUIRED TO MAKE ROOM FOR NEW EQUIPMENT AND CONSTRUCTION OFF-SITE WAREHOUSING TO ALLOW COORDINATED DELIVERY CONSTRUCTION SEQUENCE INCLUDES ACCESS TO LARGEST COMPONENTS FIRST CONNECTIONS TO EXISTING OPERATIONS AND UTILITIES FOR CONSTRUCTION, TESTING, PRE- COMMISSIONING, START-UP AND TESTING SHUTDOWN AND REMOVAL OF REPLACED FACILITIES GT074/cb044360/

OTHER CONSTRUCTION SCHEDULING FACTORS OFF-SITE EQUIPMENT FABRICATION - GENERALLY PREFERRED FOR ANY ITEM REQUIRING FORMING OR MACHINING OTHER THAN SIMPLE THREADING, CUTTING OR WELDING. BETTER QUALITY EASIER TO HANDLE EXOTIC MATERIALS LIMITED IN TERMS OF SHIPPING FINISHED COMPONENTS AND SOME SHIPPING RISK MODULAR CONSTRUCTION - SKID MOUNTED, SHOP- COMPLETE PACKAGES

OFF-SITE EQUIPMENT FABRICATION ADVANTAGES MAY REQUIRE ADDITIONAL COORDINATION SINCE FIELD FITTING IS LIMITED AND CONNECTION TO EQUIPMENT FROM OTHER VENDORS MUST BE COORDINATED. PIPING - REQUIRES COMPLETED DESIGN PLUS COORDINATION TO DELIVER AS NEEDED FOR ERECTION. STEEL - REQUIRES COMPLETE DESIGN INCLUDING FIELD FIT SUPPORTS FORMINOR PIPING AND ELECTRICAL COMPONENTS ELECTRICAL - IDEAL METHOD WITH SHOP TESTING. TERMINATIONS MUST BE COORDINATED IN THE FIELD INSTRUMENTATION - SAME AS FOR ELECTRICAL

RESPONSILBILITIES DURING ERECTION & CONSTRUCTION QUALITY CONTROL MAINTAINENCE OF SCHEDULES –EQUIPMENT DELIVERY –MATERIALS –PERSONNEL SAFETY & ENVIRONMENTAL CONSIDERATIONS UPDATES OF ALL DOCUMENTATION TO AN AS-BUILT LEVEL otographs.com/stock- photos/special- construction-pictures/

PRE-COMMISSIONING OF FACILITIES LOCALIZED EQUIPMENT AND FACILITY TESTS PIPING - PRESSURE LEAK TESTS AND RADIOGRAPHY OF WELDS ELECTRICAL - CONTINUITY, CIRCUIT TEST, TERMINATIONS ROTATING EQUIPMENT - ALIGNMENT, DIRECTION, LUBRICATION INSTRUMENTATION - SIMULATION OF LOOPS NON-ROTATING EQUIPMENT - PRESSURE LEAK TESTS, CODE STAMPS CONCRETE - CORE TESTS m/html/commercial.html

COMMISSIONING OF FACILITIES LOCAL INTEGRATED SYSTEMS TESTS PIPING - FLUSH AND CLEAN LINES OPERATION - SIMULATE LOCAL SYSTEMS AND CONFIRM GENERAL CAPACITY AND OTHER PERFORMANCE CRITERIA CHECK ALL INSTRUMENTATION LOOPS AND SHUTDOWN INTERLOCKS FOR CORRECT CALIBRATION AND RESPONSE. CHECK ALIGNMENT OF ALL ROTATING EQUIPMENT UNDER LOAD INSPECT ALL EQUIPMENT FOR ABNORMAL WEAR AFTER INITIAL OPERATION REMOVE ALL TEMPORARY STRAINERS AND CONNECTIONS USED FOR COMMISSIONING ONLY

START-UP OF FACILITIES ACTUAL OPERATION OF INTEGRATED PLANT SECTIONS INITIAL OPERATION IN INDIVIDUAL AREAS TO PRODUCE PRODUCTS FOR DOWNSTREAM TESTING. TOTAL RECYCLE OR VENT TO STACK OPERATION TRAIN OPERATORS AND REVIEW QUALITY OF OPERATING MANUAL DRAFT VERSIONS.