PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I.

Slides:



Advertisements
Similar presentations
Complex Space Simulation Equipment DEVELOPMENT & BUSINESS APPLICATION STCU/NATO Workshop October 11-12, 2006 Kiev Yuriy Pokhyl Tel.:
Advertisements

BR Maintain and Updating in Census Year November 2008 Census Center NBS of China.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Category captains in «LENTA» Basic principles of cooperation.
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October What is the Megaports Initiative and which are its objectives? The.
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
OECD World Forum “Statistics, Knowledge and Policy”, Palermo, November
International Innovative NanoTechnology Centre Alexander Ruzaev JINR PAC, January 26, 2009 Joint Institute for Nuclear Research (IINTC)
Design on Target and Moderator of X- band Compact Electron Linac Neutron Source for Short Pulsed Neutrons Kazuhiro Tagi.
IAEA Perspective and Lessons Learned in Shipping HEU Spent Fuel to Russia Institute of Nuclear Materials Management 48 th Annual Meeting July , 2007.
1 106 th Session of the JINR Scientific Council Joint Institute for Nuclear Research On the Financial Support for the Seven-Year Plan for the Development.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 MAIN ASSUMPTIONS  Federal Law “ON USE OF THE ATOMIC ENERGY”  Federal Law “ON RADIATION SAFETY OF THE POPULATION”  Law of Russian Federation “ON CONSERVATION.
G.Shirkov, Basic Facilities, JINR Scientific Council, Status of the JINR Facilities G.Shirkov 1.Basic Facilities Operation and development 1.1.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
A.Vasiliev, IHEP-Protvino 2-nd PANDA meeting in Russia, April 26-28, 2010 IHEP activity in barrel Alexander Vasiliev (IHEP-Protvino) PANDA electromagnetic.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
th session of JINR SC 1 JOINT INSTITUTE FOR NUCLEAR RESEARCH Recommendations of the JINR Directorate for the financing of projects and themes.
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Recommendations of the Programme Advisory Committee for Condensed Matter Physics 20th meeting, April 2004 Wojciech Nawrocik JINR Scientific Council,
Recommendations of the Programme Advisory Committee for Condensed Matter Physics 19 th meeting, November 2003 Wojciech Nawrocik JINR Scientific Council,
1 1. Some recent views ( ) 2 Linac tunnel
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
February 21-21, 2008JINR Scientific Council 103-d session IREN project status.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Status of RF stations for NICA project MAC meeting october 2015.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
PAC on Nuclear Physics 20-th Session April 1-2, 2004, Dubna SAD STATUS REPORT ON THE SAD PROJECT & LONGTIME PERSPECTIVES V. Shvetsov FLNP.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
95 session of Scientific Council 95th session of the JINR Scientific Council PAC for Nuclear Physics 19th meeting, 13–14 November 2003.
Plan for future GaAs samples for TestBeam measurements JINR DLNP group (presented Z. Krumshteyn) JINR DLNP group (presented Z. Krumshteyn) FCAL Collaboration.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
ENTERPRISE OF STATE ATOMIC ENERGY CORPORATION “ROSATOM” FMB Lepse Dismantling Project Status Lepse IPMU 26 April 2013 Moscow.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Status of the SAD Project V. Shvetsov, FLNP. SAD Project Objectives Coupling all major components of ADS; Core design, safety assessment, licensing; k.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Preliminary Decommissioning Plan for the Canadian Light Source
EPC CONCEPTS and BUSINESS CASES
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
PRR Activation Meeting
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
János Krutzler Hungarian Atomic Energy Authority
UK Financial Plan & Risks
The report on the IBR-2 modernization
Status of the PANDA Magnet
Sales Process March 2017.
Advanced Research Electron Accelerator Laboratory
Radwaste: status & way forward
ThomX – Commissioning Meeting – 25/01/2018
SNS-PPU upgrades the existing accelerator structure
Regulatory system in Hungary
Presentation transcript:

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I. Furman Content 1.Short review of the written report 2.Status of the project in current year 3.Perspectives for year 2004 and up to 2006

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension 1. Short review of the written report Main results obtained during last 40 months are reviewed in the written report provided for members of the PAC. During this time essential progress was achieved in the project During this time essential progress was achieved in the project design ( a new improved technical project of multiplying target and its technological drawings, the part for approval of general engineering project of the IREN facility, a preliminary technical project of facility control system)

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension After forming of special LPP division aimed at creation of IREN linac After forming of special LPP division aimed at creation of IREN linac LUE-200 some progress was got in a design, construction and testing the elements of accelerator being on responsibility of JINR. Beside that practically all high-tech parts of the linac booked in Budker Beside that practically all high-tech parts of the linac booked in Budker Institute (accelerating sections, buncher and SLED system) were manufactured, tested and delivered to JINR. Most part of vacuum equipment of linac has been manufactured and Most part of vacuum equipment of linac has been manufactured and delivered from Czech Republic and Bulgaria as its contribution to JINR.

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension During last two years most part of linac equipment planned to produce During last two years most part of linac equipment planned to produce in JINR was really manufactured in the central workshop and in workshops of LPP and FLNP. After final shutdown of previous neutron source IBR-30+LUE-40 the After final shutdown of previous neutron source IBR-30+LUE-40 the old linac was dismantled, the accelerator halls in bld. 43 FLNP were repaired and an assembling of new linac LUE-200 has been started up. At the full scale RF stand was demonstrated two week non-stop At the full scale RF stand was demonstrated two week non-stop operation of the LUE-200 RF system at 90% of planned level of power.

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension Crucial result in creation of IREN multiplying target (MT) was achieved by the end of 2000 when plutonium fuel elements were commissioned and installed for temporary storing at Mayak plant Crucial result in creation of IREN multiplying target (MT) was achieved by the end of 2000 when plutonium fuel elements were commissioned and installed for temporary storing at Mayak plant After final shut-down of IBR-30+LUE-40 neutron source a dismantling of auxiliary reactor equipment has been realized After final shut-down of IBR-30+LUE-40 neutron source a dismantling of auxiliary reactor equipment has been realized In course of preparation of full decommissioning of IBR-30 a license for this activity was obtained, all necessary equipment was produced and the storage for activated elements of the reactor, bld. 117/6 was constructed In course of preparation of full decommissioning of IBR-30 a license for this activity was obtained, all necessary equipment was produced and the storage for activated elements of the reactor, bld. 117/6 was constructed

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension 2. Status of the project in current year During months after the 19 th PAC NP session main efforts were done on preparation for IBR-30 dismantling, installation of new linac and organization of transportation of IREN fuel elements from MAYAK plant and its storing at JINR. It was delivered a shadow shielding for new storage bld. 117/6It was delivered a shadow shielding for new storage bld. 117/6 The set of documents necessary for licensing of the storage in The set of documents necessary for licensing of the storage in Russian Agency for Radiation Safety is practically completed Russian Agency for Radiation Safety is practically completed But up to now it has not paid the dosimetric equipment necessary for But up to now it has not paid the dosimetric equipment necessary for commissioning of bld. 117/6. It can cause a derangement of full commissioning of bld. 117/6. It can cause a derangement of full IBR-30dismantling by the end of current year IBR-30dismantling by the end of current year

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension The progress in LUE-200 mounting could be estimatedThe progress in LUE-200 mounting could be estimated from comparison of pictures shown at November PAC session and the present ones

PAC Nuclear Physics, 1-2 April, 2004 Construction of LUE-200 Supporting columns

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of LUE-200 Installation of first section grid

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension Very recently, on March it was achieved practically planned parameters of the pulsed linac electron gun: Very recently, on March it was achieved practically planned parameters of the pulsed linac electron gun: Repetition rate - 50 Hz Repetition rate - 50 Hz Electron energy keV Electron energy keV Beam current - 5 А Beam current - 5 А Beam diameter at exit diaphragm - 10 mm Beam diameter at exit diaphragm - 10 mm Electron pulse duration ~ ns Electron pulse duration ~ ns Continuous operation time - 32 hours Continuous operation time - 32 hours

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension New fuel transportation The negotiations with MAYAK plant on conditions of transportation of The negotiations with MAYAK plant on conditions of transportation of IREN fuel elements are carried out IREN fuel elements are carried out A design of technical reconstruction of special room into JINR department for storing of fissile materials (DSFM) is completed A design of technical reconstruction of special room into JINR department for storing of fissile materials (DSFM) is completed An approval of nuclear safety for storing into DSFM is obtained An approval of nuclear safety for storing into DSFM is obtained But start-up of real works for equiping of the storage room and signing a contract with Mayak plant is blocked due absence of financing But start-up of real works for equiping of the storage room and signing a contract with Mayak plant is blocked due absence of financing

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension extension As very promising fact for future development of the project one could consider a successful implementation of agreement for reimbursement of JINRs debt from the contract with NIKIET, Moscow signed (and implemented) for working out of technological drawings for multiplying target (MT) manufacture As very promising fact for future development of the project one could consider a successful implementation of agreement for reimbursement of JINRs debt from the contract with NIKIET, Moscow signed (and implemented) for working out of technological drawings for multiplying target (MT) manufacture Now JINR could obtained these drawings necessary for choice of MT producers Now JINR could obtained these drawings necessary for choice of MT producers

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension 3. Perspectives for year 2004 and up to 2006 Main task of current year is to complete full dismantling of reactor IBR-30. It allows to start the licensing of the IREN facility construction Third task is to complete an assembling of main equipment of LUE- 200 in bld. 43 Second task is to deliver the IREN fuel to JINR from Mayak plant Fourth task is a choice of the multiplying target producer

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension But it is crucial for future of whole project an approval by JINR directorate of the corrected time-table with respective firm annual financing. But it is crucial for future of whole project an approval by JINR directorate of the corrected time-table with respective firm annual financing. The last point depends essentially from finding of new sources for support of the IREN project As it could be seen from tables presented below even in case of optimal financing a start-up of IREN source may be realized not earlier than by the end of 2006

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension Financial status of the project Financial status of the project Total budget of the project approved in 1994 was 3.7 M$ Total budget of the project approved in 1994 was 3.7 M$ Up to now it has been invested ~2.1 M$ Up to now it has been invested ~2.1 M$ including ~ 0.8 M$ during including ~ 0.8 M$ during More realistic estimation of the rest investments necessary to complete a first stage of the project could be obtained after a choice of multiplying target producer More realistic estimation of the rest investments necessary to complete a first stage of the project could be obtained after a choice of multiplying target producer