Transportation Estimators Association Annual Conference Synthesis on Construction Unit Cost Development Stuart D. Anderson, PhD, PE Texas Transportation.

Slides:



Advertisements
Similar presentations
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Advertisements

Project Procurement Management
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Maintenance Forecasting and Capacity Planning
FDOT State Specifications & Estimates Office
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Electronic Filing System Proposal Texas Ethics Commission January 31, 2013 Texas Ethics Commission January 31, 2013.
An Internet-Based Cost Estimation Tool Charles Engelke November 4, 2005.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Statewide Construction Database (SCD) Florida Department of Transportation Production Management Office June 29, 2006.
Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
Alternative Project Delivery
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Copyright Course Technology Chapter 11: Project Procurement Management.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
SE 555 Software Requirements & Specification Requirements Management.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
NCHRP 8-60 Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA.
LADOTD CONSTRUCTION COST ESTIMATING Charles Nickel, P.E. Cost Estimate & Value Engineering Director Office: (225)
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Conducting Market Research Teresa Anthony Level II PIP September 9, 2004.
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
This document is proprietary to Project Consulting Group, Inc. and contains confidential information which is solely the property of Project Consulting.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Enhancements in Estimation and Bid Analysis Randy Lawton Info Tech, Inc.
Recent Developments of the OECD Business Tendency and Consumer Opinion Surveys Portal coi/coordination
1 26 October 2013 Observation and Reflection on Official Statistics against Big Data Challenge Yuan Pengfei Research Institute of Statistical Sciences.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Using Franchise Inventory Tracking System (FITS) Better Pipeline Management & Development Forecasting.
Cost Estimation System CES Implementation at NDOR TUG 2006.
AASHTO Technical Committee on Cost Estimating AASHTO Subcommittee on Design Annual Meeting July 20, 2009 Lesly Tribelhorn, Chair, TCCE.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Maintenance Workload Forecasting
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
1 ACS Statistical Issues and Challenges: One-, Three-, and Five-year Period Estimates Alfredo Navarro U.S. Census Bureau Association of Professional Data.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
NCHRP Task 53 Stuart Anderson, Texas A&M Univ. Clifford Schexnayder, Arizona State Univ. Keith Molenaar, Univ. of Colorado Independent Cost Estimates.
Exemplary Steps A general reference for estimating with Oman BidTabs Professional Division of Project Management Indiana Department of Transportation.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Lecture 3 : Hard Systems Modelling UFCE8V-20-3 Information Systems Development SHAPE Hong Kong 2010/11.
A Software Engineering Model Based Curriculum Development Approach Leon Pan University of the Fraser Valley.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Service Life of Hot Mix Asphalt using PERMIT
Group #1 Alanood AlShehry ID# Hadeel AlEisa ID#
State Aid Construction
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Emulsion Task Force (ETF) Meeting
Cost Estimating Best Practices
State Aid Construction
Presentation transcript:

Transportation Estimators Association Annual Conference Synthesis on Construction Unit Cost Development Stuart D. Anderson, PhD, PE Texas Transportation Institute (TTI) September 2009

Overview Problem Description Objectives Synthesis Approach Follow-Up Analysis and Results Recommendations Outline Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Synthesis on Construction Unit Cost Development

Project cost estimating – Important component of the project development process Planning Scoping Design PS&E Common estimating approaches Historical Bid Based Estimation Cost Based Estimation Project estimates adjusted based on project type and size (i.e., complexity), market conditions, location and time Overview Problem Description ObjectivesFollow-upApproach Analysis Results Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Recommendations

Lack of systematic methodology to analyze and develop unit costs for construction projects Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Overview Problem Description ObjectivesFollow-upApproach Analysis Results Recommendations

Explore the current state of practice followed by other state agencies for developing construction Provide summary of the estimation practices followed by different state agencies Compare estimation practice of TxDOT with other state agencies Overview Objectives Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Problem Description Follow-upApproach Analysis Results Recommendations

Approach Texas Department of Transportation (TxDOT) Survey One Question Online Survey Approach Structure Flowchart Results Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Do you have a formal process that uses a systematic tool for developing unit prices that categorizes for issues such as complexity, total quantities, difficulty, and type of project? Please point us to your system on the web or transmit electronically or by mail Sent to all state construction engineers Replies received from 37 state agencies No state stated that they had any formal process for construction unit price development 14 state agencies stated they use a systematic tool for developing unit prices to support project estimation TxDOT Survey Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Divided into two sections: Section I – Construction Unit Cost Section II – Maintenance Unit Cost Survey request sent to Subcommittee on Construction and Subcommittee on Design membership list (one survey per state per subcommittee) A total of 104 online survey request sent to state agencies Received a total of 38 responses from 36 state agencies Online Survey - Approach Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Section I – Construction Unit Cost General Identifying estimating techniques that are coupled with unit cost development procedures Acquiring Unit Cost Information System used in extraction of unit costs from past contract details Storing Unit Cost Information Methods used in storing unit cost details in the database Accessing Unit Cost Information Mechanism to access unit cost information Applying Unit Cost Information Use of unit cost information in estimation process Online Survey - Structure Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Online Survey - Results General Section Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Online Survey - Results General Section Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Online Survey - Results General Section Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Well documented process or procedure for developing unit construction cost estimating? Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Online Survey - Results Acquiring Unit Cost Information Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations Types of historical bid data acquired from bid details

Online Survey - Results Storing Unit Cost Information Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations Storing Historical unit cost information

Online Survey - Results Applying Unit Cost Information – Formal Process/Procedure Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Project Size, Location & Complexity Current Market Condition Impact of Inflation Approach ObjectivesOverview Problem Description Follow-up Analysis Results Recommendations

Follow-up Approach Selection criteria for follow-up interviews Estimating approach Historical Bid Based Estimating Cost Based Estimating Trns*port Users Proposal Estimating System (PES), Cost Estimating System (CES), Estimator Non – Trns*port Users Innovative approach to estimating Sophisticated databases for historical unit costs Guidance on developing project estimates Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) ObjectivesOverview Problem Description Analysis Results Recommendations

Follow-Up Interviews - Approach Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations Telephone Interviews California Department of Transportation Florida Department of Transportation New York State Department of Transportation Utah Department of Transportation Virginia Department of Transportation Washington State Department of Transportation Texas Department of Transportation Dallas District Fort Worth District Personal Interviews Minnesota Department of Transportation Texas Department of Transportation – Bryan District

Planning Planning Cost Estimate Excel Scoping Project Cost Estimating System (PCES) Design Trns*port Proposal and Estimates System (PES) PS&E Estimator, Info Tech Pvt. Ltd GENERAL Virginia Department of Transportation (VDOT) Cost Based Estimation (Rational Estimation) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

VDOT updates equipment, labor and material rates periodically Over five years of historical data are maintained in its BAMS/DSS database Comprehensive two year historical bid price listing providing three low bidders available on their internet Virginia Department of Transportation (VDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Factors VDOT considers when adjusting unit prices Project site conditions Time limit Sequence of construction Seasonal Limitations Regional conditions Current market conditions Quantities/price relationships Inflation and risks associated with project Virginia Department of Transportation (VDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Unit prices adjusted based on the recent bids received as well Labor rates increased by 50% - 52% to reflect labor burden Production rates calculated using Site Manager Bid Item Duration Data System (BIDDS) Experience VDOT considers 24 months data for establishing unit prices Regression analysis carried out if sufficient historical data are available, else weighted average is used Virginia Department of Transportation (VDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Planning Excel Spreadsheet, TRACER Scoping Excel Spreadsheet, TRACER Design Trns*port Estimator PS&E Trns*port Estimator GENERAL Historical Bid Based Estimation New York State Department of Transportation(NYSDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) - Preliminary Cost Estimation Spreadsheet - Bridge Feature Cost Estimate Summary Spreadsheet Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Tracer - Preliminary estimates, flexible to adapt to special requirements of NYSDOT Bridge costs are estimated using the Bridge Shoulder Break Area methodology developed by NYSDOT Estimates are validated against current project or recently completed projects of similar scope Letting and Award System (LAS) extracts all bid information to be stored in BAMS/DSS 7 to 12 months of historical data used for establishing unit prices Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) New York State Department of Transportation(NYSDOT) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Historical unit costs are made available as: Weighted Average Item Price Report (WAIPR) Provides weighted averages of three low bidders for each line item based on the region and year of letting Regional and Statewide Average Award Price Report (RSWAAPR) Generated using Crystal Reports Software Provides average award price for each line item at the regional and statewide level NYSDOT performs a check on unit prices for major items of work using cost based estimation Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) New York State Department of Transportation(NYSDOT) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Planning Concept Cost Estimate Form – Excel Spreadsheet Scoping PDBS Design PDBS PS&E PDBS GENERAL Historical Bid Based Estimation Utah Department of Transportation (UDOT) PDBS – Project Development Business System Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Utah Department of Transportation (UDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) UDOT maintains guidelines for determining unit prices while estimating Guidelines outline the methods available for developing estimates at various phases of project UDOT stores all bid information in its PDBS database PDBS allows users to search bid data based on date range, quantity range, funding source, awarded bid and units UDOT uses weighted average for a duration of 3 months and 12 months to determine unit prices Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Utah Department of Transportation (UDOT) Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Red Flag Analysis : aids the engineer in developing an Engineers Estimate that account for factors affecting projects cost Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Planning MP3, PLCE Scoping EBASE, Excel Spreadsheet Design EBASE, Excel Spreadsheet PS&E EBASE GENERAL Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Cost Based Estimation Washington State Department of Transportation (WSDOT) Historical Bid Based Estimation Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

WSDOT uses a combination of cost base estimating and historical bid based estimating for preparing final Engineers Estimate Work items comprising largest dollar value of project estimated using cost based estimating (80-20 Rule) WSDOT maintains cost estimating guidelines which outlines the: Estimating Techniques to be used at different project phases Factors influencing the unit prices WSDOT stores all the bid information from the submitted bids into its EBASE database WSDOT considers three to six months of historical data for establishing unit price Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Washington State Department of Transportation (WSDOT) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

WSDOT - Unit Bid Analysis System Washington State Department of Transportation (WSDOT) Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Washington State Department of Transportation (WSDOT) WSDOT – Bid Tabs Pro Follow-up ApproachObjectivesOverview Problem Description Analysis Results Recommendations

Follow-up Analysis Results Research Findings Historical bid based estimating is still preferred form of estimating for almost all the agencies Cost Based Estimating is used only for preparing Engineers Estimate by very few agencies (VDOT, MnDOT) Most state agencies rely on Excel Spreadsheet to prepare Planning and Scoping Level Estimates Agencies like FDOT, Caltrans, VDOT have devised their own system to compute preliminary estimates based on Cost-Per-Mile values of typical sections Sophisticated systems like Trns*port CES, Estimator and PDBS are used for developing the final Engineers Estimate ApproachObjectivesOverview Problem Description Recommendations Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI)

Research Findings Few agencies like FDOT and Caltrans have their historical bid data based on Market Area Preferred form of storing historical bid data: 1. Standard Construction Line Item 2. Project Types 3. Work Categories Preferred statistical technique to apply on historical data: 1. Weighted Average 2. Simple Average 3. Scatter Plot with best fit Agencies like UDOT and TxDOT use moving averages (One month & Twelve months) for determining unit prices Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Follow-up Analysis Results ApproachObjectivesOverview Problem Description Recommendations

Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Conclusions State agencies have different approaches for developing unit costs Some state agencies have systematic approaches to prepare project estimates, but have no written documentation on the entire process including documentation for developing unit costs State agencies do not have a systematic process with respect to adjustment of unit costs Adjustments to unit costs are mainly based on experience and engineering judgment in state highway agencies Follow-up Analysis Results ApproachObjectivesOverview Problem Description Recommendations

Synthesis on Construction Unit Costs Development Texas Transportation Institute (TTI) Recommendations - General Consider Cost-Based Estimating for items of work related to Hot Mix Asphalt, Steel, and Concrete Consider the use of Cost-Based Estimating for project estimation in the Design and PS&E phases or a combination of both cost-based estimating and historical bid-based estimating, with cost-based estimating used to estimate major items of work Consider using information systems with powerful searching and reporting capabilities to access historical bid data Consider developing an approach similar to the Red Flag Analysis of UDOT to adjust estimates based on unique project and site characteristics Follow-up Analysis Results ApproachObjectivesOverview Problem Description Recommendations

Follow-up Analysis Results ApproachObjectivesOverview Problem Description Recommendations

Thank You! Texas Transportation Institute (TTI) September 2009