As one of the first steps in the retrofitting process, workers removed the existing concrete floor.

Slides:



Advertisements
Similar presentations
Earth retaining structures
Advertisements

1.Escalator (wood, grease) 2.One of: stainless steel escalators, cleaned mechanisms, sprinklers installed, smoke and fire alarms, smoking bans. 3.Pump.
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Construction Geometry
House Construction (Foundation Plans)
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
FORMWORK Prof Awad S. Hanna.
Chapter 3 Casing design.
Competency: Draw Wall Sections
CONSTRUCTION OF SOIL NAILING WALLS
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Foundations and basements
Hargrave Street Pumpstation – Site Preparation July 2014.
Foundations Excavations
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Concrete
Foundation Systems.
Foundation Systems.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Competency: Draw Foundation Plans
1 Groundwater Pollution Containment of Pollution.
Fundamentals of Building Construction, Materials & Methods, 6 th Edition Copyright © 2013 J. Iano. All rights reserved. 2 FOUNDATIONS F OUNDATION R EQUIREMENTS.
Floor Systems and Foundation Support
ASSALAMUALAIKUM & GOOD MORNING
Chapter 18 Foundations.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Mechanical for Oil Heat
Chapter 2b Foundations Shallow & Deep Foundations.
Intro to Concrete 18.0 & 19.0 Class notes.
Introduction to a pit installation
Topic B2 Sub-structure groundworks
FORMS, SCAFFOLDING and STAGING
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Site Work.
UNIT I RETAINING WALLS.
YES, IT'S AN ENTIRE 13-STORY BUILDING LYING ON THE GROUND.
Competency: Design and Draw Foundation Plans
Foundation Loads Dead Load Live Load Wind Load
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
BUILDING CONSTRUCTION
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
COFFERDAMS.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Mahatma Gandhi Institute of Technical Education & Research Centre
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Demonstrate Concrete Skills Form A wood or metal structure that confines concrete to the desired shape until it hardens.
Floor Systems and Foundation Support
Concrete Lesson 2: Site Preparation
SWIMMING POOLS CONSTRUCTED AND REPAIRED
APPLICATIONS OF TECHNOLOGY
Floors.
Soil Mechanics-II Earthen Dames
MATERIALS AND CONSTRUCTION I
International Building Materials and components
Building Construction I Sofia Sebastian 1
Building Frame (Column & Beam)
MATERIALS AND CONSTRUCTION I
Component or parts of a building
Pier Foundations Piers Suspended floor Ground beam Next slide.
Concrete A structural material made by combining cement, sand, aggregate, and water.
Soil Mechanics-II Earthen Dames
Competency: Design and Draw Foundation Plans
Competency: Design and Draw Foundation Plans
Competency: Draw Foundation Plans
BUILDING CONSTRUCTION Foundation
Presentation transcript:

As one of the first steps in the retrofitting process, workers removed the existing concrete floor.

Workers install one of the steel casings for the cement support piling. The pipes in the foreground were part of the dewatering system that reduced the effects of hydrostatic water pressure. Pumps were also installed to prevent water from seeping into the excavation site.

During the first stage of excavation, workers removed 23,744 cubic yards of dirt reaching 5-ft deep. The walls were reinforced as the depth increased.

Dewatering pumps are shown here behind the 3- by 10- by 9.5-ft oak beams that were used for wall reinforcement.

To provide angled support, tiebacks (0.6-in. diameter cables) were installed in 60-ft deep, 12-in. diameter holes which were then filed with cement.

The second stage of excavation.

Once excavation was complete, workers installed 689 tons of steel rods to reinforce the floor. Drain pipes within the steel mesh relieve hydrostatic pressure. Cement was poured through the steel to reinforce the floor.

The NBL's water proofing system consists of polyethylene sheeting, protection board and water barrier layers.

Some 645 tons of steel rods reinforce the pool walls. Wall forms were put into place to form the lower concrete walls of the pool.

Workers poured concrete for the upper 20 ft of the wall in sections using braced wall forms and steel reinforcing rods.

The pool was complete on Dec. 20, 1995, two weeks ahead of schedule.

CONSTRUCTION STATISTICS Excavation (dirt)641,088 cu ft 23,744 cu yards Wood lagging 3" x 10" x 9' oak timbers 1,782 timbers total Reinforcing steelFloor: 689 tons (1.378 million lb) Walls: 645 tons (1.29 million lb) Steel tie wire310 miles Concrete floor6 ft thick 5,300 cu yards 10,303 tons ( million lb) 530 concrete truck loads Walls5-ft thick below ground 2.5-ft thick above ground 3,500 cu yards 6,979 tons 350 concrete truck loads Water6.2 million gallons 25,823 tons ( million lb) Filtered at 5,400 gal/minute Heated to 86 degrees F