Michael R. Nosbisch, CCC PSP President - Elect

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
Requirements Engineering Processes – 2
1 Accessibility Forum Projects Bill Hetzner Jim Kindrick.
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Framework for Operations and Implementation Research in Health
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
1st Meeting of the Working Party on International Trade in Goods and Trade in Services Statistics - September 2008 Australia's experience (so far) in.
Medium-term strategic plan: planned financial estimates for the period E/ICEF/2009/AB/L.5.
North Carolina Office of the State Auditor Honesty Integrity Professionalism.
1 Solicitations/Advertisements Solicitations/Advertisements
Modern Systems Analyst and as a Project Manager
Chapter 7 COORDINATION WITH HMDOs [ENTER FACILITATORS NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department.
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Fair and Reasonable Pricing
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
Project Management from Simple to Complex
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Technology Module: Technology Readiness Levels (TRLs) Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
Project Management Education at Columbia Basin College For-Credit & Continuing Education AACE International - 4/17/20121.
Accuracy of Capital Project Cost Estimates Proposed Final Report Joint Legislative Audit & Review Committee September 23, 2009 Mark Fleming, JLARC Staff.
Roadmap for Sourcing Decision Review Board (DRB)
Alignment of COBIT to Botswana IT Audit Methodology
05/19/04 1 A Lessons Learned Process Celebrate the Successes Learn From the Woes Natalie Scott, PMP Sr. Project Manager.
Improvements to Project Development and Program Management of New Starts Projects FY 2008 Proposed Effective April 30, 2006.
Best Practices for an Owner Estimating Organization
PROJECT RISK MANAGEMENT
African Aviation Training Organization
Participation Requirements for a Patient Representative.
The Use of Professional Credentialing in Helping to Establish a Cost Estimating Capability Michael R. Nosbisch, CCC, PSP President - Elect.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
MIE2009 Good Evaluation Practice Workshop Pirkko Nykanen 1 Guidelines for Good Evaluation Practices in Health Informatics - A shared networked initiative.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Chapter 5: Project Scope Management
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Conducting the IT Audit
Project Management Process Overview
9 Closing the Project Teaching Strategies
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
U.S. Department of Energy Project Management: Communicating Progress – Celebrating Success Paul Bosco, PE, PMP, CFM, LEED-AP Director, Office of Procurement.
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Develop Project Charter
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
1 Interim Report of the IWGDD May Overview: Pursuing Goals to Harness the Power of Digital Data for Science and Society The IWGDD recommends that.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Implementing Program Management Standards at Duke Energy.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Chapter 1 Why Project Management? Chapter 1 Learning Objectives After completing this chapter, students will be able to: Understand why project.
Camera PDR/CD1 Planning 19 September 2008
Candidate Registration & Induction
Time Scheduling and Project management
Presentation transcript:

Michael R. Nosbisch, CCC PSP President - Elect The [AACE] Estimate Classification System Applied to the DOE CD Process Michael R. Nosbisch, CCC PSP President - Elect

Outline Introduction AACE International Estimating-specific DOE Relationship DOE Cost Estimating Guide (413.3-21) Estimate Classification CD Requirements “Mapping” Recommendations Conclusion

Introduction Key AACE members present to be recognized Michael Nosbisch Background VP of Project Controls for Parsons Government Group (2005 – 2009) Became active in EFCOG PMWG during this time VP of EVM for SM&A (2009 – present) Lead EVM Instructor for DOE’s PMCDP Consultant to several DOE contractors President – Elect of AACE (2010 – present) Presented on AACE to this group a few years ago in Idaho Falls Current BoD “sponsor” for cooperative agreement with DOE

AACE International Founded in 1956, currently largest global organization dedicated to furthering concepts of total cost management and cost engineering 8 regions 91 sections 7,708 members According to 2010 Membership Survey, 22% of respondents were Estimators by primary job function

AACE International Cost Engineering defined as the collective set of practice areas that includes the following: Business and program planning Cost estimating Economic and financial analysis Cost control Program and project management Planning and scheduling Cost and schedule performance measurement Change control Total Cost Management (TCM) is the "process" through which these practices are applied TCM Framework free download from website Will soon be available as web-enabled, process flow diagram tied to all AACE technical products

AACE International Estimating-specific Certified Estimating Professional (CEP) One of four “specialty” certifications currently offered Introduced in 2008, currently there are 110 CEPs in database Intent is to recognize specialists who meet established set of estimating criteria by examination, experience, education and ethical qualifications Recommended Practices (RPs) 17R-97: Cost Estimate Classification System 18R-97: Cost Estimate Classification System: As Applied in Engineering, Procurement, and Construction for the Process Industries (JAN 2011) 19R-97: Estimate Preparation Costs: As Applied for the Process Industries 31R-03: Reviewing, Validating and Documenting the Estimate 34R-05: Basis of Estimate 40R-08: Contingency Estimating: General Principles

AACE International DOE Relationship Cooperative agreement first signed in 1997 Reauthorized in 2002 and 2007 Current DOE “sponsor” is OECM Key elements: Advance “state-of-the-art” of TCM through increased communication and dialogue Apply established cost engineering/cost management principles, proven methodologies, and latest technology Develop new cost engineering/cost management methodologies and technology in pursuit of optimum resource utilization Encourage utilization of cost management standards and practices and their continual improvement/advancement

DOE Estimating Guide (413.3-21) AACE Estimate Classification System (1998 version included as Appendix J) Reprinted from AACE RP No. 18R-97, Cost Estimate Classification System – As Applied in Engineering, Procurement and Construction for the Process Industries

DOE Estimating Guide (413.3-21) DOE “Suggested” Estimate Classifications Only difference lies in specific Techniques (DOE) vs. Methodology (AACE) Additional table included in Guide showing “secondary characteristics” is an exact reprint from the AACE RP Reprinted from Table 4.2, U.S. Department of Energy Cost Estimating Guide

DOE Estimating Guide (413.3-21) AACE Estimate Classification System (2011 version) Reprinted from Figure 1, AACE RP No. 18R-97 (2011), Cost Estimate Classification System – As Applied in Engineering, Procurement and Construction for the Process Industries

DOE Estimating Guide (413.3-21) Critical Decision (CD) Requirements CD-0 Cost estimate range (i.e., order of magnitude) Due to lack of detail or design during early project formulation An estimate of costs to be incurred prior to CD-1 could also be required For developing Conceptual Design for project CD-1 Prior to approval of CD-1, project team should develop definitive estimate of near term preliminary design cost For PED funding request Life-cycle cost estimate (LCC) of likely alternatives that are being considered After selecting alternative, project team develops total project cost (TPC) range

DOE Estimating Guide (413.3-21) Critical Decision (CD) Requirements (cont’d) CD-2 Single point estimate that will represent entire project, utilizing current scope and associated design parameters 70-90% confidence level (CL) CD-3 Cost estimate based on Final Design [or sufficiently mature to start construction] May incorporate actual bids received from contractors used to establish project’s requirements for construction or execution CD-4 Final Estimate at Completion (EAC) In accordance with project’s approved WBS

Mapping Recommendations CD-0: Cost estimate range: Class 5 Rationale: At best, will use stochastic methods to develop cost ranges Assumptions will be made for drivers having significant impact on project cost Estimate of costs to be incurred prior to CD-1: Class 3 Resources needed to support Conceptual Design effort should be known within range of -20% to +30% Acquisition strategy and scope of work for Conceptual Design should also be known

Mapping Recommendations CD-1: Estimate of near term preliminary design cost: Class 3 Rationale: Class 3 is minimum requirement to be definitive estimate; for less complex projects Class 2 would be appropriate LCC of likely alternatives that are being considered: Class 5 Rationale: Data for some of life cycle costs will be available, but most will be projections, which will be applied to Class 5 estimate of project TPC range: Class 4 Rationale: This estimate uses as its basis scope that is at best only 15% defined There is still an overabundance of unknowns that will require allowances rather than definitive estimates

Mapping Recommendations CD-2: Single point estimate representing entire project: Low risk projects (left of 50% below): Class 3 High risk projects (right of 50% below): Class 2 Rationale: Class 3 requires 10-40% of full project definition; Class 2 requires 30-70% of full project definition Reprinted from Figure 3, DOE O 413.3B

Mapping Recommendations CD-3: Cost estimate based on Final Design [or sufficiently mature to start construction]: Low risk and final design complete: Class 1 If low risk and final design not complete: Class 2 If high risk (final design or not): Class 2 Rationale: For high risk, one of a kind or complex projects, some of detail will still not be fully developed CD-4: Final Estimate at Completion (EAC): N/A Rationale: Based on actual costs (no longer an estimate)

Conclusion Currently soliciting input from: AACE (Estimating Committee) EFCOG (Cost Estimating Subgroup) Once received/compiled, goal will be to formalize New AACE RP or Addendum to existing? Revision to DOE Estimating Guide?

Questions?