Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Report to TACIR on Underground Utility Damage Prevention in Tennessee
April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Electricity and Magnetism
ZMQS ZMQS
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Integrated Approach to Area Master Planning in Jubail Industrial City
ABC Technology Project
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Inner City Investment Initiative Preparatory Workshop: 22 September 2011 Inner City Streetscape revival: Public Open Space and Resources and Greening of.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
Twenty Questions Subject: Twenty Questions
Squares and Square Root WALK. Solve each problem REVIEW:
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Addition 1’s to 20.
25 seconds left…...
1.What is the name of the movement dedicated to establishing a Jewish homeland? 2. What city is holy to Islam, Judaism, and Christianity? 3. Where was.
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Comprehensive User Fee Study
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
Vision Investment Proposal. Meeting Vision Renewal Goals QUALITY OF LIFE CONNECTIVITY HEALTH.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
Presentation transcript:

Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks and Open Space Police Services Water and Waste Planning and Land Use Community Stakeholders

Aubrey Green & Public Riverbank Properties Ongoing challenges with public riverbank properties Safety concerns with restricted site lines (ie. No view to rivers edge from street) – – Difficulty monitoring the site Challenges with separation of public and private lands Graffiti Fires Vandalism Noise

3 Building Communities Initiative ( )

4 Overview of City Policy and Community Context Use of Rivers and Riverbanks –Parkways – Assiniboine Parkway and connections –Boat Launches – Red River focus –River Access / Parks – neighbourhood level –River Views / Parks and Scenic lookouts (ROW, etc.) Promote Safety in Design –Principles of Accessibility and CPTED Building Communities Program –Vimy Ridge –Streetscaping –Riverbank Parks –Design and Implementation and Expectations

5 Building Communities Initiative ( ) Aubrey Green Project: Granular path leading to sitting area with a view of the river Plantings Entry plaza Flag Pole and birdhouse at Entry Granular path Sitting area Entry plaza and flag pole City of Winnipeg Property

6 Multi-jurisdictional Aubrey Green adjacent to Water and Waste lands Difficulty distinguishing between Community Green Space and Public Utility Community Green Space Water and Waste Utility Private Property Aubrey Green & Public Riverbank Properties

7

8

Water and Waste Department Rehabilitation of the Mid-Town Water Main Kas Zurek, Design and Construction Engineer

10 Introduction History – 1957 to present Options – repair or replace Construction plans for 2011 / 2012

11 Mid-town water main A 900 millimetre (3 feet) diameter water pipe A critical component of the Citys water distribution system Balances the flow between two water reservoirs located in south and north Winnipeg

12 History Bridge constructed in 1958 Bridge and pipe are now approaching the end of their useful life

13 Damage from pipe freeze in 1993 Concrete structure damage Pipe damage

14 Pipe repairs in 1993

15 Evaluation process Assessed the condition of the pipe and bridge structure Determined that work was required Evaluated several repair/ rehabilitation strategies

16 Recommended option Replace the pipe and reinforce the existing bridge structure –cost effective –provides the longest service life

17 Options evaluated Install a new pipe by drilling beneath the Assiniboine River – difficult soil conditions Install a new pipe by open cut beneath the Assiniboine River – high ground water conditions, difficult soil conditions, regulatory concerns by Department of Fisheries and Oceans Repair the pipe by internal lining methods – cost prohibitive Other consideration Build a new bridge to support the water main and a pedestrian/ bike path – no funding support

18 Rehabilitation – construction activities

19 Rehabilitation – construction activities

20 Aubrey Green safety upgrades New fencing to clearly identify the two distinct uses – Water and Waste facilities, park area A new pathway leading to the river Remove or restrict lighting New fencing to prevent access to the properties east of the water main New landscaping on the lower river bank to deter unauthorized gatherings (e.g., late night parties, bon fires)

21 Proposed construction schedule September 2011 to June 2012 Sequence of work –remove existing pipe –upgrade the bridge structure –recoat (paint) the bridge structure –install the new pipe –landscape and restore the site

22 Thank you