From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
Michigan Department of Transportation Michigans Infrastructure Needs and Funding 2013.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
PDAs Accept Context-Free Languages
EuroCondens SGB E.
& dding ubtracting ractions.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Dennis L. Edwards Tunnel
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
The 5S numbers game..
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
TIGER GRANT Informational Meeting March 30, 2010 MARCH 30,
Coalfields Expressway & ADHS Corridor Q
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Media-Monitoring Final Report April - May 2010 News.
1 Item 11, Presentation to the TPB, September 15, 2010.
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
PP Test Review Sections 6-1 to 6-6
MTS – Capital Projects Update Transportation Night July 30,
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Biology 2 Plant Kingdom Identification Test Review.
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Sequence Quickies 1  ORB Education. Visit for the other resources in this pack.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
San Bernardino Associated Governments Presented to BDA/IE February 23, 2010 By Duane Baker, Director of Management Services.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); K+A Crashes.
Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); K+A Crashes.
Subtraction: Adding UP
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Let’s take a 15 minute break Please be back on time.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Clock will move after 1 minute
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
1.step PMIT start + initial project data input Concept Concept.
1 There are some pictures of Jinan Maybe you can imagine what is going on there Here we go…… most form Yang.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Presentation transcript:

From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck Traffic = 30% or 10,000 Trucks per day Estimated Cost to Widen to 6 lanes = $350 M (does not include rehabilitation of the exist. Pavement)

IDOT conducted a Feasibility Study in Franklin County to investigate adding the 3 rd lane to I-57

Yes, the I-57 traffic warrants an additional lane Widening should be accomplished by widening to the inside : minimizes right of way cost and impacts includes closed drainage where median is less than 64 requires widening of bridges does not impact overhead structures and interchanges Costs (excludes structures & rehabilitation of the existing pavement) Inside Alternate (50 existing median): $890/ft Inside Alternate (64 existing median): $1,030/ft Inside Alternate (80 existing median): $790/ft

Typical Sections : Inside Widening with 64 median (closed drainage in median ) Typical Sections : Inside Widening with 80 median (open drainage in median)

INCLUDES: FED. STIMULUS AND 2009 JUMP START PROJECTS

1. When replacing I- 57 Structures add the 3 rd lane … Underway 2. Rehabilitate I- 57 Pavement ….Underway 3. Begin design work on small fundable contracts to add the third lane, begin to introduce into the program or have ready for new funding initiatives ….Underway

Bridges completed that accommodate 3 lanes MP 51, I-57 over Crab Orchard Creek (S of Marion) MP 53, I-57 over old IL 13 in Marion MP 53, I-57 over the Crab Orchard and Egyptian RR MP 59, I-57 over Lake Creek (S of Johnston City) MP 90, I-57 over Casey Fork Creek (S of Mt. Vernon) Bridges in the program that will be built and will accommodate 3 lanes MP 54, I-57 over new IL 13 MP 65, I-57 over 7 th Street in West Frankfort MP 71, I-57 over the UP Railroad

PROJECT LOCATION ON INTERSTATE 57 IN FRANKLIN COUNTY REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER 7 TH ST. AND THE ABANDONED C&EI RAILROAD. LOCATED 0.7 MILES NORTH OF IL. RTE. 149 June 11, 2010 Letting

PROJECT LOCATION ON INTERSTATE 57 IN FRANKLIN COUNTY REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER THE UNION PACIFIC RAILROAD. LOCATED 1.1 MILES SOUTH OF IL. RTE. 14 IN BENTON September 17, 2010 letting (pending ruling by IL commerce commission)

Complete – I-57 NB IL 13 to Williamson/Franklin Co. Line Complete – I-57 NB & SB IL 14 to Franklin Co. Line Rubblization of I-57 will be complete in 2011 from IL 13 (Marion) to 1 mile north of Bonnie (south of Mt. Vernon)

I-57 Rubblization in Williamson and Franklin County, 2 nd Federal Stimulus (Jobs for Main St. Act: NB – Williamson/Franklin County line to IL 14 SB – IL 14 to north of IL 13 NB – 9.9 miles SB – 16.2 miles Estimated Cost - $32.7 M Summer work should begin in May and be complete in September Lane closures and delays expected

I-57 Rubblization in Jefferson County, Construction Now program: NB & SB - from the Franklin County line to 1 mile north of Bonnie 6.6 miles Estimated Cost - $15.8 Work in late 2010 and 2011 Work may begin in September, 2010 and be completed by July 1, 2011 Lane closures and delays expected

RUBBLIZATION EQUIPMENT

3 rd Lane Complete – Marion; South of MP 53 to north of MP 53- (not open to traffic) Funded in MYP- MP 92, I-64 south of Mt. Vernon, to MP 96, I-64 north of Mt. Vernon; design under way to add third lane and replace the pavement. Construction planned for Funded in MYP - MP 54 Marion, design underway to complete the 3 rd lane through Marion

Unfunded st priority: add third lane for 12.7 miles from north of IL 13 in Williamson County to south the Middle Fork Big Muddy River in Franklin County (north of Benton) Total Cost = $65 M 12.7 miles of 3 rd lane = $56 M I-57 over Pond Creek, SN &0002, replacement, $6.0 M I-57 over Lake Creek Branch, SN & 0011, widen structure and superstructure replacement, $3.0 M

Unfunded – 2 nd choice: add third lane for 8 miles from north of IL 13 in Williamson County to the Williamson / Franklin County Line Total Cost = $36.5 M 8 miles of 3 rd lane (80 median, open drainage) = $33.5 M I-57 over Lake Creek Branch, SN & 0011, widen structure and superstructure replacement, $3.0 M May be ready for a September, 2010 letting

The Federal Highway Administration (FHWA) estimates that a $1 billion of Federal highway expenditure supports 30,000 jobs which includes direct, supporting, and induced positions, defined as: Construction oriented employment, includes all jobs created by the construction firms that work directly on the project or by the firms that provide direct inputs (paving materials, steel, concrete, etc.) to the construction project; Supporting industries' employment, includes jobs in firms that provide inputs to the industries that directly provide materials and equipment used in highway construction. For example, a firm that produces guard rails is counted as 'construction oriented' employment but the firm that provides the sheet steel to make the guard rails is considered part of 'supporting industries' employment; and Induced employment, includes all of the jobs supported by consumer expenditures resulting from wages to 'construction oriented' and 'supporting industries' employment.

$1 billion of Federal-aid expenditure supported: 10,300 construction oriented jobs; 4,600 supporting industries' jobs; and 15,000 induced employment jobs $350 M in highway expenditures, according to FHWA, should translate into: 3600 construction oriented jobs; 1600 supporting industries' jobs; and 5250 induced employment jobs

Tuesday, January 26, 2010, from 4:00 p.m. to 6:00 p.m. at the Williamson County Pavilion, 1602 Sioux Drive, Marion, IL IDOT is seeking additional public feedback on development of its proposed Multi-Year Program for Highway Improvements

IDOTS WEBSITE