PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Electrical & Instrument Construction Department
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
The Effectiveness of Industrial Air Pollution Control Policy
Mod 373 “Governance of NTS Connection Processes”
PT. REKAYASA CAKRAWALA RESOURCES
ENGINEERING, SUPPLY & CONSTRUCTION COMPANY
 Waste Water Treatment Fax:
PT. KaRDoDi Engineering Services BackGround PT. Kardodi Engineering Services is a local company established since As one of the Company for Supply.
CAREERS IN MINING. It’s an exciting time to be involved in the minerals industry.
New eyes… New Vision… New Beginning… JOIN WITH US NOW…. New eyes…
C2C TechnoSoft Pvt. Ltd. (an ISO 9001:2008 certified company) Concept to Commissioning.
CE 3372 Water Systems Design
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Micro and Nano Characterization Facility
Electrical Engineering. Study electricity and electromagnetism for use in electronic devices. Subtopics include power, electronics, control systems, and.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
KAGIRA DRAWING SOLUTION BEST PIPING INSTITUTE IN CHENNAI.
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
EVERSMILE MANAGEMENT INSTITUTE PRIVATE LIMITED
Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Linggi Port Oil & Gas And Industrial Park
Quadna Field Installation Expert Field Installation Including Start-up and Commissioning Field Service Quadna Field Installation Expert Field Installation.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
Physical Properties of Hydraulic and Pneumatic Fluids Mohammad I. Kilani Mechatronics Engineering Department University of Jordan.
Yokogawa Indonesia < Document Number> Copyright © 2004, Yokogawa Indonesia January 26, 2005 Maintenance Services for GC.
PT. PRATIWI PUTRI SULUNG Co-Gen Duri PRESENTATION TO Chevron.
PT Yokogawa Indonesia Page.1 January 26, 2005 Maintenance Services for GC.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Power Plant & EquipmentSolutions by Ormeco International, Inc. Headquarters Headquarters 8811 So 208 th Street Ste. 2 Kent, Washington USA Phone.
CHAMPS Technology Srl World Leader Manufacturer of INSPECTION MACHINES.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Portugal & Spain: a pool of talent wanted by the rest of the world Our database : 900 engineers, ICT and technical profiles To Germany To The Netherlands.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
By PT. PLN Geothermal for Energy Business Forum of the 38 th Meeting of the APEC Working Group (Bali, November 17, 2009) 1.
Section 01 Executive Summary Section 02 Organization Chart Section 03 Telecom Division Activities Section 04 Construction & Test Equipment Section 05.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
DESIGN & DETAILED ENGINEERING CONSULTANT
 SPP-FINAL INTERNATIONAL Co. is a joint venture company Established by SUDANESE PETROLEUM PIPELINES HOLDING COMPANY (SUDAN) & FINAL CONSTRUCT INTERNATIONAL.
MEASURING AND FORECASTING COMPLETION. PROGRESS BY DISCIPLINE.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
ALMEER TECHNICAL SERVICES CO. W.L.L.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
SYREK ELECTRIC Phone – Fax Hr. Emergency – Wigington Road, Claysville PA For the past twenty-six years,
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
Natalie Stirling-Sanders Procurement Sustainability Manager September 8 th, 2015 – SPE Lunch Mexico Local Content.
1 Company Presentation. 2  About us  Our strengths  Our services  Our references.
TOPIC: TRANSFORMER-BASICS ENROLLMENT NO:
Chemical Engineering Drawing
By Muslim Sejong University
ChE 473K Plant Design R. Bruce Eldridge.
Traceability of Gas Pipeline Materials Research & Materials Manager
Aerospace Engineering
Operator Training Requirements
Piping and Instrumentation for Process Industries
SDEM ERECTORS NIGERIA LIMITED
Progress in the ITER Neutral Beam Test Facility
Chart Ferox, a.s. Děčín LNG Terminal Hamburg.
Presentation transcript:

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Head Office Jl. Bangka I no. 4A Lt.2, Pela Mampang Jakarta Selatan 12720, Indonesia Operational Office Jl. Cililin II No.17, Kebayoran Baru Jakarta Selatan 12170, Indonesia Phone : (62.21) 32151718 Fax : (62.21) 7201270

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company “Offtake Station Installation” “LPG Plant Flow Line System Phase 1” “LPG Tank & Loading System Phase 1” “PT. Styrindo Mono Indonesia’s Y-Strainer” “South Sumatra – West Java Gas Pipeline Onshore Project” “Ehtylene Gas Receiving System Project” “TTU Tuban Pertamina Project” “Kambuna Onshore Pipeline And Module-1 Onshore Receiving Facilities” “Gunung Megang Gas Booster Singa Pipeline Project”

Electrical / Instrumentation PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Engineering Process Piping / Mechanical Electrical / Instrumentation Civil Work As Built Drawing “Offtake Station Installation”     “LPG Plant Flow Line System Phase 1”    “LPG Tank & Loading System Phase 1”    “S “ outh umatra – est ava Gas Pipeline Onshore Project” “SSWJ S W  J     “Ehtylene Gas Receiving System Project”    “TTU Tuban Pertamina Project”      “Kambuna Onshore Pipeline And Module-1 Onshore Receiving Facilities”  “Gunung Megang Gas Booster Singa Pipeline Project”     

Electrical(s) & Instrument(s) PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Supplies Pipe(s) Fitting(s) Manual Valve(s) Instrument Valve(s) Electrical(s) & Instrument(s) “LPG Plant Flow Line System Phase 1”      “LPG Tank & Loading System Phase 1”      “PT. Styrindo Mono Indonesia’s Y-Strainer” 

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Installation Fabrication Painting Calibration & Testing Commissioning “LPG Plant Flow Line System Phase 1”     “LPG Tank & Loading System Phase 1”     

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company ManPower Supply “TTU Tuban Pertamina Project” Project Management ManPower “Jambi Merang Pipeline Project” Project Management ManPower

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Resources PROCESS ENGINEER 2 person(s) PIPING & MECHANICAL ENGINEER 2 person(s) CIVIL ENGINEER 4 person(s) PIPELINE ENGINEER 2 person(s) HSE ENGINEER 1 person(s) ELECTRICAL & INSTRUMENTATION ENGINEER 3 person(s) TELECOMMUNICATION ENGINEER 1 person(s) QA/QC ENGINEER 1 person(s) CONSTRUCTION ENGINEER 2 person(s) CONTRACT ADMIN & PROGRESS 2 person(s)

PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company Resources PROCESS software Hysis PIPING & MECHANICAL software Caesar, Pvelite PIPELINE software Autocad PDMS CIVIL software SAP ELECTRICAL & INSTRUMENTATION software Etap, InstruCal

PT. ESTU ARTHA LANCAR Thank You Engineering , Supplies & Construction Company Thank You