Grade Separation Alternative

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Dennis L. Edwards Tunnel
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
City of Oakland: Road Diet Experience
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Safe Driving Rules and Regulations
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
I-65 Added Travel Lanes Project in Tippecanoe County
Chapter 2 Signs, Signals, and Roadway Markings
Dam Failure Dams are generally an expensive structure that directly affect the economy of the area through power generation, flood control and water supply.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
Rte 11, Canton Village PIN Village Board Meeting October 29 th, 2007 Project Information.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
How would a truck get through? Any suggestions?. No parking allows access.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
General Tab Project, Cost Schedule, and Work Limits Roadway Character
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Intersection Design Spring 2017.
The I-465 West Leg Reconstruction Project
Rehabilitation Project
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
SE 12th Street Roadway Improvements February 8, 2005.
Technical Committee on Geometric Design
Southwest LRT METRO Green Line Extension
Contract 60X10 Informational Meeting Weber I-55
Metropolitan District | mndot.gov
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Presentation transcript:

Grade Separation Alternative A Feasibility Analysis of the Reconfiguration of Genesee Avenue at Governor Drive By: Daniel Aruta, P.E.

Topics for Discussion: What is a Grade Separation? Construction Impacts Traffic Analysis Environmental Impacts

PART 1: What is a Grade Separation? A facility which provides a physical vertical separation between two roadways crossing each other to alleviate traffic congestion and promote safety One roadway passes over another crossing roadway, and both roadways do not meet The upper roadway crosses over the lower roadway via a bridge Similar to a diamond interchange on a freeway A Grade Separation is not a tunnel! University Avenue in Park Slope

Sample of a Grade Separation Diamond Interchange of Interstate 15 at El Cajon Blvd in San Diego El Cajon Blvd Off Ramp Interstate-15

5 Basic Elements of a Grade Separation Interstate 15 at El Cajon Blvd in San Diego Bridge Retaining Wall Retaining Wall Ramp Depressed Roadway

5 Basic Elements of a Grade Separation Interstate 15 at El Cajon Blvd in San Diego Retaining Wall Bridge Retaining Wall Ramp Depressed Roadway

Genesee Ave Grade Separation at Governor Dr Bridge on Governor Dr passes over Genesee Ave below 2 Lanes on Genesee Ave are depressed to pass under the bridge 4 Ramps Inside Retaining Walls (4 each) Outside Retaining Walls (minimum of 4 each) Total Length from end to end = 1,787 ft. Begin Walls Begin Walls North Inside Retaining Wall Depressed Roadway Ramp Outside Retaining Wall Bridge Plan View

Vertical Scale is Exaggerated! Begin Grade Separation Vertical Separation Governor Dr above Genesee Ave 2 inside lanes of Genesee Ave below Governor Dr A bridge over a depressed roadway Vertical Scale is Exaggerated! Existing Roadway Governor Drive Genesee Depressed Roadway Avenue Begin Grade Separation End Grade Separation Vertical Profile View

Section Through Bridge Section where Genesee Ave passes under the bridge at Governor Dr Length of Bridge (Span) = > 50 ft. Width of Bridge = ± 110 ft. Section View

Section Through Retaining Walls Section of Genesee Ave north and south of Governor Dr (beyond bridge) Section View

Lengths of Retaining Walls Inside Retaining Walls: South of Governor Dr: 731 ft. long, max height greater than16.5 ft. North of Governor Dr: 936 ft. long, max height greater than16.5 ft. North 731’ 936’ Plan View

Part 2: Construction Impacts Utility Relocation Constructing the Bridge Constructing the Retaining Walls Road Closures Environmental Impacts Project Duration

Utility Relocation N Two 16” Water Mains 8” Sewer Electrical Duct Bank Gas Line Phone Cables Water Phone Elect Gas Sewer Governor Dr Water Phone Genesee Ave

Constructing the Bridge Drive Sheet Piling into the Ground Sheet Piling Section View

Constructing the Bridge Drive Sheet Piling into the Ground Excavate Pit for the Bridge Section View

Constructing the Bridge Drive Sheet Piling into the Ground Excavate Pit for the Bridge Construct the Bridge Section View

Constructing the Retaining Walls Drive Sheet Piling into the Ground Excavate Channel Construct Inside Retaining Walls and Depressed Roadway Construct Outside Retaining Walls for Sideslopes and Outside Roadways Section View

Extent of Sheet Piling in Genesee Ave For Depressed Roadway: Approx. 1,100 ft. each side of depressed road For Outer Retaining Walls: Lengths will vary North Depressed Roadway Sheet Piling Plan View

Environmental Impacts to Consider During Construction Noise Vibration Air Quality Truck Trips Contaminated Soils Example Backup Bells on Construction Equipment Driving Sheet Piling Diesel Exhaust from Construction Equipment Thousands of Truck Trips Soils Mitigation from 4 Gas Stations – Project Delay

Project Duration Utility Relocation = 6± months Mitigation of Contaminated Soils = ? Construction of Grade Separation = 2± years Total Project Duration = 2.5+ years

Road Closures during Construction Genesee Ave from Radcliff La to south of University City HS Intersection of Governor Dr and Genesee Ave Disruption to Vehicular and Pedestrian Traffic Loss of Access to Schools and Businesses Economic Hardship on Local Businesses Huge Detriment to the Community North 1,800 ft. Plan View

North/South Access during Construction No Bridge on Regents Rd 1,800 ft. of Genesee Ave closed Intersection of Governor Dr and Genesee Ave closed Police, Fire and Paramedic Service to University City will be severely challenged during construction

Alternate Routes during Construction Interstate 5 Freeway Interstate 805 Freeway State Route 52 Detour!

Part 3: Traffic Analysis – Post Construction Existing Traffic Movements at Intersection of Genesee & Governor Proposed Traffic Movements at Intersection of Genesee & Governor Level of Service and Lane Reductions at Split Points Elimination of Bus Stops

Existing N-S Traffic Lanes at Intersection 2 Southbound Through Lanes 2 Left Turns – SB Genesee to EB Governor 1 Southbound Right Turn 2 Northbound Through Lanes 1 Left Turn – NB Genesee to WB Governor 1 Northbound Right Turn Existing Intersection

Proposed N-S Traffic Lanes at Intersection 1 Southbound Combined Through/Right Turn Lane 1 Left Turn – SB Genesee to EB Governor 1 Northbound Combined Through/Right Turn Lane 1 Left Turn – NB Genesee to WB Governor Grade Separation

UC Golden Says: …and… Do The Math: NB: 78% of 33,000 = 25,740 ADT SB: 70% of 33,000 = 23,100 ADT

Street Classification and Level of Service (LOS) Level of Service “E” = 10,000 ADT for 1 Lane NB Traffic: 25,740 ADT > 10,000 ADT SB Traffic: 23,100 ADT > 10,000 ADT NB: 2.57 x Failure Volume SB: 2.31 x Failure Volume

Lane Reduction at Split Point Decision: Do I take the underpass or do I take the ramp to Governor Dr? “Governor Dr ” As most cars from two lanes vie for position into one lane, this will effectively create a “lane reduction” at the split point and traffic will back up! Split Point UC Golden: 1 Through Lane Ramp to Governor Dr

3 Bus Stops on Genesee Ave are Eliminated Post Construction

Part 4: Environmental Impacts – Post Const. Noise Neighborhood Character Tree Removal

Noise Sound acoustics are accentuated off retaining walls Increase in traffic volumes over time due to urban growth will increase ambient noise levels

Neighborhood Character University City is a residential community Only small retail except for commercial district on Greenwich Dr UC is not a major traffic generator like Golden Triangle Grade Separation will “urbanizes” the character of the neighborhood Should future University City appear like this?

Tree Removal 88 Conifer Trees 22 Eucalyptus Trees 5 Sycamore Trees 3 Others 118 trees will be removed

The End