The Hale Street Link Project. Project Vision The Hale Street Link Alliance will build a landmark, inner city bridge to enhance accessibility and livability.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
WELCOME TO NACKA CITY apartments, workplaces and an extended metro line. Welcome to a creative inner city development projekt in stocholm.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
APTA BRT Conference Seattle, Washington WHAT IN THE WORLD? AUSTRALIAN BUS RAPID TRANSIT – THE BRISBANE BUSWAYS Stephen Lucas Immediate Past Chairman Bus.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
6 th Street Water Main And Street Reconstruction 2013.
Senate Committee on Transportation, Technology and Legislative Affairs House Committee on Public Transportation Thursday, July 18, 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Knox City to East Burwood A 7.5km bike route that utilizes existing infrastructure.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description 342°
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Center City Access Strategy A Transportation Vision for Growth and Access.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Current Construction Projects Major Projects Pinellas County.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Elevated City Cycleway: a proposal for Perth City Perth is a city in metamorphosis. The three major developments currently underway (Foreshore, City link,
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Project Update Colorado Esplanade Project.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
AND TRAFFIC SETTINGS ENVIRONMENTS. RESIDENTIAL STREETS FACTORS???? DRIVING PATTERNS SPEED PEDESTRIANS PARKED CARS TRAFFIC LAWS.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Cycling Scotland Presentation
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
LUAS Cross City Brendan O’Brien Roads & Traffic Department.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
Our objective is to be the fastest growing airport in Australia We are Victoria’s aviation gateway – one airport, serving one great city, open 24/7 We.
Planes, trains & automobiles… Transport. Roads – some facts… Six million more vehicles on our roads now than in 1997 More two car households than no car.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Arizona Forward Update
Our plan for new river crossings for London
District 3 Complete Streets Projects
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Highway 169 Bridge Replacement & Pavement Resurfacing
Harbour Island Force Main Replacement
2019 Capital Program Title of Presentation
Presentation transcript:

The Hale Street Link Project

Project Vision The Hale Street Link Alliance will build a landmark, inner city bridge to enhance accessibility and livability in Brisbane.

The Alliance

SEQ Infrastructure South-East Queensland is the fastest growing region in the country, and the second fastest in the world. New roads, tunnels and bridges being built to accommodate for our ever-growing population.

SEQ Transport Infrastructure -Gateway Duplication -NSBT – now known as Clem 7 -Airport Link -Inner Northern Busway/Boggo Rd/Northern Busway -Haughton Highway -Tugun Bypass -Trackstar Rail -Brisbane Airport / Northern Access Road -Ipswich Motorway Upgrade -BCC road action program

What is HSL? Cost :$370 million Duration:July 2008-July 2010 Connection:Cross-river connection from Coronation Drive and Hale Street in Milton, to Montague Road, Merivale and Cordelia Streets in South Brisbane Key features: Four tolled traffic lanes Coronation Drive overpass Dedicated cycle and pedestrian links Equitable access

Connections… The bridge is designed to increase accessibility to and from some of Brisbanes most popular recreational, cultural, educational and residential precincts including South Bank, West End, Caxton Street and Park Road.

Northern connection New bridge intersection and associated road works Upgrade to surrounding paths and bikeways – ramps built providing equitable access to and from the bridge Outbound overpass with two lanes bypassing existing outbound traffic lights at Hale Street Boomerang Street overpass remains in operation

Northern connection

Southern connection Road works to Cordelia and Merivale streets to be one-way arrangements Re-alignment of Cordelia and Boundary streets at Montague Road Upgrade to surrounding paths and bikeways Development of public car parks

Southern connection

Bridge Concrete balanced cantilever bridge 2 bridge piers 300 metres long, 27 metres high and approximately 15 metres high above high tide mark Build from a temporary jetty on the southern side and by barge on the northern side

INSERT IMAGE OF BRIDGE

Current Status Final project design approved in July Bridge works began on the southern pier South side works include roadworks and car parks North side works include vegetation clearing and relocations and shared path works on Coronation Drive

What to expect during construction Removal of the right hand turn from Hale Street to Coronation Drive in January It will be reinstated on bridge opening Overpass construction– November 2009 to March 2010 during university holidays and Xmas period. There will be significant delays to Coronation Drive during this period and 24/7 construction Periodic weekend and night time lane closures along Coronation Drive and Hale Street when required

Keeping up-to-date Call 1800 HALEST ( ) Sign up today to SMS/RSS traffic alerts Sign up today to receive Hale Street Link newsletters Sign up today to receive construction notifications Website – –