SCOTT ELEVATOR CONSULTANTS

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
1 Human Resource Management Systems Chapter 6: HRMS Vendors Joseph Y-W. Deng
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Design & Layout of Foodservice Facilities
Genesis Solar Module Brochure ™
March 21, 2008Westin Horton Plaza, San Diego1 ASSOCIATION OF CALIFORNIA CONSTRUCTION MANAGERS A County Office Perspective Thomas Silva: Facilities Planning.
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD.
CHARO-SBA Women’s Center Presented by: Anita Rodriguez Acting Director.
InvestinSouthBay.com Property Management Service Proposal Prepared for: _____________ Date: _____________ Address:
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Federal Acquisition Service U.S. General Services Administration Ralph Lentz GSA, FAS, Management Services Center April 16, 2009 Contract Administration.
H&S Consultants Consulting Services and Project Management.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
The Contractor Development Program
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Documentation David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC Tel: (919)
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
October 2015 Labor Compliance Department Boot Camp Presentation 1 Presented by: Jessica Tam.
CONSULTANT SELECTION ACEC-Illinois/ IDOT-Region 1 Local Roads Seminar March 7, 2013.
Welcome to our online presentation. To proceed through the presentation, please use your right (forward) or left (reverse) arrow key or right click you.
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
4-1 Use of Feasibility Studies and Consultants National Food Service Management Institute The University of Mississippi.
Construction Management At Risk Process
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The Basics of Bonding & The Contractor Development Program Presented By: Navid Barkhordar.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Top 10 Ways to Expedite Design Reviews & Inspections.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Overview of MSBA Building Process and Project Timeline
Westshore Exterior Renovation Project 02/16/17.
Overview of MSBA Building Process and Project Timeline
Construction Oversight
QBS: The Process Selecting a Design Firm
“That’s my old place?!”.
The Contractor Development Program
Presented by: Deborah Early Icenogle Seaver Pogue, P.C.
Developing and Issuing the RFP
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
CAPITAL PROGRAM OVERVIEW
How to Build a Great Team
REAL ESTATE SERVICES DEPARTMENT
Administrative Activities Program Update
Commercial Property Inspections
San Benito County Local Transportation Authority Request for Proposals # Operation of San Benito County Express and Specialized Transportation.
How to Prepare a Quality Modification Request
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Inspections for Home Buyers
Presenters: Sergio Rodriguez, EAS Operations Manager | Kitchell CEM
Construction Management Services April 16, 2018
Presentation transcript:

SCOTT ELEVATOR CONSULTANTS CONSULTANTS, INC. ABOUT OUR COMPANY 27601 Forbes Road, Suite 8, Laguna Niguel, CA 92677 (949) 582-4100 Fax:(949) 582 4114

OUR MISSION At Scott Elevator Consultants, our customers receive dedicated assistance in identifying and resolving their vertical transportation needs. The result? Improved elevator service and greater savings.

OUR HISTORY SCOTT ELEVATOR CONSULTANTS Since 1973, our customers have received reliable counsel from Qualified Elevator Inspectors certified by the National Association of Elevator Safety Authorities (NAESA).

OUR HISTORY We also remain active in the industry SCOTT ELEVATOR CONSULTANTS We also remain active in the industry through professional memberships such as:   National Association of Vertical Transportation Professionals (NAVTP) National Association of Building Owners and Managers (BOMA) National Association of Elevator Safety Authorities (NAESA)

OUR SERVICES Equipment Condition Evaluations Due Diligence Evaluations SCOTT ELEVATOR CONSULTANTS Equipment Condition Evaluations Independent analysis of operating condition, level of maintenance, ADA compliance, and any necessary repairs to vertical transportation equipments (more info) Due Diligence Evaluations For sale or purchase of existing office buildings (more info) Remaining Useful Life Estimations For capital budgeting purposes (more info) Next slide

OUR SERVICES Maintenance Specifications Modernization Specifications SCOTT ELEVATOR CONSULTANTS Maintenance Specifications Including bid/negotiation services (more info) Modernization Specifications Including bid/negotiation services (more info) Monthly/Quarterly Maintenance Support Includes maintenance deficiencies audit and follow up with client’s maintenance provider (more info) Next slide

OUR SERVICES Computerized Traffic Analysis New Construction SCOTT ELEVATOR CONSULTANTS Computerized Traffic Analysis Provide report and actual traffic graphs (more info) New Construction Includes schematic design, design development, contract documents/bid services, and contract administration (more info) Next slide

WHY CHOOSE US? Our Flexibility: SCOTT ELEVATOR CONSULTANTS Our Flexibility: Our clients receive services customized to meet their individual needs. These services include reports formatted and submitted per their specifications. We utilize the latest computer and digital technology when offering opinions and recommendations. While we are located in Southern California, we have worked with clients throughout the United States, and even abroad.

WHY CHOOSE US? Our Staff: SCOTT ELEVATOR CONSULTANTS WHY CHOOSE US? Our Staff: Customers find our employees to be reliable, detailed, and informed. Our consultants are easily accessible and provide 24-hour emergency contact. Our staff includes a certified CMC and QEI certified consultants. Additionally, each of our consultants holds a minimum of 30 years experience within the elevator industry.

PARTIAL CLIENT LIST Our customers include: Building Owners SCOTT ELEVATOR CONSULTANTS PARTIAL CLIENT LIST Our customers include: Building Owners Property Management firms Homeowners’ Associations (HOAs) Government Agencies Developers and Architects.

SCOTT ELEVATOR CONSULTANTS PARTIAL CLIENT LIST Los Angeles County Metropolitan Transit Authority (METRO) Property Condition Assessments LPA Architects, Inc. Lennar South Coast McDonnell Group Building Safety Solutions Southern California Edison

PARTIAL CLIENT LIST County of Ventura County of San Diego SCOTT ELEVATOR CONSULTANTS PARTIAL CLIENT LIST County of Ventura County of San Diego USAA Realty Company Cal State University, San Marcos The Irvine Company PM Realty Group CB Richard Ellis RiverRock Real Estate Group

CONTACT US! 27601 Forbes Road, Suite 8 Laguna Niguel, CA 92677 SCOTT ELEVATOR CONSULTANTS CONTACT US! 27601 Forbes Road, Suite 8 Laguna Niguel, CA 92677 Tel: (949) 582-4100 or (800) 977-7268 Fax: (949) 582-4114 www.ScottElevator.com

Intentionally blank

Equipment Condition Evaluations SCOTT ELEVATOR CONSULTANTS Our Customers Receive: Executive Summary Maintenance Deficiencies List Letter to Elevator Service Company Data Sheets Hydraulic Elevator ,Traction Elevator , Escalator ADA Compliance Form Photographs of Equipment Return to “Our Services”

Due Diligence Evaluations SCOTT ELEVATOR CONSULTANTS Due Diligence Evaluations Our Customers Receive: Elevator Report Data Sheets ADA Compliance Sheets Photographs of Equipment Return to “Our Services”

Return to “Our Services" SCOTT ELEVATOR CONSULTANTS Remaining Useful Life Our Customers Receive: Remaining Useful Life Estimation Return to “Our Services"

Maintenance Specifications SCOTT ELEVATOR CONSULTANTS Maintenance Specifications Our Customers Receive: Phase I: Equipment Condition Evaluation and Report (Optional) Phase II: Maintenance Agreement Specification Phase III: Bid Solicitation and Negotiation Process Bid Documents Request for Proposal, Instructions to Bidders, Qualification Statement, Bid Submission Form, & Maintenance Specification Job Walk Bid Analysis and Recommendation Return to “Our Services”

Modernization Specifications SCOTT ELEVATOR CONSULTANTS Modernization Specifications Our Customers Receive: Phase I: Equipment Condition Evaluation and Report (optional) Phase II: Modernization Contract Documents Phase III: Bid Solicitation and Negotiation Process Bid Documents Request for Proposal, Instructions to Bidders, Qualification Statement, Bid Submission Form, Specification Bid Analysis and Recommendation Phase IV: Construction and Contract Administration Submittal Review and Progress Inspections Return to “Our Services”

Monthly/Quarterly Maintenance Support SCOTT ELEVATOR CONSULTANTS Monthly/Quarterly Maintenance Support Our Customers Receive: Maintenance Deficiencies List Letter to Elevator Service Provider Follow-Through Compliance We provide scheduled maintenance support for clients including: South Coast Plaza CB Richard Ellis Arnel Property Group METRO Lakeshore Towers Thomas Properties Group Return to “Our Services”

Traffic Analysis Our Customers Receive: SCOTT ELEVATOR CONSULTANTS Traffic Analysis Our Customers Receive: Traffic Analysis Summary Report Traffic Analysis Data Population Data Return to “Our Services”

New Construction Our Customers Receive: Phase I: Schematic Design SCOTT ELEVATOR CONSULTANTS New Construction Our Customers Receive: Phase I: Schematic Design Space requirements determined, space planning sketches provided, code consideration addressed Phase II: Design Development Scheme developed and refined, materials/equipment/ provided, coordination of all design items, detailed budgetary costs examined Phase III: Construction Documents Review project and plans with Architect, develop detailed Specification with Scope of Work for installation, establish bidding requirements Phase IV: Bidding Process Bid package developed, analysis and recommendation of received bids Phase V: Construction Administration Return to “Our Services”