4482166.2 Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.

Slides:



Advertisements
Similar presentations
Presenters Scott Gaudineer, Program Executive Caldwell Flores Winters
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
The Managing Authority –Keystone of the Control System
0 - 0.
Addition Facts
Construction Engineering 221
Benefits of Construction Management
Construction Contracting
Managing Construction Risks
Innovative Contracting
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
State Agency Contracts Considerations for Performance Reviews
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Procurement Management
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
Program Management Office (PMO) Design
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
Information Privacy and Data Protection Lexpert Seminar David YoungDecember 9, 2013 Breach Prevention – Due Diligence and Risk Reduction.
IAEA Training in Emergency Preparedness and Response Development of Simulation Exercise Work Session (Drill) Module WS-012.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Addition 1’s to 20.
Week 1.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Pricing Subcontractors’ Work
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
WELCOME Getting Smart About Home Modifications A Webinar Series Sponsored by the Wisconsin Department of Health Services Webinar #4 Quality, Affordability.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
1 Outsourcing: Managing the relationship Example: Reclining chair project FIGURE 12.1.
Introduction Time Quality Cost Project Constraints Success Introduction.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Purchasers’ Showcase 2007 Successful Bidding in the Public Sector March 2007.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Outsourcing: Managing Interorganizational Relations Chapter 12.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Presented by: Jane Bachynski March 1, 2016 Avoidance and Management of Construction Claims – Fact or Fiction?
Construction Management At Risk Process
The Contract Management Process Contract Formation.
1 Today’s pegboard Drawings & Specd due 11/21. 2 Today’s pegboard Cirrious Tightpinch.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
University of Calgary Continuing Education
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Engineering Project Tendering.
Outsourcing: Managing Interorganizational Relations
PROJECT DELIVERY METHODS
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009

Overview 1.Introduction 2.Factors Involved in Selecting the Form of Contract 3.Running An Effective Design-Build Tender Process 4.Risk Management and the Allocation of Risk in Design-build Tenders 5.The Standard Form Design-Build Contract 6.Effective Management of Design-Build During Construction 7.Conclusion Overview 1.Introduction 2.Factors Involved in Selecting the Form of Contract 3.Running An Effective Design-Build Tender Process 4.Risk Management and the Allocation of Risk in Design-build Tenders 5.The Standard Form Design-Build Contract 6.Effective Management of Design-Build During Construction 7.Conclusion Overview 1.Introduction 2.Factors Involved in Selecting the Form of Contract 3.Running An Effective Design-Build Tender Process 4.Risk Management and the Allocation of Risk in Design-build Tenders 5.The Standard Form Design-Build Contract 6.Effective Management of Design-Build During Construction 7.Conclusion

Factors Involved in Selecting the Form of Contract –(a) Design-Bid-Build / Stipulated Price –Procedure and overview of process –Advantages Traditional and familiar structure Fixed price at tender Detailed control of design Design team impartial Competition to improve efficiency and quality

Factors Involved in Selecting the Form of Contract (contd) –(a) Design-Bid-Build / Stipulated Price –Disadvantages Extended project schedule Less conducive to teamwork Owner takes risk of design coordination

Design-Bid-Build/Stipulated Price Structure Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub-subcontractorSub-subconsultant Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub-subcontractorSub-subconsultant Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub-subcontractorSub-subconsultant Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub-subcontractorSub-subconsultant Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub-subcontractorSub-subconsultant Consultant Owner General Contractor Sub-subcontractor Subcontractor Subconsultant Sub- subcontractor Sub- subconsultant

–(b) Design-Build –Procedure and overview of process –Advantages Project speed and expedited timeline Communication and single source accountability –Reduction in the number and severity of conflicts between the design and construction entities –Possible to agree on fixed price contract for entire project –Possible advantages when negotiating project financing as project has lower risk of cost overruns once price established.

–(b) Design-Build Disadvantages Owner does not maintain direct control over design detail. Difficult to accurately price a project before design has been fully completed.

Design-Build Design-Builder Owner Subcontractor Contractor Consultant SubcontractorSubconsultant

Running An Effective Design-Build Tender Process –Principles for The Proper Use of Design- Build –Selection Process –Remuneration –Intellectual Property at the Proposal Stage –Standard contracts –Request for Proposal (RFP) Documents

–What to Include in a Design-Build Tender Proposal –Scrutinizing project details, plan to prepare deliverables –Address each specification of owner as listed on the RFP –Less is more: checklist of all required submittals, criteria, and timelines. Do not add excessive volume –Attend pre-proposal conferences and ask questions –Exhibit listing what is not included in the package of deliverables: excellent check for completeness. –Include several items that help the team stand out –High quality, visually appealing package –Owners looking for best value solution for their project

–Role of The Consultant –Owners advocate consultant –Design-builders consultant

Risk Management and the Allocation of Risk in Design-build Tenders –Significant Risk Factors –Owner Financial Risk Clarity of project definition Problems with documents Unknown site conditions Lack of Control over Design Process Lack of Control over Construction (e.g., use of materials)

Risk Management and the Allocation of Risk in Design-build Tenders (contd) –Significant Risk Factors –Design-builder Liable for overall failure of the design or any construction defects Usual construction project risks Change orders

–Strategies and Best Practices for Risk Management –Pre-contract period –Understand Canadian competitive bidding law Ron Engineering –Clarify owners expectations early –Disclose evaluation criteria in the RFP –Alternative Dispute Resolution –Select design-builder with care

–Strategies and Best Practices for Risk Management (contd) –Strong Documents –Strong Relationships (trust, reputation) –Competent construction solicitor –Assigning risks to third party: insurance and bonding

The Standard Form Design-Build Contract –Pros and Cons of Standard form contracts –Pros: Lower transaction costs Known risk allocation Faster process –Cons: Potentially inappropriate risk allocation Not project specific Key points may be missed

The Standard Form Design-Build Contract (contd) –CCDC Design-Build Stipulated Price Contract, Document 14 (2000) –Risk allocation –Analysis

Effective Management of Design- Build During Construction –Owners responsibilities –Inspection to ensure compliance with contract –Design-builders responsibilities –Project management models –Hiring and review of subcontractors –Construction Manager –Program Management