1 FLL Construction Playbook RWY 10R / 28L April 17, 2012- May 6, 2013 Phase 1 Only ~ RWY 9R Closes.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
27  9 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Bright Futures Guidelines Priorities and Screening Tables
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Presentation transcript:

1 FLL Construction Playbook RWY 10R / 28L April 17, May 6, 2013 Phase 1 Only ~ RWY 9R Closes

Phase 1 ~ April 17, 2012 to May 6, 2013 Relocated Bomb Threat (101) Run Up Area

NOTAMS & Construction Notices on the Digital NOTAM Site

Airport Construction Notices FLL Construction Notice will be published on April 17, 2012

5 FLL Airport Capacity during RWY 9R Closure 5

6 9L 9R 13 Total ADR: 36 Total AAR: 32 Total Airport Ops: 68 EAST VMC Peak Demand RWY 13 ARVL ~ RWY 9L DEPT VISUAL/RNAV VISUAL RWY 13 AAR 32 NORTH SIDE 32 0 SOUTH SIDE

7 9L 9R 13 Total ADR: 32 Total AAR: 28 Total Airport Ops: 60 EAST MVFR/IMC Peak Demand RWY 9L ARVL ~ RWY 9L/13 DEPT ILS/RNAV RWY 9L AAR 28 NORTH SIDE 28 0 SOUTH SIDE

8 9L 9R 13 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 EAST VMC/IMC 9L/27R CLOSED RWY 13 ARVL ~ RWY 13 DEPT LOC/RNAV RWY 13 AAR 0 NORTH SIDE SOUTH SIDE 24 DEPT 24 ARVL 8 H090

9 27R 27L 31 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 WEST VMC/IMC RWY 27R ARVL ~ RWY 27R DEPT VISUAL RWY 27R AAR 24 NORTH SIDE 24 0 SOUTH SIDE Arvl 24 Dept 9

10 27R 27L 31 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 WEST VMC 27R CLOSED RWY 31 ARVL ~ RWY 31 DEPT VISUAL/RNAV RWY 31 AAR 0 NORTH SIDE SOUTH SIDE Arr 24 Dep 10

11 27R 27L 31 Total ADR: 22 Total AAR: 20 Total Airport Ops: 42 WEST IMC 27R CLOSED RWY 31 ARVL ~ RWY 31 DEPT RWY 31 RNAV/GPS ONLY AAR 0 NORTH SIDE SOUTH SIDE Arr 22 Dep 11

12 FLL Approach Procedures Visual Approach 13/31 RNAV Visual 13/31 Localizer/DME RWY 13 RNAV (GPS) RWY 13 RNAV (GPS) RWY 31 12

13 LOC/DME RWY 13 13

14 RNAV(GPS) RWY 13 14

15 RNAV VA RWY 13 15

16 RNAV VA RWY 13 16

17 RNAV (GPS) RWY 31 17

18 RNAV VA RWY 31 18

19 RNAV VA RWY 31 19

20 Temporary Relocation Aircraft 101 Site = The Penalty Box & Engine Run Up Area 20

21 DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Ft. Lauderdale-Hollywood International Airport Traffic Control Tower 4150 SW 12 Terrace Ft. Lauderdale, FL LETTER TO AIRMEN NO. 20XX-XX SUBJECT: FLL - Runway 9R27L Closure FLL - Runway 13/31 Decommissioned FLL – Hot Spot Use for RWY 31 Ops ISSUED: EFFECTIVE: CANCELLATION: TBD 21

22 Contact for Support Telcons TBD Supporting Documentation User Name: forums Password: customers