West Elementary School May 16, 2006 - 100% Construction Documents.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

Kick Off WB assignment Measurement and Dimensions.
Fill in missing numbers or operations
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
East Hampton High School July 2013 – July 2014 Design Phases.
By: Walter C. Brown and Daniel P. Dorfmueller
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Carriage house expansion at the Grover Cleveland birthplace
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P-31-1 DATE: FOSS 9 & 10 – DOOR REPLACEMENT.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
-Master Bedroom w/ T & B - 2 Bedrooms - 1 Maids Quarter - 2 T & B - Living Room - Dining Room - Porch - Terrace - Carport -Standard Lot Area – 156 sqm.
KITCHEN PLANNING WORK TRIANGLE.
Floor-Plan Dimensions and Notes
INAR 342 FINISHING. INAR 342 : FINISHING Aim of the Course This course is designed to heighten the students understanding of the rules and principles.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
STRATEGIC PETROLEUM RESERVE BAYOU CHOCTAW CAVERN 20 REPLACEMENT 1.
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
6/12/ DFS ABU DHABI STAFF ACCOMODATION.
VOORBLAD.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Board Meeting – May 27,  Communication  Transportation  Maintenance  The Countdown!
© 2012 National Heart Foundation of Australia. Slide 2.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Addition 1’s to 20.
25 seconds left…...
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Test B, 100 Subtraction Facts
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Design Review Planning to date Project scope summary
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
White Pigeon Community Schools
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

West Elementary School May 16, % Construction Documents

PRIME CONSTRUCTION CONTRACTS 1.General Construction 2.SItework 3.Food Facilities Equipment 4.Mechanical Construction 5.Electrical Construction 6.Temperature Controls

ALTERNATE BIDS 1A. Schlage Locks 1B. Sargent Locks 2. Terrazzo Flooring in Main Lobby & Main Corridor 3. Terrazzo Flooring in Cafeteria 4. Wood Flooring in Gymnasium 5. Vinyl Wall Covering in Admin. Areas 6. Blue Glass & Blue Storefront frames 7. Additional Storage Cabinets Above Cubbies in Classrooms 8. Two Additional Classrooms on 2-4 Classroom Wing 9. Altro Sheet Vinyl Floor in Kitchen (Deduct) 10. Perforated, Wavy Ceiling Panels in Corridors 11. Ceramic Wall Tile in Staff Toilets 115 & 116 on wet walls 12. FRP Exterior Doors 13. Baseball & Soccer/Football Fields

COST ESTIMATE

PROJECT SCHEDULE April 25, 2006 – May 9, 2006Cost Estimate Prepared for Bid Package #2 – 95% Construction Documents May 15, 2005Construction Documents are complete May 16, 2006Board Approval of Bid Package #2 Construction Documents May 22, 2006Construction Documents available to Contractors May 31, 2006Pre-bid Meeting June 16, 2006Bids Due June 20, 2006Board Approval of Bids June 26, 2006 – July 27, 2007Construction July 30, 2007 – August 10, 2007Owner Move In

Architects Conceptual Drawings