West Elementary School May 16, % Construction Documents
PRIME CONSTRUCTION CONTRACTS 1.General Construction 2.SItework 3.Food Facilities Equipment 4.Mechanical Construction 5.Electrical Construction 6.Temperature Controls
ALTERNATE BIDS 1A. Schlage Locks 1B. Sargent Locks 2. Terrazzo Flooring in Main Lobby & Main Corridor 3. Terrazzo Flooring in Cafeteria 4. Wood Flooring in Gymnasium 5. Vinyl Wall Covering in Admin. Areas 6. Blue Glass & Blue Storefront frames 7. Additional Storage Cabinets Above Cubbies in Classrooms 8. Two Additional Classrooms on 2-4 Classroom Wing 9. Altro Sheet Vinyl Floor in Kitchen (Deduct) 10. Perforated, Wavy Ceiling Panels in Corridors 11. Ceramic Wall Tile in Staff Toilets 115 & 116 on wet walls 12. FRP Exterior Doors 13. Baseball & Soccer/Football Fields
COST ESTIMATE
PROJECT SCHEDULE April 25, 2006 – May 9, 2006Cost Estimate Prepared for Bid Package #2 – 95% Construction Documents May 15, 2005Construction Documents are complete May 16, 2006Board Approval of Bid Package #2 Construction Documents May 22, 2006Construction Documents available to Contractors May 31, 2006Pre-bid Meeting June 16, 2006Bids Due June 20, 2006Board Approval of Bids June 26, 2006 – July 27, 2007Construction July 30, 2007 – August 10, 2007Owner Move In
Architects Conceptual Drawings