9th Euroindicators Working Group

Slides:



Advertisements
Similar presentations
Filtering the data. Detrending Economic time series are a superposition of various phenomena If there exists a « business cycle », we need to insulate.
Advertisements

MPU 2010: Figure 01. Repo rate with uncertainty bands Per cent, quarterly averages Source: The Riksbank Note. The uncertainty bands for the repo.
1 Extracting the Cyclical Component from Australian Multi-Factor Productivity Mark Zhang Lewis Conn.
GDP growth and resource utilisation Saltsjöbaden 6 October 2011 First Deputy Governor Svante Öberg.
Maria Kazakova, PhD, Gaidar Institute for Economic Policy and Russian Presidential Academy of National Economy and Public Administration Decomposition.
Estimating potential output growth in the euro area Alberto Musso Directorate General Economics European Central Bank Presentation for AIECE Workshop on.
The ECB Survey of Professional Forecasters Luca Onorante European Central Bank* (updated from A. Meyler and I.Rubene) October 2009 *The views and opinions.
Estimating potential output using business survey data in a SVAR framework 3° annual WORKSHOP on Macroeconomic Forecasting Montreal 5-6 october 2007 Tatiana.
CIRANO Workshop on Macroeconomic Forecasting, Analysis and Policy with Data Revision “Research Perspectives” Sharon Kozicki Bank of Canada.
Session 5: Flash Estimates of Gross Domestic Product Introduction.
THE GOVERNMENT OF THE REPUBLIC OF SLOVENIA INSTITUTE OF MACROECONOMIC ANALYSIS AND DEVELOPMENT Iasi, 26 SEPTEMBER 2008 Forecasting macroeconomic variables.
BDO Monthly Business Trends Indices July 2010 Page 1 Current Confidence Index BDO Output Index BDO Optimism Index Movement in Month BDO Inflation Index.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
Wiener Institut für Internationale Wirtschaftsvergleiche The Vienna Institute for International Economic Studies Employment, Education and.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
National Institute of Economic and Social Research The Euro-area recession and nowcasting GDP growth using statistical models Gian Luigi Mazzi (Eurostat),
BDO Euro Area Quarterly Business Trends Indices July 2010 Page 1 Current Confidence Index BDO Output Index BDO Optimism Index Movement in Month BDO Inflation.
Federal Planning Bureau Economic analyses and forecasts Increasing uncertainties? A post-mortem on the Federal Planning Bureau’s medium-term.
17 October 2010 The Information Content of Capacity Utilisation Rates for Output Gap Estimates Michael Graff and Jan-Egbert Sturm.
9 th Euroindicators Working Group Luxembourg, 4 th & 5 th December 2006 Eurostat - Unit D1 Key Indicators for European Policies.
BDO Monthly Business Trends Indices November 2010 Page 1 Current Confidence Index BDO Output Index BDO Optimism Index Movement in Month BDO Inflation Index.
Euro-Indicators Working Group MEASURING OUTPUT GAP IN LITHUANIA 1997–2007 Jurga Rukšėnaitė Chief Specialist, Methodology and.
United Nations Statistics Division Overview of handbook on rapid estimates Expert Group Meeting on Short-Term Economic Statistics in Western Asia
Eurostat – Unit D1 Key indicators for the European policies Euro-indicators Working Group Luxembourg, 4 th & 5 th December 2008.
Federal Planning Bureau Economic analyses and forecasts Economic budget 2008 Evaluation of risks and uncertainties.
European Commission Directorate General for Economic and Financial Affairs The harmonised EU investment survey: What can it tell us about investment growth.
Discussion: Timely estimates of economic indicators – Session C3 –
Potential GDP, resource utilisation and monetary policy Grand Hotel, Saltsjöbaden 7 October 2010 First Deputy Governor of the Riksbank Svante Öberg.
Herman Smith United Nations Statistics Division
Business Demography Indicators for the euro area
Xiaoshan Chen PhD Candidate Loughborough University
Shohreh Mirzaei Yeganeh United Nations Industrial Development
Monetary Policy Update December 2011
Presentation by Eurostat
Item 5а National Accounts of Ukraine: Current Status and Development Perspectives Irina N. Nikitina Director of Macroeconomic Statistics Workshop on the.
Five steps in a forecasting task
4th Joint EU-OECD Workshop on BCS, Brussels, October 12-13
Revision Analysis for General Economic Statistics
Estimation of Flash GDP at T+30 days for EU28 and EA18/EA19
GDP growth estimates for Europe at 30 days
Quality assessment criteria
Macroeconomic heatmap taking the temperature of the Estonian economy
Estimation of Flash GDP at T+30 days for EU28 and EA18/EA19
Euro-indicators Working Group
The European Statistical System
GDP growth estimates for Europe at 30 days
Quarterly GDP at t+30 days for EU and euro area
Euro-indicators Working Group
Methods and estimation techniques of euro area GDP flash at T+30 days: preliminary reflections Filippo Moauro ISTAT - Direzione centrale di Contabilità.
Doc A6465/17/02, /02a and /02b Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2016 Working Group on Articles A64 and A65 of the Staff.
Arto Kokkinen ESTAT, unit C.2
Ag. No Transparency Consultation
Quarterly National Accounts - Orientation
United Nations Statistics Division
Presentation of the project 'Employment flash estimates'
Suite of models approach and uncertainty ranges
The European Statistical Training Programme (ESTP) European Statistical week, a study visit to Eurostat Tim ALLEN Eurostat Press Office Luxembourg,
Euro-indicators Working Group
PPU December
Task Force on GDP Flash estimates at t+30 days
European Central Bank – DG Statistics
MPU December
House Price Indices Laurs Nørlund Director – National Accounts, Prices and Key Indicators Eurostat - European Commission.
MPU September
Wage formation and monetary policy
Structural Approach Potential output - part I
Model Selection, Seasonal Adjustment, Analyzing Results
Guy Van Gyes CAWIE-meeting 23-24/01/2012
Meeting Of The European Directors of Social Statistics
Presentation transcript:

9th Euroindicators Working Group Luxembourg, 4th & 5th December 2006 Eurostat - Unit D1 Key Indicators for European Policies

Alternative trend-cycle decompositions Item VI - 5 of the Agenda Alternative trend-cycle decompositions By Martin Weale Doc 190 / 06 National Institute of Economic and Social Research

Purposes To produce trend and cycle estimates for the Euro Area and to make them available on a continuing basis. Production started in October 2006 Consider Industrial Production, quarterly GDP and quarterly employment The estimates are produced five days after the relevant official data appear.

Techniques Three methods are used Unobserved components (Harvey-Trimbur) Christiano-Fitzgerald Filter Hodrick-Prescott Filter These are bound to give different results and the divergence between them may be a useful heuristic guide to the problem of identifying the trend and cycle. We have not used multivariate methods for estimating the cycle (but inflation may provide information on the output trend and cycle)

Real time Problems Estimates produced at any point in time depend on future data as well as past data. The estimates of the cycle depend on the forecasts and therefore on the method used to forecast the data. Since forecasts are uncertain the estimates of the trend associated with any particular method are also uncertain. Orphanides and van Norden have suggested that revisions to estimates are of similar magnitude to the estimates of the cycle themselves

Uncertainty (i) Like any good data estimates of the cycle should have error margins associated with them. The unobserved components model can conveniently be used to produce estimates of error margins associated with forecasts. Stochastic simulation allows us to produce error margins for the estimates of the cycle at any point in time.

Latest estimates for EU25 Industrial Production

Latest estimates for EU25 Employment

Latest estimates for EU25 GDP

Descriptive Statistics: the Industrial Production Cycle, 1990-2006

Uncertainty (ii) We illustrate this using industrial production because the sample period is longer than for the other variables. Estimate the cycle over the period 1990m1-2000m1 Produce an estimate of the state of the cycle in 2000m1. Re-estimate recursively for each month up to 2006m8 We use only the final data vintage.

Uncertainty bands for EU25 Industrial Production (UC)

Simulated real-time versus “final” cycles for EU25 IP(UC)

Summary Real-Time Performance Statistics Harvey-Trimbur Estimates