About us Motorways of Federation of B&H Ltd Mostar is 100% owned by the Government of Federation of B&H Motorways of FB&H is responsible for managing,

Slides:



Advertisements
Similar presentations
2008 Pan-European Private Equity & Venture Capital Activity EVCA, The Voice of European Private Equity Industry since 1983.
Advertisements

1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
The Baltic States: Recovery, Outlook, and Challenges Economic Crossroads: From Recovery to Sustainable Development in the Baltic States and the EU Riga,
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION EN 1 Transport and Regional Policy Transport and Regional Policy Patrick.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
0 - 0.
1 1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
ZMQS ZMQS
Credit Card Understanding Your Credit Card Credit Cards 101 Trivia.
First-time Home Buyer Savings Accounts MontGuide Revised December
Break Time Remaining 10:00.
City of North Liberty North Liberty Area Development Corporation University of Iowa Community Credit Union Economic Development Partnership Project October.
Monetary Policy Tools 1 Monetary Policy Changes in Monetary Policy Tools in order to affect Aggregate Expenditures Increase AE Decrease AE 2.
PP Test Review Sections 6-1 to 6-6
British Columbia and International Trade Agreement Negotiations October 30, 2013 Janel Quiring, Director International Trade Policy Unit Ministry of International.
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Insert the title of your presentation here Presented by Name Here Job Title - Date A reduction in fatal casualties Who, why and what does this mean? Louise.
The Oil Majors and the US Geo- Strategy in Eurasia after the End of Cold War Anthony Livanios CEO Energy Stream CMG GmbH January 21, 2014.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
The Longevity Economy The Emerging Market in Plain Sight.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MOTION. 01. When an object’s distance from another object is changing, it is in ___.
1 Impact Assessment. 2 Demographics 3 Sex and Age.
Jodhpur Discom PRESENTATION Sr. OFFICERS MEETIN DATED
1 Jodhpur Discom. 2 AG,DL & BPL CONNECTIONS Status of AG. DN deposited & connections Released ( ) 3.
Properties of Exponents
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Test B, 100 Subtraction Facts
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Analyzing Genes and Genomes
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
FEDERAL STUDENT AID AND COMMUNITY COLLEGE STUDENTS Sandy Baum George Washington University Graduate School of Education and The Urban Institute North Carolina.
Thessaloniki, 4 October 2010 Key elements of the Hungarian Student Loan Scheme.
Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.
Presentation transcript:

About us Motorways of Federation of B&H Ltd Mostar is 100% owned by the Government of Federation of B&H Motorways of FB&H is responsible for managing, construction, reconstruction, maintenance and protection of motorways and express roads Current objective: Construction of motorways and express roads in Federation of B&H with a special focus on environment and traffic safety

Development strategy of Corridor Vc and express roads

Corridor Vc Project description Corridor connecting Trans - European countries Kiev - Budapest to the Adriatic Sea Total length of 330 km 285 km of motorway passing through Federation of B&H

Current status of Corridor Vc Project 47 kilometers of motorway constructed until year 2012; Construction of additional 54 kilometers is in progress and completion of these works is planned in year 2014; Completion of construction of 101 km planned in year 2014 considered as leverage for future projects

Construction plan for Corridor Vc Constructed until 2012 Constructed until 2012 Jošanica – Kakanj 47 km Jošanica – Kakanj 47 km In Construction (36 km) In Construction (36 km) Bilješevo – Drivuša 6 km Bilješevo – Drivuša 6 km Bijača – Zvirovići 10km Bijača – Zvirovići 10km Tarčin – Vlakovo 20km Tarčin – Vlakovo 20km Construction planned for 2013 (18km) Construction planned for 2013 (18km) Svilaj – Odžak 11km Svilaj – Odžak 11km Butila – Vlakovo 4 km Butila – Vlakovo 4 km Drivuša – Klopče 3 km Drivuša – Klopče 3 km PPP project / concession / project partnership PPP project / concession / project partnership IFCs Transaction Advisory Service (38 km) IFCs Transaction Advisory Service (38 km)

Finance resources Our finance resources are as follows: Public revenues Toll collection (10 million per year) Tax on fuel in the amount of 5 euro cents per liter (35 million per year) Credit loans PPP / concession / project partnership - option for future constructions

EIB & EBRD credit loans and Kuwait fund Motorways of Federation of B&H Ltd Mostar has received credit loans intended to finance current construction: European Investment Bank (EIB) 75 million (grace period = 6 years) 166 million (grace period = 4 years) European Bank for Reconstruction and Development (EBRD) 180 million (grace period = 5 years) Kuwait Fund for Arabic Economic Development 30 million (grace period = 5 years) For all above-listed loans interest rate amounts cca 2% and repayment period ranges from years

Project advantages Implementation of closed toll collection system (subsection Kakanj – Jošanica 37 km): generated traffic of vehicles in the period from until Number of vehicles per day: Internal rate of return (IRR) of Project = 13.19%* Project is considered to be feasible from a general society standpoint * Data from Feasibility Study 2006

Conclusion The significance of Construction project Corridor Vc reflects on the traffic connection to the international traffic has an impact on the increase of GDP (increase of the employment, increase of the construction sector etc.) Current finance resources are not sufficient to complete the whole construction of Corridor Vc, thus additional finance resources will be provided by additional credit loans or increasing the tax on fuel or other financing model and construction (PPP)

Contacts Office in Mostar: Ul. Braće Fejića b.b Tel: Fax: Office in Sarajevo: Ul. Dubrovačka br. 6 Tel: Fax: Thank you for your attention!!!