Special Inspections

Slides:



Advertisements
Similar presentations
Why Is Special Inspection Good For Us?
Advertisements

PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Marcy Mealy Procurement Specialist CDBG Program
Boston Survivor Accessibility Alliance (BSAA) Construction Program Flow Chart & Procedures.
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Construction Engineering 221 Drawings and Specifications.
Overview Residential Services Housing Inspections Supports Intensity Scale Questions.
WORKSHOP DCA MODULAR BUILDING PROGRAM
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
THE PROFESSIONAL APPRAISER Chapter 18. Appraisal licensing and certification Competency Rule Conduct Designations Ethics Rule Experience Federally related.
Regulation 16B As referenced in Approved Document B 2006.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
The Importance of the Qualifications Based Selection (QBS) Process
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Planning an Audit The Audit Process consists of the following phases:
Governmental Constraints on Construction Chapter 2.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
A CONSTRUCTION QUALITY ASSURANCE MECHANISM FOR GRENADA By Consulting Engineers Partnership Ltd.
Specification & Quantities Estimating
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
CVE 4070 Construction Engineering Shop Drawings Quality Control
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Agency Construction Management :CM NOT AT-RISK
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Tax & Business Licenses: A Case for City Business Licensing Prepared for GFOA – February 2016 Business and Financial Decisions.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Marketing Special Inspection Services C ouncil of A merican S tructural E ngineers “... improving the quality of structural engineering through improved.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
Special Inspections Who, What, When and Where. To prepare for this presentation, I sent a survey out to attendees and clients. I wanted to show the audience.
Chapter 8 Construction. Groundbreaking Before the construction begins, a ceremony is often held to recognize the official start of the project. This step,
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Global Connections Day Building Safety Service Provider
Who is ICC? Private, Non-profit public benefit corporation:
Who is Liable for a Construction Accident?
Punch list / Close Out - Project Completion
Leo Associates Services
Partners in Building Safety
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Department of Environmental Quality
City Council Meeting August 27, 2018
Construction Management Services April 16, 2018
Fiber Reinforced Polymer Systems
Presentation transcript:

Special Inspections

What do YOU need to take away from this? What code defines Special Inspections? What is the History & evolution of Special Inspections? What specifically are Special Inspections & which projects must have them? Who does them and who pays for them? What is the proper process for Special Inspections? Overview Objectives

Chapter 17 – 2009 International Building Code (IBC) Code that defines Special Inspections

Special Inspections have been in the code since BOCA (93*) o Prior to 2000 and the state adoption of the IBC, most municipalities did their own plan review and inspections. In house inspectors may not have been familiar with, or just may not have enforced, special inspections. o Now, many municipalities hire third party organizations to review plans More familiar with requirement and now enforce them. Do not want liability. History and Evolution of Special Inspections

Per IBC o Inspection… of the materials, installation, fabrication, erection or placement of components and connections requiring special expertise to ensure compliance with approved construction documents and referenced standards. Laymens terms o Anything that, if not installed properly, could cause loss of life due to a building collapse during a weather event (natural disaster) or fire. Special Inspections are…

Structural Inspections Soils Concrete and Reinforcing Steel Masonry Timber Fireproofing Special Inspections are…

ALL commercial building projects with STRUCTURAL COMPONENTS! Projects that MUST have Special Inspections

Per IBC – When application is made for construction as described in this section… o EXCEPTIONS: ….work of a minor nature as defined by the local building official. ….not required for building components unless the design involves the practice of professional engineering or architecture as defined by state statutes. ….Group U occupancies that are accessory to a residential occupancy. Projects that MUST have Special Inspections

Per IBC – When application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owners agent shall employ one or more approved agencies to perform inspections… Responsibilities WHO DOES THEM? WHO PAYS FOR THEM? Owner Architect Structural E.O.R.

Per IBC – …The registered design professional in responsible charge and engineers of record in the design of the project are permitted to act as the approved agency and their personnel are permitted to act as the special inspector for the work designed by them, provided those personnel meet the qualification requirements of this section to the satisfaction of the building official. Who PERFORMS Special Inspections?

Conflict of Interest??? Is there any conflict of interest with the design professional acting as the special inspector? No – Who has more of a vested interest in the building being built properly than the EOR?

Per IBC 1705 o INDEPENDENCE – …objective, competent and independent from the contractor responsible for the work being inspected. o EQUIPMENT – …have adequate equipment to perform the required tests. o PERSONNEL – …shall employ experienced personnel educated in conducting, supervising and evaluating tests and/or inspections. Approved Agency

Barry Isett & Associates is an APPROVED Special Inspection agency! Based on the International Building Code…

So your project needs Special Inspections. Where do they fit into the process?

The Process Design Team completes Construction Documents and issues for Permit Drawings Engineer of Record prepares Schedule of Special Inspections as part of Permit Set Owner (or Owners Agent) engages an Approved Agency PRIOR to beginning of construction Approved Agency submits regular reports to building official and EOR At the completion of construction Approved Agency compiles all reports and submits a final report. A certificate of occupancy will not be given without the final report being submitted!!!

Special Inspections are to be paid by the Owner, or the registered design professional acting on the Owners behalf. When preparing budgets for Owners, Special Inspections can have substantially higher costs than typical inspections. Schedule of Special Inspections prepared by the Engineer of Record must be submitted as part of the building permit application. Final Special Inspection Report must be submitted prior to a project being given a Certificate of Occupancy. Summary Review Special Inspections are required for all commercial construction projects* that involve structure or structural components. The engineer of record is permitted to act as the special inspector provided they can provide adequate qualification to the building official.

Barry Isett & Associates is an Approved Special Inspection agency!