Construction of the new Kaiserschleuse lock in Bremerhaven

Slides:



Advertisements
Similar presentations
FACILITIES. GENERAL OVERVIEW OF PRODUCTION FACILITY m 2 Covered storage Area m m 2 5 Rolling lines m m 2 Fabrication.
Advertisements

Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Concession Agreement Tirana International Airport Nene Tereza
2 nd Annual Dredged Material Management Summit Minimizing Sedimentation In Harbors and Marinas 6 October, 2005 Minimization Of Sedimentation In Harbors.
1 Heinrich Müller Maschinenfabrik GmbH HMP Umformtechnik GmbH 1 Heinrich Müller Maschinenfabrik GmbH HMP Umformtechnik GmbH Process forming.
Operadores de Contentores S.A.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
The versatile solution for efficient dredging and water construction.
By: Walter C. Brown and Daniel P. Dorfmueller
Grade Separation Alternative
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
Tower Crane Safety Regulations
TRADITION, POWER QUALITY , INNOVATION
PERFORMANCE One important issue in networking is the performance of the networkhow good is it? We discuss quality of service, an overall measurement.
Break Time Remaining 10:00.
Introduction foundation Machine F5000
Introduction to composite construction of buildings
Company Presentation.
Rien Visser, Virginia Tech
«SOUTHEAST EUROPEAN INTERMODALITY»
Information from the R&D and Product Management Team Product launch QFG II
Welcome to EUROLUM GmbH Product Information Eurolum GmbH | Kirschallee. 90 | Potsdam | Tel. +49 (0) 331/ | Fax. +49 (0) 331/
Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan.
SITOP power facets A&D SE PS SITOP power Automation and Drives SITOP power flexi The power pack handles it all - from 3 to 52V SITOP power.
web notes: lect3.ppt buoyancy.pdf surface.pdf.
lect3.ppt.
Chapter 1 Chemistry and You
Plain & Reinforced Concrete-1 CE3601
Ladle Gate Type LS. Casting with the Ladle Gate LS.
11 Heinrich Müller Maschinenfabrik GmbH HMP Umformtechnik GmbH Process forming cylinder with concentric mandrel device 2segment chuck 3forming.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Clock will move after 1 minute
Customer Service – International dept. STAR 24 3 E.
Select a time to count down from the clock above
Range name: alifter Range code: TMA T Magnetic M Close-coupled A Self-priming (Alifter range) Name of the model: nominal Capacity (m 3 /h) 16.
Erected and ready for use within 5 minutes of arriving on site Simply wind to a maximum working height of 6.5m (21ft) No specific training qualifications.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Name of Seminar Prof.Dr.Ing. Volker Bertram
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Henning Roedel Civil and Environmental Engineering Department Stanford University November 25, 2008.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
MKT May 2012 C850: Fast sliding gate operator. MKT May 2012 Summary  Why a fast slider operator?  USPs  Applications  Details  Technical specifications.
Industrial Statistics of Lifts and Escalators Ebru Gemici-Loukas, VDMA ASANSÖR, Istanbul 05. April 2013.
Savaria Residential Elevators Crown Park Single Family Homes (Across from the RIO) By: FF3/PM Michael J. Haggerty, 32A.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
EWEC 2006, Athens1Jan Rispens Wind Energy Agency Bremerhaven/Bremen (Bild: Enron Wind) The WAB Industry Network in Northwest-Germany Profile and R&D-Activities.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Safety–Training Media Dev Death of the Victim Hit by a Dumb Waiter (Food Lift) on the Head Grave Accident Case in Manufacture Sector 2010-
Supporting pin at boom of a Con ’ c pump car broken to hit the victim (Serious Accidents in Construction) Construction The copyright to this material.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
An idea for the future of logistics...
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
- How to place an order for standard products -
New Line 5000 Dryers Dryer T5290 – T5550 – T5675
FCC Civil Engineering update
PIANC Work Group SMART Rivers 2017
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
CMS Gantry for Detector Lowering
Sioned Evans Jim Poole Keith Williams
February 2019.
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Monkey Tower Scaffolding in 5 minutes
The Paterson Redevelopment
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

Construction of the new Kaiserschleuse lock in Bremerhaven Dipl.-Ing. Christoph Tarras

Overseas harbours Container terminal Harbours Bremerhaven (detail) Nordschleuse lock Kaiserschleuse lock Container terminal Overseas harbours Germany

Built in 1897, one of the largest locks in the world Kaiserschleuse lock in Bremerhaven Built in 1897, one of the largest locks in the world Length of lock chamber: 215 m Width of lock chamber 45 m Clear passage width at the heads 28 m Sill depth = MSL – 8.95 m Obsolete technology

Car carrier dimensions Modern car carriers are up to 240 m long, > 32 m wide and have draughts of up to 11 m Design studies, e.g. by shipping company Wallenius-Wilhelmsen already envisage vessels with a width of up to 50 m ≥ 10.000 cars © 2007 Wallenius Wilhelmsen Logistics

Existing locks Nordschleuse lock Kaiserschleuse lock 45m 350m 215m 28m

Short Sea Carrier (SSC) Harbour access options Short Sea Carrier (SSC) Deep Sea Carrier (DSC) Future Carrier Kaiser- schleuse Nord- schleuse Kaiser- schleuse Nord- schleuse Kaiser- schleuse Nord- schleuse

2 N

Dimensions at new lock heads Length = 305 m + 90 m (215 m) Width = 55 m + 10 m / 27 m (45 m / 28 m) Sill depth = -13 mNN + 4,05 m (-8,95 m)

General construction conditions Construction on existing site: - Designed to keep effects to a minimum Construction while operations continue : - Existing lock continued to operate till end of 2007 - Then decommissioned completely for 28 months Construction under tidal conditions: - Use of a jack-up platform Maintaining storm tide protection: - Careful planning of the individual construction phases

Construction phases - guideline W e s e r R i v e r W e s e r Tugboat harbour Eastmole Outer harbour Lohmanndyke Outer lock head Lock chamber Inner lock head

Construction phase I (April 07 – June 08) Preliminary work: demolish above-ground structure, site installation, relocate Lohmanndyke Gate chamber outer + inner lock head: assembly of foundation pit Preliminary dredging of tugboat harbour, produce new eastern mole Kaiserharbour: partial demolition of existing quay wall, produce new sheet pile wall Lock chamber: dismantle inner head of old lock, sheet piling, new chamber walls Outer harbour: install eastern wall of outer harbour, dismantle old eastern quay

Construction phase II (July 08 – June 09) General: production of outer areas begins, carcass construction of building at outer head Gate chamber outer + inner lock head: production of foundation slab and chamber walls Completion of tugboat harbour Gate fittings and sill, outer and inner head: production of foundation pit, foundation slab and wall Lock chamber: dismantle outer head of old lock and complete new structure Outer harbour: produce new west wall for outer harbour, complete remaining work for eastern wall

Construction phase III (July 09 – April 11) General: production of outer facilities, roads and canals Gate chamber outer head: production of operating building and installation of lifting-sliding gate Gate chamber inner head: production of machine house and installation of lifting-sliding gate Production of road crossings at outer and inner heads Lock chamber, outer harbour and Kaiserharbour: dredging work Overall inauguration of the new lock!

Principle of lifting sliding gate upper gate section gate lowered upper gate section raised filling opening gate stop pillar gate chamber The average time required to fill or empty the lock chamber, assuming an average difference in water levels of 2.0 m, is just 10 minutes direction of gate movement sill

Principle of lifting sliding gate Lifting sliding gate closed – lifting slab is lowered

Principle of lifting sliding gate It takes approx. 2 min. to raise or lower the upper gate section Gate and lifting slab are raised

Principle of lifting sliding gate Sliding gate open – lifting slab raised

Principle of lifting sliding gate lifting cylinder locking device guide elements supporting structure 15,4 m 0,7 m 5,6 m - 4 cylinders per gate - 4090 mm length when retracted - 800 mm construction lift - 8 MN max. load per cylinder 9,5 m Overview of lifting system – upper section raised

Gate drive system (cable drive) Cable drum with transmission and motor unit main electric motor 110 kW transmission cable drum connecting shaft emergency motor (7.5 kW) Cable drive with drive crossbar and deflection pulley with cable tensioning device (hydraulic) transmission

Inauguration of the new lock on the 29th of April 2011 The new Kaiserschleuse lock Contractor: Kaiserschleuse consortium HOCHTIEF Construction AG / Aug. Prien Bauunternehmung GmbH & Co. KG / STRABAG AG Project volume: EUR 233 million € Inauguration of the new lock on the 29th of April 2011

Dipl.-Ing. Christoph Tarras Thank you for your attention! Dipl.-Ing. Christoph Tarras Project manager New Kaiserschleuse lock www.Kaiserschleuse.de