East Parking Garage Project (Executive Leadership Council) January 31, 2011.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
UNITED NATIONS Shipment Details Report – January 2006.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
ABC Technology Project
2 |SharePoint Saturday New York City
Green Eggs and Ham.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
SIMOCODE-DP Software.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
: 3 00.
5 minutes.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Intracellular Compartments and Transport
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Science Research Laboratories (formerly PSL and LSL) 23,111 GSF $24 million Total Project Cost (PUF and RFS) November 2010 Completion 1.
Presentation transcript:

East Parking Garage Project (Executive Leadership Council) January 31, 2011

Program 1200 Car Garage Two (2) Coffee Kiosks: One (1) each at Ground Level and Level One Spirit Shop Parking Office Covered Walkway along West Façade Bridge at Level One connecting to the Main Building Visitor Center Alumni Programs Office of Communications 1

2

3

4

5

6

Schedule MilestoneDate Notice to Proceed March 1, 2011 Substantial Completion June 29, 2012 Operational Occupancy August 1,

03/11: Notice to proceed with construction issued John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. 8

03/11: North portion of Parking Lot 4 is closed for construction staging area 9 Construction Staging Area John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Staging Area

03/11: Road to provide construction access to project site is constructed Access to Lot 4 will be opened from the south 10 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South

05/11: An additional portion of Parking Lot 4 is closed through 08/11 for parking lot modifications 11 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South Parking Lot Modifications

06/11: Peace Boulevard is closed to the Main Building for utilities work through 07/11 12 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South Parking Lot Modifications Utility Work

08/11: Peace Boulevard is reopened to the Main Building 13 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Parking Lot Modifications Construction Access Road Construction Staging Area Access from South

09/11: Portion of Parking Lot 4 adjacent to the Main Building is reopened 14 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South

12/11 (?): Portion of Parking Lot 4 adjacent to the Main Building is closed to construct bridge to the Main Building 15 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South Bridge Construction

01/12 (?): Portion of Parking Lot 4 adjacent to the Main Building is reopened 16 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Construction Access Road Construction Staging Area Access from South

08/12: Garage and Campus Loop Road complete Garage, Parking Lot 4 and Campus Loop Road are operational. 17 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd. Campus Loop Road Parking Lot 4

Supporting Projects

18

19

During Construction Green = Reserved Spaces Gray = F/S A Spaces Yellow = F/S B Spaces Orange = Commuter Spaces Blue = Disabled Spaces 20

Overview of Changes Business Affairs: Your Partner for Successful Solutions Space TypeNet Reserved+18 F/S A+4 F/S B-96 Disabled-2 Commuter

Tree Loss20 or greater diameter Live Oak or Elm Good specimen small species trees

Future Project

Modified Master Plan Long Range Vision showing Roundabout 22

John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Modified Master Plan Long Range Vision Detail showing Roundabout 23

03/13 (?): North portions of Peace Boulevard and Parking Lot 3 are removed 24 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace Peace Blvd.

04/13 (?): Roundabout construction begins 25 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace

08/13 (?): Segments of Tobin Ave./Campus Loop Road are removed 26 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace

08/13 (?): Roundabout is operational 27 John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Peace

John Peace Library North Garage Business Building Main Building Humanities & Social Sciences North Paseo East Garage Tobin Ave Modified Master Plan Long Range Vision showing Roundabout 28