West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Seattle Design Commission Update.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

US 491 South Corridor FLH-666-1(49)17 CN 2357 Navajo 9 to Sheep Springs (NM 134) MP 15 to MP 46 Public Information Meeting November 1, 2006.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
1 Presentation to the Information Technology Commission December 2, 2009 Department of Information Technology PCC November 2009 Certifications Agenda Item.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
St. Croix River Crossing Project Public Information Meeting
Great Western Corridor Feasibility Study
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CEM-512 Value Engineering Highway Project: South Interchange.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making.
Public Open House February 6, Study Overview - Study Area South North.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
May 7 th, Purpose and Scope of Project Project History Project Elements Next Steps.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
West Union, Iowa - Green Project. West Union, Iowa – Porous Paver 6 blocks of porous pavement 36,000 sq. ft. rain gardens.
Mesa & Cincinnati Presentation to City Council June 19, 2007.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Pedestrian OC Does Not Cross Amador St 1 Safety Issues Riverside Elementary School Amador St.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
SESSION: SUSTAINABILITY & METRICS DDOT: Road to Sustainability and Resilient Infrastructure Lezlie Rupert, DDOT The presentation will address the policies.
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Grand Canalscape Phase I and II General Update October 30, 2015.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Capital Improvements Program (CIP) Council Workshop January 29, 2008 Council Chambers 6:00 p.m.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Arizona Forward Update
Marina Vista Streetscape Project
Bill Good Chief Operations Officer
Technical and Public Advisory Committee Meeting #3
Campus Construction Projects
Transportation Alternatives (TA) Set-aside
Highway 169 Bridge Replacement & Pavement Resurfacing
Motor Row Streetscapes
“The North Crossing” Accessible Connection from Rideau Heights to Kingscourt and the Downtown.
White Flint North Entrance Feasibility Study
I Street Bridge Replacement Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Seattle Design Commission Update – October 15, 2009

West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Summary of Seattle Design Commission December 2004 Suggestion to span over Elliott Ave and/or improve Elliott Ave crossing Design bridge to be simple, minimal, and harmonious and complimentary July 2006 Support the extended scope to include extending overpass across Elliott Support simplicity of ramps and pursuit of design elegance Design treatments, especially throw fence December 2006 Addition of stairways Consider ramp to touch down on W. Harrison St. Curved alignment for the bridge January 2008 Re-evaluate design to consider natural setting Concerns related to the Elliott crossing, pedestrian improvements versus overpass Phasing of the project due to funding February 2008 Inclusion of stairs at Elliott Ave. Inclusion of belvedere at Park and West Thomas triangle Functional but considers safety of users. Use of green technology and compliment Park setting

West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS

West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Project Status Evaluate Project Funding Conducted Value Engineering study to re-evaluate design Streamlining architectural enhancements Re-evaluate current scope Minimize special fabrication Use of standard steel sections Consider future maintenance costs Consider color scheme Shorten structure ADA compliance Future expansion Pedestrian improvements at Elliott Ave Phased construction Construction of intermediate access points Build structure over railroad, future expansion over Elliott Ave Consider future maintenance costs Consider color scheme

West Thomas Street Pedestrian Overpass Project Update October 2009 W EST T HOMAS S TREET P EDESTRIAN AND B ICYCLE O VERPASS Design Moving Forward Maintain alignment Use of surface mounted pedestrian luminaries and consider accent lighting fixtures Maintain belvederes and design structure for future intermediate access Maintained a simple and minimal design using smooth tube sections ~10 Incorporate art enhancements based upon Potlatch Trail art concepts (SDC 2002) Goal to provide access and preserve natural setting Complete design expeditiously and as efficiently as possible Continue seeking alternative funding sources