Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
0 - 0.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
07/30/ ODE, Office for Child Nutrition Completing Commodity Orders.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Break Time Remaining 10:00.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1 DELAYED LAST STATE AID - BORROWING PROCESS
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
Woodbridge High School Woodbridge School District Schematic Design for Woodbridge High School 17 January 2012.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012

Woodbridge High School Site Plan Concept A

Woodbridge High School DD Plan Ground FloorGround Floor Design Development

Woodbridge High School DD Plan Second FloorSecond Floor Design Development

Woodbridge High School The following series of images are intended to indicate the level of detail associated with current Design Development plans. We have only presented a small portion of the design sheets. Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School The project is being designed using Building Information Modeling – BIM Considered next generation of Auto-CadConsidered next generation of Auto-Cad 3D virtual building – allows clash detection of trades on paper prior to construction3D virtual building – allows clash detection of trades on paper prior to construction Clash detection resolution prior to construction reduces potential for change- ordersClash detection resolution prior to construction reduces potential for change- orders Design Development

becomes The following series of images show some of the detail associated with BIM – virtual 3D designs Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Design Development

Woodbridge High School Woodbridge School District Project Cost Summary – up-dated Building Construction Costs $ 46,597,632 Design & Consulting Fees $ 2,659,269 State, County, Local & Agency Fees $ 1,155,895 FF&E & Technology Equipment $ 1,970,000 Subtotal $ 52,382,795 Total Project Costs $ 52,382,795 Woodbridge School District Budget $ 52,539,700 Total Amount Under / (Over) Budget $ 156,905 Proposed Add Alternates $ 3,000,000 May 22, 2012

Woodbridge High School Woodbridge School District Project Schedule Space programming09/22/11 – 11/16/11 Schematic Designs (30%)11/11/11 – 01/17/12 Design Development (60%)12/19/11 – 04/23/12 Construction Documents03/22/12 – 08/23/12 Bid Pack A (Site Concrete & Steel)8/20/12 Bid Pack B (Building & Systems)10/03/12 Funding available $10.5 m 10/2011 (FY-12) Funding available$21.0 m 10/2012 (FY-13) Funding available$21.0 m 10/2013 (FY-14) 3/29/12 On sched. On Schedule 12/11

Woodbridge High School Recommend the Woodbridge Board of Education approve for continued design progression, the design development documents, budget and schedule Thank you! Questions and Answers