Packaged HVAC Equipment

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Unit C: Agricultural Power Systems
World Health Organization
ACTIVE LEARNING PROCESS
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Heating, Ventilation, and Air-Conditioning (HVAC) Systems
Chapter 3. HVAC Delivery Systems
Enrollment No Enrollment No Enrollment No Enrollment No Enrollment No UNIVERSAL COLLEGE.
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
BUILDING AIR CONDITIONING
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
Energy Efficient Heating Ventilating and Air Conditioning.
HVAC523 Heat Sources.
Heating, Ventilating, and Air-Conditioning
Trane Voyager™ rooftop units
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
eQuest Quick Energy Simulation Tool
CON 4003 Construction Estimating Prof R. V. Locurcio.
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
TYPES OF MECHANICAL SYSTEMS
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
Engineered Products Make-Up Air for Heating and Cooling.
Engineer Presentation
Condensation Piping and Installation Drain Pans
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Equipment Installation, piping & wiring Variable Water Flow System.
AIR CONDITIONING (COOLING)
Car Air condition cycle Presentation Car Air condition cycle Presentation Present to / Pro. Dr. Saad Abd El hamid.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Important variables Water: Air: Conversion:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Air Handler Terminology
Heating Systems.
Air Handler Terminology
N O R T H A M E R I C A C O M M E R C I A L TDP
Aztec Sensible Cooling System  Series ASC 1A01  Indirect Cooler –No direct contact of water into the supply air –Stainless steel cooling tower –Fill.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
Facilities Management and Design Chapter 7 HVAC Systems.
HEATING AND COOLING SYSTEMS
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
AIR CONDITIONING (COOLING)
HVAC Energy Efficiency using Mass Flow and Building Pressurization Jay Richardson Professional Supply, Inc.
Chapter 32 Heating, Ventilation, and Air Conditioning.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Automotive Heating And Air Conditioning
Maria’s Restaurant Chapter 2 Section 6
Technology in Architecture
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
BUILDING HEATING AND COOLING
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
Types of HVAC Technology Used in Business Establishments
Heating, Ventilating, and Air-Conditioning
Engineering Presentation
FBE03: Building Construction & Science
Dunham Bush Air Cooled Package
Presentation transcript:

Packaged HVAC Equipment

Packaged HVAC Equipment Is the most common source for HVAC in small to medium commercial buildings Used in: Retail Stores Supermarkets Restaurants

Packaged HVAC Equipment Rooftop units, better known as RTUs, are popular because they are the "least cost solution" to heating, ventilating, and air conditioning a building.

Rooftop Units Some of the reasons for this are: RTUs are unitary or packaged equipment and require no field refrigerant piping. RTUs provide heating, cooling, air moving, outside air introduction, and a filtration system. RTUs do not take up valuable floor space. RTU service time is reduced because all of the components are together. Routine service does not interfere with store operation. RTU replacement is quicker and doesn't interfere with store operation.

Types of Rooftop Units: Multi-zone VAV (Variable Air Volume) Constant Volume

Multi-zone These systems are still available but are losing favor because of their inherent energy inefficiency. A multi-zone unit typically consists of a hot and a cold deck. There are also three deck units, the third being the bypass deck. This is more efficient because you add hot or cold air to the return air. Some additional disadvantages are: You are limited to the number of zones available and the need to distribute the air proportioned to each zone evenly. Building energy codes place restrictions on the use of reheat temperature control.

VAV (Variable Air Volume) These systems are becoming more popular for their ability to provide unlimited zoning control and ease of future reconfiguration of space and zones. VAV systems are available in the 15-ton and up range in cooling only or cooling with heat versions. The heating section allows for morning space warm-up and building temperature setback.

Constant Volume Most retail outlet stores have RTUs with a single-zone heating and cooling configuration. These units have constant air volume to a single zone with a single thermostat controlling them. They are the least expensive to purchase and are the simplest to install and maintain.

Roof Top Units A typical RTU is a manufactured piece of equipment that is factory-assembled, delivered to the site in one piece and ready to operate with a single-point control interface. In most cases, they connect to utilities such as natural gas and electric power. In some configurations, they can be connected to a system’s hot water or steam system for heating, and chilled water system for cooling. In most cases, each unit is factory-tested to insure quality control. Having said this, it is still very important that a responsible contractor perform the start-up or commissioning service.

Roof Top Units Check operation of heating and cooling. The following points are essential parts of commissioning: Check operation of heating and cooling. Adjust the air/fuel mixture for your altitude. Adjust belts. Tighten bolts, particularly in the blower section. Remove shipping braces. Check for refrigerant leaks.

Construction and Installation Rooftop units are constructed of galvanized steel with a primer and a final UV-resistant paint coat. The exterior panels are insulated with glass fiber with a thickness of 1- to 2- inches. Units being manufactured with a solid metal liner are becoming more common due to IAQ (Indoor Air Quality) concerns.

Construction and Installation Condensate drain pans are constructed using steel with a mastic coating, galvanized steel, PVC, or stainless steel. Deeper pans with two-way sloping to drain are desirable to remove condensate from the unit completely and prevent ponding of water, where algae and microbial will proliferate and reduce air quality.

Construction and Installation An RTU mounts on a curb, which is a perimeter frame that supports the unit off of the roof deck. The top of the curb has a mating flange that adapts to the RTU. When you are replacing an RTU with another one having a different footprint, it is common to use an "Adapt-a-Curb". This device adapts the new RTU to the existing curb. Properly manufactured and installed with gaskets, the Adapt-a-Curb is an acceptable way to install a replacement RTU while not disturbing the existing roofing. Ductwork connections and gravity are usually not enough to keep an RTU in place during high winds. Straps, sheet metal screws or welding are common ways of fastening the RTU to the curb.

Construction and Installation RTUs should be placed near the area where they will heat or cool. This saves ductwork installation and thermal duct losses. Location relative to exhaust air fans or vents, plumbing vents, and process exhaust, such as kitchen hoods, should be taken into account. Additionally, ambient, prevailing wind conditions affect movement of air on the roof into the outside air intake louvers. Wind conditions also affect the operation of the condenser fans. When not energized, the fans can begin freewheeling or wind milling due to wind.

Construction and Installation Single-speed motors, when started, want to continue in the direction the fan was freewheeling. This could block air movement through the condensing unit. A three-phase unit will only run in one direction without changing electrical connections. If freewheeling in the wrong direction when energized, the fan will draw additional amperage and possibly damage the motor, fan blades, and or the fan supports.

Construction and Installation The architect, roofing consultants, and engineer should consider access to rooftop equipment in building design. Wear or walk pads to the units can minimize future damage to the roof by individuals and service equipment. With all of the choices available in RTUs today, there is sure to be something that will fit your needs. Discuss the options with your HVAC provider and, after considering all of the options, pick the one that will satisfy your needs.

Packaged HVAC Equipment In 2000 the U.S. Department of Energy estimates that rooftops and unitary air-conditioning equipment accounts for 62% of total energy consumption for cooling commercial buildings.

Service and Maintenance of Packaged HVAC Equipment Packaged equipment is : Smaller in size More numerous in number Usually not as well maintained

Why are they not as well maintained? Out of sight out of mind! Often ignored and forgotten until they have degraded to a point of failure. Effects of failure are limited to small number served. Large buildings have so many that preventive maintenance would require a lot of a service technicians time. In many cases the unit is all contained within the unit. i.e. – no chiller, no pumps, no additional piping, and no separate refrigerant piping.

Packaged HVAC Units “No Air Calls” Control Errors – 21% Electrical Problems – 20% Refrigerant Leaks – 12% Condenser – 7% Air Handling – 7% Evaporator – 6% Compressor – 5% Cooling Water Loop – 4% Plugged Filters – 2% Personnel Error – 2% Expansion Device – 2% Can’t Classify – 1%

Packaged HVAC Units Service Call Cost Breakdown Compressor – 24% Control Errors – 10% Condenser – 9% Electrical Problems – 7% Evaporator – 6% New Installation – 6% Air Handling – 5% Refrigerant Leaks – 5% Installation/Start-up – 4% Cooling Water Loop – 4% Fan Belt – 2% Others – 18%