Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.

Slides:



Advertisements
Similar presentations
1 Comments for Workshop on EEU Budget for August 6, 2008.
Advertisements

Produced by Empa IEA ECBCS Annex 50 Prefab Retrofit of Buildings Folie 1 Prefabricated Systems for Low Energy / High Comfort Building Renewal Project Presentation.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment.
New Paradigms for Measuring Savings
High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
California HVAC Program Strategy IOU Program Overview CPUC HVAC Workshop June 24, 2009.
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 28, 2011 Mira Vowles, P.E., CEM.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Equipment Lease Program Design Delivering the Benefits of Demand Response and Energy Efficiency.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
BPA Pre-Pilot, Monmouth  14 homes with installed DHP, single zone, single compressor.  11 Monmouth, 2 Moses Lake, 1 Tacoma  Savings.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Innovative Program Design to Reach a Difficult Market PSE&G Multifamily Housing Program Innovative Program Design to Reach a Difficult Market Rachael P.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.
1 Toronto, Ontario - October 31 and November 1, 2002 October 31, 2002 David Dern Technology Roadmap for Intelligent Buildings Marketing Director Continental.
Green Building Demonstration Project Adam Saling City of San Diego.
Bill Harrison New Jersey Chapter February 3, 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.
Thermostatic Shower Restriction Valve –Measure Screening Results New Measure Proposal February 19th, 2014.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE March 18 th, 2015 Residential New Construction Standard Protocol Subcommittee Kick-off.
Energy Trust of Oregon Small Commercial HVAC Pilot Program Stellar Processes December 15, 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Getting to Net Zero Energy or Carbon Neutral Buildings in the Pacific Northwest June 20, 2012.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Emerging Technologies & Energy Trust’s Resource Assessment.
June 19, 2003 Kirk McElwain Technical Director CDBI Design-Build Conference.
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Emerging Technologies Presented by Mark Rehley, Emerging Technology Operations Manager Northwest Energy Efficiency Alliance.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Northwest Power Planning Council Residential Space Conditioning and Domestic Hot Water Conservation Resource Assessment Overview of Analytical Process.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
National Approaches to Networked Lighting Systems DLC’s CALC Project and Examples from Outside California October 20, 2015.
Product/Service Area : HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
Transitioning to more Comprehensive Lighting Program Approaches Background, Program Drivers and Current Efforts Kate Baldacci, CEE Commercial Program Manager.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Action Plan for Variable Capacity Heat Pump Technology
Devin Rauss Building California’s Flexible Grid October 27, 2018
HYDRONIC HVAC: The Most Comfortable and Efficient System
Best Practices in Residential Energy Efficiency
A New Approach to Emerging Technology
HYDRONIC HVAC: The Most Comfortable and Efficient System
Industrial Assessment Center Database
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Presentation transcript:

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Difficult to Develop Measures and Incentive Programs Uncertain Savings, Costs and Cost effectiveness Owner Unfamiliarity with VCHP Designer Unfamiliarity with VCHP Contractor Unfamiliarity with VCHP Codes and Standards Lack of Information to prioritize measures Develop contractor qualifications and training Develop commissioning requirements Document operation and energy use Develop best practices to ensure energy saving Develop designer training and outreach Develop screening tool for cost effective opportunities Develop owner training on utility incentives and VCHP benefits Select and define highest priority measures Develop high consensus M&V protocols Quantify savings and costs over a specific baseline Develop measures Develop program Deliver program Follow developing codes and standards Action Plan for Variable Capacity Heat Pump Technology Lessons learned from previous projects Manufacturer training Lab and field testing resources Existing owner training channels VCHP research and resources Industry, professional and utility research and resources Codes and standards research and resources Others Barriers Define value proposition for utilities, building owners and contractors 1 p.2p.3p.4p.5p.6,7p.8,9p.10p.11

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Manufacturer training is difficult to access (nearest training center is in Southern California) Contractor Unfamiliarity with VCHP Lack of contractor knowledge/experience Poor installation even by the trained contractors Develop contractor qualifications and training Develop commissioning requirements VRF contractor training in Irvine, California Mark Jerome Get early copies of ASHRAE VRF mechanical tables Daikin provides online classes ( ercial/trainingOverview.asp?sec =training) Develop best practices to ensure energy savings Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of 2012 Investigate Cascade Energy Engineering VRF system; they have been monitoring system energy use for 5 years Mike Cundiff Lessons learned from ASHRAE Headquarters VRF demonstration project Investigate lessons learned from Oakridge residential DHP field testing Investigate lessons learned from Energy Trust New Buildings program has provided incentives for new community college buildings in Southern Oregon, installing Mitsubishi VRFs. M&V-completion date is Fall 2011 Erin Rowe Investigate savings and lessons learned from Corvallis Wild Life Preserve VRF system with HRV and economizers Mark Jerome Investigate lessons learned from Ecotope single-head DHP report (residential), including both field and lab testing. Contact Bob Davis or David Baylon at Ecotope Collaborate with "Center for Built Environment" for post occupancy evaluation of comfort and behavior Paul Delaney Investigate new products and features, including US-centric controls, heat pump boilers, data center rack cooling, etc. Mike Cundiff Technology misapplication can affect deployment 2 Mitsubishi has a contractor training in Atlanta Mark Jerome Pacific Energy Center offers designing and commissioning training Erin Rowe

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Designer Unfamiliarity with VCHP Proprietary equipment makes it hard to understand or commission Develop commissioning requirements Document operation in lab tests Lack of education in design and construction fields on technology VCHP does not fit into standard design process Unfamiliar with controls Get early copies of ASHRAE VRF mechanical tables Engineers are designing systems around the technologies that they are more comfortable with Develop best practices to ensure energy savings Develop designer training and outreach Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of 2012 Investigate Cascade Energy Engineering VRF system; they have been monitoring system energy use for 5 years Mike Cundiff Lessons learned from ASHRAE Headquarters VRF demonstration project Investigate lessons learned from Oakridge residential DHP field testing Investigate lessons learned from Energy Trust New Buildings program has provided incentives for new community college buildings in Southern Oregon, installing Mitsubishi VRFs. M&V-completion date is Fall 2011 Erin Rowe Investigate savings and lessons learned from Corvallis Wild Life Preserve VRF system with HRV and economizers Mark Jerome Investigate lessons learned from Ecotope single-head DHP report (residential), including both field and lab testing. Contact Bob Davis or David Baylon at Ecotope NREL may be a resource for lab testing VRF systems Bruce Baccei TI Project 216 EPRI Lab Testing Codes and standards were not available until recently Collaborate with "Center for Built Environment" for post occupancy evaluation of comfort and behavior Paul Delaney Investigate new products and features, including US-centric controls, heat pump boilers, data center rack cooling, etc. Mike Cundiff EWEB commissioning case study AHRI 1230 Mike Cundiff Daikin provides online classes ( rcial/trainingOverview.asp?sec=tr aining) Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of 2012 Technology misapplication can affect deployment Questionable cost effectiveness of economizers and ground coupled applications Develop screening tool for cost effective opportunities Lack of performance data to validate manufacturer claims Lack of robust design and modeling tools Not all applications of VCHP systems with simultaneous heating and cooling capability are cost effective Some applications are not appropriate for VRV e.g. large OSA with not many zones Technology misapplication 3 California Commissioning Collaborative can be a resource for commissioning Bruce Baccei

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Uncertainty in the market about the benefits of the system over the other systems Unsure of system operation Owner Unfamiliarity with VCHP Develop owner training on utility incentives and VCHP benefits Owners are not familiar with the systems Get early copies of ASHRAE VRF mechanical tables Develop best practices to ensure energy savings Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of 2012 Investigate Cascade Energy Engineering VRF system; they have been monitoring system energy use for 5 years Mike Cundiff Lessons learned from ASHRAE Headquarters VRF demonstration project Investigate lessons learned from Oakridge residential DHP field testing Investigate lessons learned from Energy Trust New Buildings program has provided incentives for new community college buildings in Southern Oregon, installing Mitsubishi VRFs. M&V-completion date is Fall 2011 Erin Rowe Investigate savings and lessons learned from Corvallis Wild Life Preserve VRF system with HRV and economizers Mark Jerome Investigate lessons learned from Ecotope single-head DHP report (residential), including both field and lab testing. Contact Bob Davis or David Baylon at Ecotope There are a lot of HVAC options in the market so this may not be perceived as the best option for a given application Lack of data and market knowledge to promote technology Perception of risk, uncertain owner and user, occupant acceptance Collaborate with "Center for Built Environment" for post occupancy evaluation of comfort and behavior Paul Delaney Investigate new products and features, including US-centric controls, heat pump boilers, data center rack cooling, etc. Mike Cundiff NEEA and BOMA owner training 4

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Lack of Information to Prioritize Measures Select and define highest priority measures Identify when and where designers include electric resistance heat with VRF systems Screen for where VRF HR systems are cost-effective Quantify savings for replacing electric heat Understand engineering, Installation, ownership, utility barriers Hard to define baselines to make comparisons Evaluate whether the amount of VCHP refrigerant is an issue Preliminary screening of cost effectiveness of measures Identify installations where savings can be verified Verify the significance of duct losses and feasibility of M&V Investigate savings for baselines that do not have cooling Distribute and post EPRI VRF market studies, commissioned by BPA, when they are available Mira Vowles Develop cost database Mitsubishi VRF analysis based on EnergyPro model Nick Fernandez ASHRAE Appendix G Uncertain cost effectiveness for some applications VCHP measure potential research and studies (Power plan) Evaluate top identified applications 5

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Uncertain Energy Savings, Costs and Cost Effectiveness Quantify savings and costs over a specific baseline Select baseline Quantify annual energy savings, benefits, costs Develop models to quantify savings for top priority measures Quantify energy savings for night setback Quantify non-energy benefits (O&M, gas savings, productivity due to improved comfort, etc.) to fully account for additional cost effective measures Uncertain savings Establish measure life Investigate lessons learned from BC Hydro VRF office building retrofit in Vancouver; combination of modeled/measures savings. Presented at Emerging Tech Conference in Sacramento in Nov 2010 Ron Domitrovic Mitsubishi VRF analysis based on EnergyPro model Nick Fernandez Document savings trade-off for VRF HR without economizers, Paul Doppler Jim Benville Investigate savings and lessons learned from Corvallis Wild Life Preserve VRF system with HRV and economizers Mark Jerome Use AHRI 1230 equipment performance ratings (EER, COP, IEER) to estimate savings, including water cooled VRF system savings over air cooled VRF systems Mike Cundiff Skepticism about savings and real cost/benefit ratio Investigate lessons learned from PNNL/NEEA work to disaggregate electrical loads, and use to determine actual VRF system energy use Nick Fernandez Uncertain cost Unknown equipment life Distribute and post EPRI VRF market studies, commissioned by BPA, when they are available Mira Vowles Investigate new products and features, including US-centric controls, heat pump boilers, data center rack cooling, etc. Mike Cundiff Condensate piping and pumps are a costly oversight Incremental costs of VRF systems could be higher or lower than baseline systems Utilities can not incent if incremental cost is negative Investigate life of Asian systems TI Project 216 EPRI VRF HR Lab Testing 6

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Identify installations where savings can be verified Existing M&V approaches like energy modeling and deemed savings are not proven for VRF systems Complex systems-hard to accurately measure and quantify savings Develop high consensus M&V protocols Share results from EPRI VRF&DHP EE Demo's Mira Vowles RTF VCHP Sub committee IPMVP Document M&V protocols from field tests Possible opportunity for field testing in a set of test bed commercial buildings that are being constructed in Richland, WA at PNNL's headquarters. Nick Fernandez Challenges metering commercial VCHP systems M&V for Uncertain Energy Savings 7

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Product/Service Area : Difficult to Develop Measures Uncertain savings Document magnitude and longevity of the incremental electric energy savings. Develop simple savings calculators based on documented performance to be nimble, reduce reliance on energy models and lower program delivery cost Evaluate cost effectiveness of measures Develop whole building savings estimation and M&V using billing data Verify tenant billing system for M&V Determine sample size to quantify statistically significant savings Develop equipment based measures Uncertain cost Field test M&V protocols Summarize lessons learned based on evaluation of SCE's upstream VRF incentive program Paul Delaney ASHRAE VRF mechanical tables Unknown equipment life Describe energy savings time-of- occurrence and duration: Load Shape, Lifetime Use AHRI 1230 equipment performance ratings (EER, COP, IEER) to estimate savings, including water cooled VRF system savings over air cooled VRF systems Mike Cundiff Develop performance based measures Consider upstream program ($/ton), similar to SCE, based on energy models Quantify baseline EUIs for building types Higher first cost VRF may add cooling to uncooled baselines Design program to minimize free ridership Develop simple system start-up requirements for incentives Develop measure specific M&V protocols Share results from EPRI VRF&DHP EE Demo's Mira Vowles RTF VCHP Sub committee IPMVP Possible opportunity for field testing in a set of test bed commercial buildings that are being constructed in Richland, WA at PNNL's headquarters. Nick Fernandez VRF Pilot to verify measure savings Investigate incorporating VRF systems into office of the future pilot projects which have 30-50% savings goals. Contact Amy Cortese, with New Building Institute, Bruce Baccei Complicated utility incentive process Define the value proposition for the utilities, building owners and contractors 8

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Difficult to Develop Incentive Programs Quantify savings for baselines that do not have cooling Develop VRF measures, possibly whole building/pay for performance incentives Quantify baseline EUIs for building types Develop best practices to prevent electric resistance heat operation Develop best practices and specifications for ERV design and operation Evaluate unoccupied temperature set-back/set-up, DOAS control, electric resistance heat lock-out, low-ambient performance and optimal start capabilities -develop best practices and pay for performance Higher initial cost Usually adds cooling to a space that did not have cooling before Summarize lessons learned based on evaluation of SCE's upstream VRF incentive program Paul Delaney Determine free ridership. Design program to minimize free ridership Develop simple system start- up requirements for incentives Develop equipment based measures Develop performance based measures Consider upstream program ($/ton), similar to SCE, based on energy models Develop VCHP Incentives 9

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Codes and Standards Costly to meet ventilation codes with VCHP systems Follow developing IECC and other economizer code exceptions Evaluate whether the amount of VCHP refrigerant is an issue Safety concerns over refrigerant leaks ASHRAE refrigerant standard Codes and standards are still being developed IECC 2012 Get early copies of ASHRAE VRF mechanical tables Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of 2012 Follow developing codes and standards Document savings trade-off for VRF HR without economizers, Paul Doppler Jim Benville IECC 2012 Difficult to meet net zero Follow developing IECC net zero requirements Follow developing IECC and other economizer code exceptions Evaluate whether the amount of VCHP refrigerant is an issue Follow developing IECC net zero requirements 10

Product/Service Area: HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI Research Needed Resource Available Proposed Action Item E3T Assessment Needed Identified Barrier Other Barriers Inertia of traditional (US) HVAC manufacturing design and contracting system Define the value proposition for the utilities, building owners and contractors Cheaper install equals less commission for sales man Negative experiences e.g. ASHRAE HQ Issues Lessons learned from ASHRAE Headquarters VRF demonstration project Investigate lessons learned from Oakridge residential DHP field testing Investigate lessons learned from Energy Trust New Buildings program has provided incentives for new community college buildings in Southern Oregon, installing Mitsubishi VRFs. M&V-completion date is Fall 2011 Erin Rowe Investigate savings and lessons learned from Corvallis Wild Life Preserve VRF system with HRV and economizers Mark Jerome Investigate lessons learned from Ecotope single- head DHP report (residential), including both field and lab testing. Contact Bob Davis or David Baylon at Ecotope. Bob Davis Investigate lessons learned from BC Hydro VRF office building retrofit in Vancouver; combination of modeled/measures savings. Presented at Emerging Tech Conference in Sacramento in Nov 2010 Ron Domitrovic Share EPRI VRF & DHP EE Demo results and Market Studies Mira Vowles Get early copies of ASHRAE VRF Handbook Chapter, which is scheduled to be available Spring of