Presentation On Energy Audit of PSWR (HQ), Srimohini Complex, Nagpur 01 February 2010.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Break Time Remaining 10:00.
ABC Technology Project
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Mathe III Lecture 2 Mathe III Lecture 2. 2 _____________________________________ Montag 8.00 – 9.30 Uhr – HS H Montag Uhr – HS H Mittwoch.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
How Cells Obtain Energy from Food
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Presentation On Energy Audit of PSWR (HQ), Srimohini Complex, Nagpur 01 February 2010

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 2 At the outset.. A Big Thank You for- Executive Director, PSWR for his constant reminder for this energy audit to happen.

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 3 Objective At PSWR (HQ), Nagpur Office Complex: To identify potential areas for energy saving. To minimize Energy Bill To suggest long term Energy Conservation Strategies to be adopted.

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 4 Exclusions The following are excluded : 5 th Floor SAS area Diesel Engine and its expenses Water related expenses.

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 5 BHEL,PSWR (HQ), Nagpur Office: Background Information Office Complex Opened in 1989 The lighting and Air Conditioning System has remained almost unchanged for the last twenty years. Occupancy has increased more than 100% thus increasing the load on the air conditioning system and energy consumption.

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 6 Data Collection Measurements Identification of potential area for improvement. Technical Discussion Evaluation of Projects and now… the Presentation METHODOLOGY

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 7 Data Collection

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 8 Energy Bill for the Last 24 Months

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 9 Energy Consumption Pattern

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 10 Cost of Energy Consumption

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 11 Understanding Components of Energy Bill (Example Dec 09) SLNODESCRIPTIONRUPEES 1NO OF for unitsRs Additional Demand ChargesRs Power Factor Penalty/IncentiveRs TotalRs 2,16,197.00

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 12 Payment of Penalty / Incentive due to Power Factor during Last 24 Months

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 13 Measurements

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 14 Components of Energy Consumption

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 15 Components of Energy Consumption (Contd.) Air Conditioning System Air Cooled ACs – 40% Water Cooled ACs – 30% Cooling Tower – 15% Total- 85 % Lighting – 15 % Total Energy- 100%

Components of Energy Consumption (Contd.) 31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 16

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 17 Indoor Air Quality

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 18 Office Occupancy Over Last Five Years

Technical Discussions 31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 19

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 20 Shot-Term Suggestions Areas Where immediate Improvement can take place : Power Factor Improvement Cooling Tower Improving the Indoor Air Quality

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 21 Power Factor Improvement Suggestion: Installation of Capacitance Bank along with Power factor Controller Approximate Cost: Rs Payback Period: Two Months

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 22 Cooling Tower Suggestion: Replacing the Water Cooed Air Conditioners with Air Cooled. This will make the cooling Tower Redundant. Approximate Cost: 4 x Rs175, that is Rs7.00 Lakhs Payback Period: Approximately 2 years

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 23 Indoor Air Quality Improvement Suggestion: Installation of Ozonizers This will Reduce CO2 concentration Reduce Fresh Air intake Reduce Energy Consumption

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 24 Long Term Suggestions This suggestions are in line with Recommendation of Meeting of BHELs Apex Committee on Energy Management Dated 31 st December Exploring installation of Grid Interactive Solar Power Unit on the rooftop 2.Replacing all the old Tube lights with CFL or LEDs. (The BHEL Board on the rooftop can be immediately changed to LED types.)

31/05/2014 Exploring Heights Setting Standards Marching Towards Excellence Power Sector Western Region 25 Thanks to…….. HR Department for providing us the required Data Shreem Capacitors Pvt. Limited for technical discussions on Power Factor Improvement Bluestar for technical discussion on Energy Audit of Air Conditioning system. Omniscient Treatment Technologies for indoor air quality measurement and suggestions.