Compliance Performance Measure Proposals and Preliminary Trends

Slides:



Advertisements
Similar presentations
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
Advertisements

NERC Orientation Joint Guidance Committee WECC Leadership
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
Compliance Application Notice Process Update and Discussion with NERC MRC.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Progress Report to the PSC Steering Committee INTOSAI PSC Subcommittee on Internal Control Standards SAI of Poland (NIK) June 2011, Wellington.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Performance Measure Recommendations Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee Meeting September 8-9,
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
IRP Update IFTA 2006 Annual Business Meeting Las Vegas, NV Dave Saddler Presented by: Dave Saddler Executive Director IRP, Inc.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Challenges of Linking Operational Risk Data
CUCSA Workgroup Chair Orientation
Updated ERO Enterprise Guide for Internal Controls
Rachel Coyne Manager, Reliability Standards Program
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reliability Assessment Committee Proposal TSS Meeting
CIIMS Proposal for TOP-003 Approach
Implementation Strategy July 2002
Reliability Assessment Guidebook (RAG): Status Report
Reliability Assessment Guidebook (RAG): Status Report
Background (history, process to date) Status of CANs
GMD Data Request NERC Rules of Procedure Section 1600
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Proposed RISC 2014 Deliverables, Activities, and Calendar
Progress Report on proposed GUID on Information System Security Audit
Workshop Session 1: Overview
The Electric Reliability Organization: Getting from here to there.
Reliability Standards Development Plan
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
Coordinate Operations Standard
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Strategic Planning Process
Strategic Planning Process
Performance Measure Recommendations
NERC Reliability Standards Development Plan
Document Categorization Policy
Structural Funds: Investing in Roma
Standards Development Process
System Safety Regulation
MAC Input on Section 4.9 Review
Lyn Provost, IAASB Member and Task Force Chair IAASB Meeting
Presentation transcript:

Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee Meeting March 10-11, 2010

Topics PMTF Tasks and Approach Performance Measure Proposals Preliminary Trends Outreach Effort Next Steps

PMTF Tasks Establish an open, consistent and repeatable metric development process to identify and evaluate metrics Develop compliance improvement measures at the highest levels to provide insight in terms of a set of compliance principles Coordinate and work with Regional Entities, RMWG, OC, PC and CIPC to ensure agreement Recommend how to benefit from the compliance improvement measures

Approach Adopt RMWG’s open metric development process Review data source on compliance and other key input factors Propose a set of performance measures at high levels Gather data and validate trends Solicit feedback and other ideas from stakeholders Prepare a draft report starting April 2010

Proposed Performance Measures Compliance Culture Timeliness of CVI/CIQ Average Duration of Mitigation Plan Completion Violation Risk Index Average Duration of Audit Report Completion w/ No Violations Average Duration of Audit Report Completion w/ Potential Violations Availability/timeliness of 'lessons-learned’ guidance from audits, operating experience, violations and disturbances Feedback to standards development The detailed individual metric definitions and specifications are available at http://www.nerc.com/filez/pmtf.html.

Compliance Culture Measure Metric – Compare Self-Disclosed Violations to the Total Number of Discovered Violations Self-Disclosed = Self-report + Self-certification Indicates the level of trust and cooperation within the “NERC Enterprise” as well as the culture of compliance of the stakeholder community

Trend By Discovery Method

Compliance Culture Trend

Timeliness of CVI/CIQ Average Duration – for CVI/CIQ with Open status Total number of CVIs/CIQs for Open and Closed status Number of lessons learned and trends issued to industry

CVI/CIQ Timeliness Measure Duration (Days) CVI CIQ Oldest Average NERC 644 317 361 242 Region 823 444 126 107

Triggers for NERC/Regional CVIs/CIQs

Average Duration of Mitigation Plan Completion Duration – from Date plan received to Mitigation close date Sum of all durations divided by total number of violations discovered in a particular quarter Remove zero duration days

Average Number of Days for Completing Mitigation Plans

Violation Risk Index (VRI) Violation Risk Index is defined as a risk factor and severity level weighted average based on unmitigated violations Assess potential consequences of a particular unmitigated violation. Unmitigated violations of higher risk factor requirements have more weighting value than of lower risk factors. Determine the change in reliability levels due to Standard requirement violations. Weighting factors and an example are included in Appendix A.

NERC Unmitigated Violations (6/18/07 to 12/31/2009)

Violation Risk Trend

Average Duration of Audit Report Completion w/ No Violations Measure audit process efficiency and ability to promptly advise industry of audit results  These reports do not have potential violations Starting point: audit ending point Ending point: report finalized with entity and received by NERC

Average Duration of Audit Report Completion w/ No Violations

Average Duration of Audit Report Completion w/ Potential Violations Measure enforcement process efficiency and ability to promptly advise industry of audit results  These reports have potential violations Starting point: audit ending point Ending point: report finalized with entity and received by NERC Data is not available until second quarter of 2010

Timeliness of Lessons-Learned Establish a common and central platform to share lessons-learned Timeliness of actionable lesson-learned guidance from operating experience, violations and disturbance events Lessons-Learned guidance Recommendations from event analysis Compliance analysis Advisories

Timeliness of compliance results/feedback to standards # of SARs (e.g., refine a particular requirement) # of suggestion and comment submittals The Standards input form is available at http://www.nerc.com/files/Standards_Input_Form_Final_2008June30.doc Direct input to “results-based” standards initiative Focus on risk-based standards, using first assessment triage sheet

Outreach Effort Chair met with and presented to the RMWG on February 18, 2010 Chair presented to the NERC/Regional Entity Compliance Group at its conference call on February 26, 2010 Chair presented to the OC/PC/CIPC at their joint WebEx conference call on March 9, 2010

Next Steps Continue reaching out to seek guidance Members will meet with OC and PC on March 16-17, 2010 Recommend the proposals in June, desiring CCC approval in September 2010 Comments and suggestions are due April 2, 2010 Send to PMTF Chair, Greg Pierce at GPIERC2@entergy.com and NERC at jessica.bian@nerc.net

Question & Answer

Appendix A Violation Weighting Factor Table Note: 1. The weighting values are derived by applying similar ratios developed in the Base Penalty Amount Table described in section 4 of the ERO Sanction Guidelines, Appendix 4B to the NERC Rules of Procedure. 2. Reference materials are available in a NERC white paper “Toward Ensuring Reliability: Reliability Performance Metrics”. It can be viewed at: http://www.nerc.com/docs/pc/rmwg/Reliability_Metrics_white_paper.pdf.

VRI Example