DD DD GG GG GG MM MM MM AA AA L LL LL LL L Layout.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3.
Process Selection and Facility Layout
© 2007 Pearson Education DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout Chapter 8.
© 2007 Pearson Education DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout Chapter 8.
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Location Strategy and Layout Strategy
Process and Material Flow Analysis Chapter 3. Data requirement for layout decisions Frequency of trips or flow of material or some other measure of interaction.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
Chapter 10 - Layout Layout planning involves decisions about the physical arrangement of economic activity centers within a facility. Basically, anything.
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Session Pooja patnaik.
Process Selection and Facility Layout
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility layout.
Chapter 10 – Facility Layout
Layout Strategy.
Process (Job Shop) Layouts
Facility Design and Layout
DOM 102 : Principles of Operations management
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. DD DD GG.
Chapter 10 – Facility Layout
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. DD DD GG GG.
DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout.
MGT Operations Management
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Chapter 10 – Facility Layout Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough -
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Facilities Operations Management - 5 th Edition Chapter 7 Roberta.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Group Technology.
Process Layout Chapter 7 July 20, 2005.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Line Balancing.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. DD DD GG.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. DD DD GG.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
Chapter 9 Facility Layout. Objectives of Facility Layout Minimize material handling costs Utilize space efficiently Utilize labor efficiently Eliminate.
Facility Layout Objectives of Facility Layout Basic Types
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
PLANT LAYOUT. THE PLANT Refers to the physical components of the manufacturing process of the product Required both in terms of buildings and equipments.
© 2007 Pearson Education DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout Chapter 8.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2014 Pearson Education, Inc © 2014 Pearson Education, Inc. Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations.
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
Chapter 10 – Facility Layout
Process Selection and Facility Layout
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Operations Management
Process Selection and Facility Layout
Presentation transcript:

DD DD GG GG GG MM MM MM AA AA L LL LL LL L Layout

What Is Layout Planning? What centres should the layout include? How much space and capacity does each centre need? How should each centres space be configured? Where should each centre be located?

Strategic Issues Facilitating the flow of materials Increasing the efficient utilization of labour and equipment Increasing customer convenience Reducing hazards to workers Improving employee morale Improving communication

Criteria for a Good Layout Maximum flexibility Maximum co-ordination Maximum use of volume Maximum visibility Maximum accessibility

Criteria for a Good Layout Minimum distance Minimum handling Minimum discomfort Inherent safety Maximum security Efficient material flow Identification

Layout Types Process Layout Product Layout Fixed-Position Layout Hybrid Layout - Cells

Layout Types - Process Layout

Organizes resources around the process and groups work stations or departments according to function Intermittent, low volume, high-variety

Layout Types - Process Layout Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging (a) Layout of a job shop

Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging

Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging

Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging

Layout Types - Process Layout Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging (a) Layout of a job shop

Layout Types - Process Layout Advantages General purpose, flexible resources are less capital intensive Less vulnerable to changes in product mix or new market strategies Equipment utilization can be higher, because not dedicated to one product line Employee supervision can be more specialized

Layout Types - Process Layout Disadvantages –Slower processing rates –Lost production time during setups –More capital and more floor space tied up with inventory –Longer manufacturing lead times –Costly materials handling, requiring variable path devices –Production planning and control more difficult

Layout Types - Process Layout A major challenge in designing process layouts is to identify dominant flow patterns among the jumbled traffic and to locate centres so that materials handling is minimized.

Layout Types - Product Layout

Dedicates resources to a product or closely related product family Repetitive, high-volume, continuous production Workstations or departments are arranged in a linear path, which is consistent with the routing sequence of the product.

Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4

Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4

Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4

Layout Types - Product Layout Station 1Station 2Station 3Station 4 (b) Layout of a production line

Layout Types - Product Layout Advantages Faster processing rates Lower inventories Infrequent setups

Layout Types - Product Layout Disadvantages –More risk of layout redesign –Less flexible –For low volume, dedicated resources have low utilization

Layout Types - Product Layout Challenge in designing product layouts –Minimize resources used to achieve desired output rate –Balance tasks, equalize the workload assigned to resources

Layout Types - Fixed-position Layout

Product is fixed in place. Resources come to the product, minimizing number of times product must be moved. Used for: Very large products, ships, roads, power plants, airplanes Service of fragile or bulky items

Layout Types - Fixed-position Layout Product Process

Layout Types - Fixed-position Layout Advantages –Material movement is reduced to a minimum. –The task is usually carried out by a gang of operators, hence continuity of operators and responsibility is required. –Production centres often operate independently of each other, and effective scheduling can be planned to ensure minimum total production time.

Layout Types - Fixed-position Layout Limitations –Movement of machines and equipment to the production centre may be costly and time consuming. –Positioning of the material or object or machines may be cumbersome and costly. –Machine and equipment utilisation is usually low, owing to handling and positioning time. –High grades of skill are required.

Muthers P-Q Chart

Group Technology

Machine 1 Machine 2 Machine 3 Machine 4 Machine 5 Materials in Finished goods out One Worker, Multiple Machines

Group Technology

Parts Families Source: Mikell P. Groover. Automation, Production Systems, and Computer-Aided Manufacturing. Englewood Cliffs, NJ: Prentice-Hall, 1980, p Used by permission.

Group Technology

Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L

Group Technology (a) Jumbled flows in a job shop without GT cells Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L

Group Technology (a) Jumbled flows in a job shop without GT cells Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L

Group Technology (a) Jumbled flows in a job shop without GT cells

Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G

Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G

Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G

Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G

Longhorn Machine

60' 90' Longhorn Machine Department Area Needed(ft 2 ) 1 Burr and grind NC equipment950 3 Shipping and receiving750 4 Lathes and drills Tool crib800 6 Inspection700 Total5400

60' 90' Longhorn Machine Department Area Needed(ft 2 ) 1 Burr and grind NC equipment950 3 Shipping and receiving750 4 Lathes and drills Tool crib800 6 Inspection700 Total5400 Figure 10.6

60' 90' Longhorn Machine

60' 90' Longhorn Machine Trips Between Departments Department Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection

60' 90' Longhorn Machine Trips Between Departments Department Burr and grind NC equipment Shipping and receiving Lathes and drills70 5 Tool crib 6 Inspection

60' 90' Longhorn Machine

60' 90' Longhorn Machine Closeness Rating Between Departments Department Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection

60' 90' Longhorn Machine Closeness Rating Between Departments Department Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection Closeness Rating Rating Definition AAbsolutely necessary EEspecially important IImportant OOrdinary closeness UUnimportant XUndesirable

60' 90' Longhorn Machine Closeness Rating Between Departments Department Burr and grindEUIUA 2 NC equipmentOUEI 3 Shipping and receivingOUA 4 Lathes and drillsEX 5 Tool cribU 6 Inspection Closeness Rating Rating Definition AAbsolutely necessary EEspecially important IImportant OOrdinary closeness UUnimportant XUndesirable

60' 90' Longhorn Machine Closeness Rating Between Departments Department Burr and grindEUIUA 2 NC equipmentOUEI 3 Shipping and receivingOUA 4 Lathes and drillsEX 5 Tool cribU 6 Inspection Explanation Codes Code Meaning 1Materials handling 2Shared personnel 3Ease of supervision 4Space utilization 5Noise 6Employee attitudes

60' 90' Longhorn Machine Closeness Rating Between Departments Department Burr and grindEUIUA (3, 1)(2, 1)(1) 2 NC equipmentOUEI (1)(1)(6) 3 Shipping and receivingOUA(1) 4 Lathes and drillsEX (1)(5) 5 Tool cribU 6 Inspection Explanation Codes Code Meaning 1Materials handling 2Shared personnel 3Ease of supervision 4Space utilization 5Noise 6Employee attitudes

60' 90' Longhorn Machine

60' 90' Longhorn Machine 60' 90' Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Figure 10.6

60' 90' Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Example 10.1

60' 90' Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 6 Example 10.1

60' 90' Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 61 Example 10.1

60' 90' Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Example 10.1

60' 90' Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Figure 10.7

60' 90' Longhorn Machine

60' 90' Longhorn Machine Trips Between Departments Department Burr and grind NC equipment Shipping and receiving Lathes and drills70 5 Tool crib 6 Inspection Example 10.2

60' 90' Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,220 1,420 1,680 2,310 2,575 3,415 3,690 4,570 Example 10.2

60' 90' Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,2203 1,4202 1,6802 2,3102 2,5752 3,4151 3,6903 4,5701 Example 10.2

60' 90' Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1, , , , , , , , ld =785 Example 10.2

60' 90' Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1, , , , , , , , ld =785 ld =400 Example 10.2

60' 90' Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1, , , , , , , , ld =785 ld =400 Example 10.2

A-1 Distribution Systems

Figure 10.8 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks) 1.Toasters Air conditioners Microwaves Stereos TVs Radios Bulk storage1002 Example 10.3 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = 80 3.Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 50 Example 10.3 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Example 10.3 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Example 10.3 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Example 10.3 DockAisle Storage area 3

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Example 10.3 DockAisle Storage area 3 1

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Example 10.3 DockAisle Storage area

A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters /1 = Air conditioners /2 = Microwaves /1 = Stereos /3 = TVs /4 = Radios /1 = Bulk storage /2 = 507 Figure 10.9 DockAisle Storage area

Zone Systems

Shipping doors Tractor trailer Zones Figure 10.10

Zone Systems Click to add title Zones Shipping doors Tractor trailer Feeder lines Figure 10.10

Zone Systems Click to add title Zones Control station Shipping doors Tractor trailer Feeder lines Figure 10.10

Zone Systems Click to add title Zones Trunk line Control station Shipping doors Tractor trailer Overflow Feeder lines Figure 10.10

Addison Wesley Longman Distribution Center

Line Balancing Green Grass, Inc. Big Broadcaster

Line Balancing Big Broadcaster

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 A Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) B A Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) B C A 30 Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) D B C A Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) E D B C A Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) E D B F C A Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) E D B F C A G Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) E H D B F C A G Example 10.4

Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) E H I D B F C A G Example 10.4

Line Balancing Big Broadcaster E H I D B F C A G Figure 10.11

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week r = 2400/40 = 60 units/hour Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week r = 2400/40 = 60 units/hour c = 1/60 = 1 minute/unit = 60 seconds/unit Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week c = 60 seconds/unit Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week c = 60 seconds/unit TM = 244 seconds/60 seconds = or 5 stations Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week TM = 244 seconds/60 seconds = or 5 stations Efficiency = [244\5(60)]100 = 81.3% c = 60 seconds/unit Example 10.5

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S1 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 S3 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% S1 S2 S3 Example 10.6

Line Balancing Big Broadcaster E H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% S1 S2 S3 S5 S4 Figure 10.12