Proposed Changes to Homes and Small Buildings for Energy Efficiency Joan Maisonneuve CHBA-Alberta.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
1
EuroCondens SGB E.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
CALENDAR.
Learning to show the remainder
Structural Insulated Panels Commercial Applications A Foundation for CCM Products.
The 5S numbers game..
Common Components of a Traditional Wood Framed Building
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Building Data Entry NEAT/MHEA Common Errors Oak Ridge National Laboratory Weatherization.
7 | Means of Egress (Life Safety Code)
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
Break Time Remaining 10:00.
The basics for simulations
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Floor-Plan Dimensions and Notes
Identifying and Air Sealing the Building Envelope
PP Test Review Sections 6-1 to 6-6
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov Calculating Envelope Energy Loss WEATHERIZATION ENERGY AUDITOR.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Adding Up In Chunks.
A/C Final Project: Design Builder
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
25 seconds left…...
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
: 3 00.
5 minutes.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Update of the National Energy Code for Buildings
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
May 27 th 2011 IRC - Codes Report Energy Efficiency in Housing and Small Buildings.
The Fall Builders’ Forum Part 9 Energy Efficiency and Ventilation Regulations “Effective December 19 th, 2014”
Overview of 9.36 Energy Efficiency for Small Buildings
NORTHWEST ENERGY EFFICIENCY ALLIANCE Affordable Performance Home Initial thoughts…… November 2011.
Overview of 9.36 & NECB Joan Maisonneuve.
Framing Vocabulary Stud: upright beams in the framework of a building
Insulation Dr. Qing Wang
Presentation transcript:

Proposed Changes to Homes and Small Buildings for Energy Efficiency Joan Maisonneuve CHBA-Alberta

A Tale of Two NECB – complete document Applies to large buildings > 3 stories Published by NRC in fall of 2011 Not yet adopted by the province Concerns with window to wall ratios CHBA working with builders on this Part 9 Changes Currently out for review by NRC Publishing anticipated late 2012

Scope of Part 9 For EE Housing and small buildings Includes secondary suites < 600 m 2 and 3 storey in height (dwellings) Buildings with dwelling units w/common space < 20% of floor area Building envelope HVAC Service water

Early Work by CHBA National A reasonable step forward not an arbitrary EnerGuide 80 Elimination of window/door to wall ratios Reduction of insulation at the attic perimeter Air tightness is prescriptive areas versus blower door testing Opaque & vertical area RSI trade-off

Three Compliance Paths Prescriptive path No specific ENERGUIDE target No air leakage target No wdw/wall ratios Trade-off option Performance Path Comparison against a reference house Energy target = annual energy consumption of reference house Air change rate of 3.2 or 2.5 or tested

Conventions for Units Effective RSI values for walls, ceiling and floors i.e. transmission through framing combined with insulated areas U-value for windows and doors Overall window value by A440.2

Calculation of Thermal Resistance of Assemblies Includes: Studs, joists, lintels, sills, plates (ladders?) Excludes: Minor penetrations (pipes, ducts) Areas not intended to be heated Need to calculate major structural penetrations Balcony slabs, beams, columns Total area of such penetrations is limited to max 2% of the gross wall area If an area exceeds 2% it must be taken into account

Continuity of Insulation To prevent a break in the continuity of the insulation of the building envelope Partitions, chimneys, fireplaces, columns beams, flues Compensate by insulating for a distance of 4X the thickness of the penetrating element, inward and outward Also applies where one bldg components meets another

Requirements for Bldg. Envelope RSI Location by Climatic Zones Depends on HRV or NO HRV Climate Zone, Heating Degree Days o C Zone 4Zone 5Zone 6Zone 7aZone 7B Zone 8 < to to to to 6999 > 7000 Lethbridge Edmonton Red Deer Calgary Grande Prairie

Minimum ASSEMBLY RSI RED = without HRV Black = with HRV AssemblyZone 6 Lethbridge Zone 7a Edm, R.D, Calgary Zone 7B G.P. Ceilings below attics 8.66/8.66 (R-50) 10.43/8.66 (R-60) 10.43/10.43 ( R-60) Cathedral ceilings and flat roofs 4.75/4.75 (R- 27) 5.07/5.07 (R-30) Walls 3.27/3.16 (R- 18.5) 4.13/3.27 (R-24) Floors over unheated spaces 4.75/4.75 ( R-27) 5.07/5.07 (R-30) Rim joists 3.46/ 3.32 (R-20) 3.67/3.46 (R-21) Foundation walls 3.17/3.17 (R-18) 3.57/3.17 (R-20) 3.57/3.17 (R20) Unheated Floors below frost line uninsulated

Examples of Assemblies Appendix has tables with examples of assembles and the nominal R-value in various zones: Trade-off path available

Table A Minimum Residual Thermal Resistance Value for Insulation, Sheathing(1) and other Materials for Walls Above and Not in Contact with the Ground Assembly description Required Effective Thermal Resistance RSI in m² K/W (See Article ) Description of base assembly Stud SpacingNominal insulation between studs mm (in.) m² K/W Minimum required residual nominal thermal resistance (1) (3) (5) (RSI) in m² K/W 2x6 wood framing 12.7mm gypsum board, vinyl siding, no strapping 406 (16)3.34 (R19) (2)RSI 0.11 (R 0.6)RSI 0.36 (R2)RSI 0.47 (R2.7)RSI 1.33 (R7.5) 3.87 (R22)RSI 0.14 (R0.8)RSI 0.25 (R1.4)RSI 1.11 (R6.3) 4.23 (R24)RSI 0.11 (R 0.6)RSI 0.97 (R5.5) 610 (24)3.34 (R19) (2)RSI 0.04 (R 0.2)3 RSI 0.27 (R1.5)RSI 0.38 (R2.2)RSI 1.24 (R7) 3.87 (R22)RSI 0.02 (R 0.1)RSI 0.13 (R 0.7)RSI 0.99 (R5.6) 4.23 (R24)RSI 0.84 (R4.7) 2x4 wood framing 12.7 mm gypsum board, vinyl siding, no strapping 406 (16)2.11 (R12)RSI 1.01 (R5.7)RSI 1.24 (R7)RSI 1.35 (R7.7)RSI 2.20 (R12.6) 2.46 (R14)RSI 0.85 (R4.9)RSI 1.08 (R6.1)RSI 1.19 (R6.8)RSI 2.05 (R11.7) 610 (24)2.11 (R12)RSI 0.95 (R5.4)RSI 1.18 (R6.7)RSI 1.29 (R7.4)RSI 2.15 (R12.2) 2.46 (R14)RSI 0.82 (R4.6)RSI 1.05 (R6)RSI 1.16 (R6.6)RSI 2.02 (R11.5)

Allowable Reduction In Attic Reduction in required insulation level at perimeter of attics under sloped roofs Minimum nominal RSI 3.52 (R20) at exterior of wall Maximum 1200 mm from interior/ exterior of wall Minimum height at outside surface of exterior of wall depends on: Minimum 1 vent clearance Roof slope and location of top-bottom chord junction Issue for scissor trusses?

Foundations Building Assembly Below or in Contact With the Ground Heating Degree-Days(HDD) of Building Location, in Celsius Degree-Days Zone 4Zone 5Zone 6Zone 7aZone 7bZone 8 < to to to to Minimum Effective thermal resistance (RSI) in m² K /W Foundation Walls Unheated Basement Floors – below frost line uninsulated – above frost line1.96 Floors on Permafrost Heated Basement Floors ) Structural Slab on grade

Windows & Doors No prescriptive area limits U-values for doors and windows of 1.6 or 1.4 OR Energy Rating values of 25 & 29 17% to 22% FDWR used as references in building envelope trade-off option 3 Used in performance compliance path

Trade-Off Option Above ground opaque – Above-ground opaque Decreased insulation in a wall area compensated by increased insulation in an equal area of ceiling or another wall Limits placed on maximum permitted reduction in performance i.e. Tall wall areas Windows – Windows increased U-value (decreased R-value) of one window area compensated by decreased U-value (increased R-value) for another equal window area

Air tightness Prescriptive details Materials, properties, joints, penetrations NO testing required in prescriptive path Testing may be used in the performance path Assembly Specification Qualified Assemblies plus junctions

Air Tightness Properties specified for materials intended to provide air tightness Construction details described for joints and junctions in the airtight material Service penetrations including chimneys, ducts, vent stacks, wiring and electrical boxes Foundations and sill plates, sill plates and rim joists Windows/doors/skylights and walls/ceilings Interior walls and exterior walls/ceilings

HVAC Equipment sized to Can/CSA F-280 HVAC Ducts - generally Sizing to good practice Ducts outside the plane of insulation Sealed joints Insulated to same level as required for above-grade walls Ducts – under insulated floors over unheated spaces Sealed Insulated to wall RSI Sides can be insulated to compensate for reduction on top & bottom Round ducts? At rim joist area?

HVAC Intakes and Outlets Dampers in most cases Temperature controlled within 1C Eliminate conflicts with cooling Zone adjustment capability required Automatic humidity control required

HVAC Efficiencies Table of minimum efficiencies Gas-fired boilers 90% AFUE Gas-fired furnaces 92% AFUE Gas-fired fireplaces 62.4% FE Air conditioners, air cooled 14 or 14.5 SEER Concern: Table includes equipment even where there is no specified minimum efficiency

Ventilation HRVs optional Reduced level of insulation may be installed in the building envelope Where used must have: Sensible heat recovery efficiency of 60%

Service Water Service water = domestic water heating equipment Gas-fired storage tanksEF> 0.62 ElectricEt > 98% Gas-fired tankless 0.8 Heat traps above water heaters NOT required

Performance Path No EnerGuide specified Comparison between Reference House and Proposed House Reference house = prescriptive requirements

Top Issues From Review Variation in degree-days Fireplaces as heating appliances Overlap of insulation to foundation HRV installation Tall walls/trade-off Guidance for plans examiners Calculating walk-out basements

Costing Dave

Questions Additional Information: