TGad September 2010 Closing Report April 2007 doc.: IEEE 802.11-07/0570r0 September 2010 TGad September 2010 Closing Report Date: 2009-09-16 Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation
April 2007 doc.: IEEE 802.11-07/0570r0 September 2010 Abstract This document is the closing report for TGad for the September 2010 session. Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation
Work Completed Comment resolution completed on D0.1, 10/717r15 September 2010 Work Completed Comment resolution completed on D0.1, 10/717r15 TG approved Coexistence Assurance document, 10/1025r3 TG approved motion for Letter Ballot on D1.0 Update to ITU-R 60GHz liaison report approved in joint meeting with 802.15, 10/824r4 Eldad Perahia, Intel Corporation
Motion for Working Group Letter Ballot September 2010 Motion for Working Group Letter Ballot Having approved changes to TGad Draft 0.4, as defined in 11-10/717r15, Instruct the editor to prepare TGad Draft 1.0, and Approve a 30 day Working Group Technical Letter Ballot asking the question “Should TGad Draft 1.0 be forwarded to Sponsor Ballot?” Moved by Eldad Perahia on behalf of TGad TGad vote: Moved: Assaf Kasher, Seconded: Shu Kato, Result: 38-0-0 Eldad Perahia, Intel Corporation
Goals for November 2010 Comment resolution on D1.0 CA Doc review April 2007 doc.: IEEE 802.11-07/0570r0 September 2010 Goals for November 2010 Comment resolution on D1.0 CA Doc review CWPAN liaison Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation
Conference call times Previously approved conference calls April 2007 doc.: IEEE 802.11-07/0570r0 September 2010 Conference call times Previously approved conference calls Not overlap with TGac Aug 19, Sept 2, Sept 30 10:00-12:00 ET Aug 12, 26, Sept 23, Oct 7 20:00-22:00 ET New conference calls Not overlap with TGac Oct 14, Oct 28, Nov 18, Dec 9 10:00 – 12:00 ET Oct 21, Nov 4, Dec 2 20:00-22:00 ET Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation