Developing an Existing Piping Assets Traceability & Tracking Strategy

Slides:



Advertisements
Similar presentations
Test Automation Success: Choosing the Right People & Process
Advertisements

© 2005 by Prentice Hall Appendix 2 Automated Tools for Systems Development Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
© 2011 Underwriters Laboratories Inc. Product Recall and the Supply Chain: ISO Best Practices Robert Pollock Chair, US Technical Advisory Group for ISO.
Omercan Barut Dokuz Eylul University Industrial Engineering.
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
ABB Reliability Fingerprint
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Hyperion EPM Overview & Case Study.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
ISO 9000 Certification ISO 9001 and ISO
Software Engineering Institute Capability Maturity Model (CMM)
Computerised Maintenance Management Systems
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
Basics of Good Documentation Document Control Systems
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Internal Auditing and Outsourcing
Systems Analysis and Design: The Big Picture
An Introduction to AlarmInsight
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
PMP® Exam Preparation Course
Introduction to ISO New and modified requirements.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Quality Directions Australia Improving clinical risk management systems: Root Cause Analysis.
Industrial Engineering Roles In Industry
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
Document Control Basics of Good Documentation and
Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Applying Business Process Re-engineering
Jump Starting the Value Proposition of ISO Asset Management through Rapid Asset Identification Lou Peeples Director of Sales Camcode.
Georgia Institute of Technology CS 4320 Fall 2003.
Merger Integration, Process Improvement, Increased Collections And Cost Reduction within a Pharmaceutical Firm BackgroundBackground The client is a major.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Data Report July Collect and analyze RtI data Determine effectiveness of RtI in South Dakota in Guide.
Chapter 1: Fundamental of Testing Systems Testing & Evaluation (MNN1063)
Computerised Maintenance Management Systems
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
CMMI Certification - By Global Certification Consultancy.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
Introduction to Software Project Management Lecture1.
Tom Coolidge, Esri Tom DeWitte, Esri Dave Twichell, Esri
Title of presentation Name(s) of author / presenter / co-authors
Awareness program on ISO/TS16949:2002
Applying Business Process Re-engineering
Implementation Strategy July 2002
SYSTEMS ANALYSIS Chapter-2.
Program Control Services – Overview
Traceability of Gas Pipeline Materials Research & Materials Manager
CLINICAL INFORMATION SYSTEM
Implementing a Reliability Program
SNC/SCANA – New Build Configuration Management
Enterprise Program Management Office
PREVENTIVE MAINTENANCE
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Operations Management
How to conduct Effective Stage-1 Audit
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
Role of State Audit Bureau of Kuwait in promoting and audit of IT Security  
HR AUDIT (An Early Evaluation System) (An Early Evaluation System) S.Jayaprakash., M.Sc (IT), PGD.HRM, DLL & AL.
Presentation transcript:

Developing an Existing Piping Assets Traceability & Tracking Strategy Alan Cunningham acunningham@camcode.com Lou Peeples lpeeples@camcode.com

Agenda Current State of Asset Management Implications Program Setup Project Implementation Conclusions

Current State Most asset intensive companies have poor data quality & visibility of their asset database Lack of adequate traceability for plastic pipe & components Poor tracking of field pipe locations Large asset infrastructure with poor data quality

Implications Excessive pipe excavations during recalls Difficult to determine cause/origin of an incident No ability to determine whether plastic pipe or component failures caused issue Difficult to identify systemic issues related to incidents involving plastic pipe Increased costs and loss of revenue Preventable accidents can occur

Traceability & Tracking Problem Space % Reduction in Excavation Costs % Quicker Response to Recalls % Improvement in Predictive Maintenance Business Outcomes Asset Classes Asset Population Asset Locations Marking Policy Traceability & Tracking Marking Specifications Data Requirements MDM Existing Piping Assets Data Gathering Barcode Installation

Implementing Barcodes on Existing Piping Assets Steps in the Planning Process Establish Implementation Team Define Scope of Work and Project Requirements Establish Project Phases and Tasks Define Marking Approach Pilot Project, Phased or Big Bang approach Determine Resources & Cost Examine Outcomes of Project

Project Team Program Setup Project Implementation Program Manager Data Specialist Engineering Authority Project Implementation Project Manager Data Gathering Teams Barcode Installation

Scope of Work Develop Marking Policy & Plan Goal Establish Asset Classes to be marked Assess the Asset Population to be Marked Assess Asset Locations within the pipeline Goal Defined list of assets to mark by asset class by location

Project Requirements Engineering Plan Data Strategy Data Gathering Barcode Production Barcode Installation

Engineering Plan Engineering Conundrum Asset Marking Complications “Marking of all pipe and components to ensure identification for a period of 50 years or the life of the pipeline” Asset Marking Complications UV Exposure Weather Exposure Sea Salt Corrosion Variety of Mating Surfaces Variety of Attachment Methods

Substrate Selection Existing Utility & U.S. Military specifications for durable outdoor life of the part marking GGP–455b Mil–P–1502D Mil–P–19834B Mil–P514D

Results of Incorrect Marking Decisions

Engineering Assessment Marking method Surface preparation Standard Operating Procedures Training manuals Develop Engineering Drawings by Asset Class Photos Label Locations Attachment Methods Required Data Fields

Data Strategy Examine the Master Data Management requirements Review traceability asset data fields to collect Location of Manufacture Lot Information Size Material Pressure Rating Temperature Rating Type, Grade & Model Review tracking data fields to collect Location of pipe & piping components within the pipeline

Data Gathering Establish Data Gathering Teams Use Data Gathering Tools Create a template mapped to the data fields Most expensive part is labor so ensure all fields are known before starting Take pictures of assets as no extra time or cost Condition, label location, data plate Marking Spec

Benefits Engineering Assessments Data Gathering Ease of training Create efficiencies in install Ensures mark last life of the part Consistency across your enterprise Recommend to suppliers for new parts Library of documentation for asset population Ensures tags are not made using incorrect data Staged outside asset registry so easier to centrally manage data remediation

Mark Production and Installation Barcode Manufacturing Sequential numbers vs. specific tag Different designs for different asset types Human Readable Information on that tag? Kitting for installation vs. sending bags of tags Barcode Installation What is the optimal plan for the most cost efficient installation? Project Timeline can be weather dependent (Adhesive 50F) Pipeline layout (Grids) Data Fields to validate Resource considerations vs. time/cost Outsource labor or use internal

Project Implementation - Pilot Project Start with a pilot project (2,000 - 10,000 assets) Engineering Assessments (50 - 100 asset families) Data collection Tagging at pilot location Outcomes of the Pilot Assess data quality? Confirm engineering assessments? Establish speed of data gathering & installation?

Project Implementation Determine Resource Allocation and Timeframe Budget and personnel Internal Resources vs. External Resources Assign a project manager to oversee project Set Data Gathering/Installation expectations Speed is roughly 100 – 250 assets per man per day Installation Variables include: Distance between assets Data fields to collect Number of available escorts Attachment method

Project Completion Project/Stage Completion Project Review & Lessons Learned Review of data discrepancies Plan for new asset acquisition and existing spares Assess Project Against Success Parameters On Time & On Budget Data Quality Improvements Assess Business Outcomes % Reduction in Excavation Costs? % Quicker Response to Recalls? % Improvement in Predictive Maintenance?

Camcode Company was incorporated in 1946 ISN rated & ISO 9001:2008 certified Camcode specializes in enterprise-level data/barcoding solutions We assist with: Asset Tracking Item Identification Work in Process Data Remediation Barcode Best Practises Barcode Service Solutions

Camcode Camcode offers Barcode services covering: Barcode Policy Project Management Data Management Barcode Engineering Services Data Gathering Barcode Production Barcode Installation Custom Reporting

Conclusions Importance of Traceability & Tracking Policy & Plan Permanence – get it right the first time Tagging/Data collection done improperly Increases your costs (People time is the greatest cost, not tags) Leads to incomplete or incorrect data capture Commonality Corporate-wide policy allows facilities to work from a set of common rules Lowers costs so each plant is not reinventing the wheel Lowers maintenance costs as every engineer and maintenance staff understands what tag, how to attach it, where it is etc. 

Questions? Alan Cunningham acunningham@camcode.com Lou Peeples lpeeples@camcode.com