Case Study on Selection of a Work and Asset Management System

Slides:



Advertisements
Similar presentations
Introduction to Integrated Library Systems
Advertisements

System Construction and Implementation Objectives:
Test Long and Prosper presented by Janet Gray July 26, 2005.
The System Development Life Cycle
David Boyd & Associates Integrated Tax System Procurement Assistance David Boyd & Associates.
Project Scope Management
GAI Proprietary Information
Client Interview & Requirements Gathering Workshop ITEC 455 Business Requirements Analysis September 28, 2010 Marisa Thomas, Jesse Felter, Don Draper Deloitte.
Discovering Computers Fundamentals, 2011 Edition Living in a Digital World.
Chapter 5: Project Scope Management
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 5: Project Scope Management
ECM Project Roles and Responsibilities
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Introduction to Software Testing
Release & Deployment ITIL Version 3
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004 Presenter: Anna Mosupyoe and Ravi Moodley Date: 24 January 2012 Time: 10:00.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Effective Methods for Software and Systems Integration
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
ITIL & COBIT O6PLM Kevin Lisay – Rendy Winarta –
Project Scope Management Process
Teaching material for a course in Software Project Management & Software Engineering – part II.
Chapter 5: Project Scope Management Information Technology Project Management.
SOFTWARE TESTING Scope of Testing  The dynamic Indian IT industry has always lured the brightest minds with challenging career.
Project Scope Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original presentation.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
第 11 組 MIS 報告. Phases of any information system ~ recognition of a business problem or opportunity ~ recognition of a business problem or opportunity.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
Irish Institute of Training & Development JOHN SMITH & TREVOR DAGG.
1 Advanced Computer Programming Project Management: Basics Copyright © Texas Education Agency, 2013.
MANAGEMENT INFORMATION SYSTEM
The System Development Life Cycle
ITEC 275 Computer Networks – Switching, Routing, and WANs
ERP Proposal Evaluation Team Training
Rapid Launch Workshop ©CC BY-SA.
Essential Needs of Software Test Automation
CompSci 230 Software Construction
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004
Regression Testing with its types
Path to Accelerated Sales Growth
Test Around the Clock Testing Revolutionized
SOFTWARE TESTING OVERVIEW
Award Management Services
It’s not all about the tool!
Changing TPAs: What to Consider
Department of Financial Services Bureau of Auditing
Select and Implement a Web Experience Management Solution
VP, Institutional Services
Enterprise Content Management Owners Representative Contract Approval
IS442 Information Systems Engineering
Description of Revision
Making UAT More Effective
VENDORS, CONSULTANTS AND USERS
The System Development Life Cycle
EIS Project Status Briefing
Introduction to Software Testing
FIS Financial Information System Procurement Approach - FIS project -
System Review – The Forgotten Implementation Step
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Avoiding failure when implementing an enterprise system
Systems Construction and Implementation
Presentation to Project Certification Committee, DoIT August 24, 2008
System Construction and Implementation
Re-Purposing and Reusing Training Materials Online
Systems Construction and Implementation
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Case Study on Selection of a Work and Asset Management System

In 2007 South Jersey Gas underwent an internal management audit. One of the findings from the audit recommended replacing SJG’s paper based system and implementing a Work and Asset Management System. Accepting the recommendation from the audit, SJG decided to move forward in researching and selection of a WMS.

So, how do you get started??

Business Processes The first step was to document our business processes. With the aid of a consulting firm, SJG started the documentation. As-Is -- All business processes were documented. Key business representatives were charged with verifying existing processes. All processes were validated by the business owners as correct. To-Be – Processes were developed as to how they could be automated and improve efficiencies.

Requirements A team was constructed to write the system requirements. Core team was comprised of: Utility Department Operations Department Construction Department Compliance Department Design/Engineering Permit Department Scheduling Department Sales/Marketing Department Finance/Accounting Department Process Management Requirements need to be very detailed in what was expected from the new system – vague requirements such as “system should be able to”… leaves the intent of the requirement open to interpretation.

Selection of Vendor/Product SJG sent out Requests For Information requests from many vendors to demo their product. We had seven vendors show interest resulting from the RFI. By the time we went out for RFP, only three bid on the project. After the demos, SJG invited those whose product was most suited for our business to do a “scripted demo”.

Selection of Vendor/Product After the selection of the software it was important to select the right implementer. The group you select can make or break your implementation. References were gathered from other similar utilities that had installed a similar system.

Selection of Vendor/Product Detailed scripts based on our requirements were created in an effort to verify that the system/vendor could deliver what they claimed. Multiple days were set aside to run through the scripts with all of our SME’s present.

System Build Draw a balance between “Out of the Box” and “Configuration Required” No system will fit all of your needs out of the box. Try to keep configurations to a minimum, but keep in mind, they will be necessary.

System Build A “Full Time” team from SJG was put together to work with the consultants. Part Time involvement did not work. The team had to be dedicated full time to the project. Write your “To-Be” processes. They will be your road map to how you will do business in the future.

Sample To-Be Process

System Build DO NOT allow the project to become an IT project. IT has to play a major role, but this is a business system built for the business. Do not allow “scope creep”. As we moved through the project, end users continually came up with new requests. If not in scope, keep a parking lot of the requests for future consideration. If the project scope is not locked down, the system will never be built.

Change Management From the very start of the project, a strong “Change Management” plan is required. If you don’t have a trained Change Management Professional, get one. Full support from Executive Management Team is a necessity.

Change Management Don’t fall into the trap that the “end users” will be the road block in rolling out a new system. Mid-level management and First line supervision can make or break the successful implementation of a new system

Testing The general objective of testing is to systematically exercise and prove the business functionality, using data and business process scenarios. The testing is done in stages to progressively build on successful results, thus providing a manageable way to validate core business functionality and reduce the risks in the system prior to placing it in production. Data Conversion Integration Unit Testing Functional Testing Reports User Acceptance End to End Defects Regression

Training Training needs to be more than navigation of system. Changed business processes need to be thoroughly covered in the training sessions. It is imperative that consistent training is given to all employees. Do not train one group one way and another group differently. Train first line supervisors first. This empowers them in the assistance of their direct reports by understanding the new software and processes. The training manuals should be in a format in which they can be used for future reference by the end users.

Post Production Support The core team needs to be kept for a period of time for support of the program after implementation. Have a proper sized support team. EXPECT DEFECTS. No matter how well built or tested, there will be issues. End users will start requesting enhancements of the system.

Questions???